Difference between revisions of "Run Group A"

From clas12-run
Jump to navigation Jump to search
Line 86: Line 86:
 
| valign=top width=50% |
 
| valign=top width=50% |
  
== <font color=blue>''' Run Plan: April 2-3, 2019'''</font>==
+
== <font color=blue>''' Run Plan: April 4-5, 2019'''</font>==
(Last updated: April 2nd, 2019 @ 10:45 am)
+
(Last updated: April 4nd, 2019 @ 8:15 am)
  
 
<b>DAQ config: PROD66; Trigger file: rga_v2.trg</b>
 
<b>DAQ config: PROD66; Trigger file: rga_v2.trg</b>
Line 111: Line 111:
 
* Take low current production at 10 nA for 4 hr.
 
* Take low current production at 10 nA for 4 hr.
 
-->
 
-->
* Take production data at 50 nA in 4 hr runs
+
* Take production data at 50 nA in 4 hr runs!
* ~1 hour RF Recovery during Hall D access planned for 1:30pm-2:30pm
+
* Friday Morning (04/05) Raffaella will take a FT calibration run
* Call RC when beam is available
+
 
* Make sure all all detectors (MVT in safe mode) and take 5 nA to faraday cup. Check halo rates and beam position, then take a harp scan at 2H01 to see if beam is acceptable. Confirm with RC and beamline expert. Make a log entry.
+
*Note: <font color=red>DO NOT IGORE</font> unsafe FSD masking alarm!
* Take production data at 50 nA in 4 hr runs
 
  
  

Revision as of 08:21, 4 April 2019