Line 216: Line 216:
 
# ALL the detectors must be off.  
 
# ALL the detectors must be off.  
 
# Ask MCC to energize the tagger magnet.  
 
# Ask MCC to energize the tagger magnet.  
# Ask MCC for 5 nA and check the beam quality using harp scans 2C21 and 2C24, following the procedures described in [https://wiki.jlab.org/clas12-run/images/e/e3/Estab_beam.pdf]
+
# Ask MCC for 5-9 nA and check the beam quality using harp scans 2C21 and 2C24, following the procedures described in [https://wiki.jlab.org/clas12-run/images/e/e3/Estab_beam.pdf]
# When the beam quality is acceptable, Call MCC and ask for a low-intensity (~5nA) beam to FC, complete harp scans. Procedures described in [https://wiki.jlab.org/clas12-run/images/9/9f/HarpScanManual.pdf]. We require less than 0.3 mm (1σ) beam widths in x and y (As measured by 2H01A harp) and halo below 10^−4 (As measured by 2H01A harp).
+
# When the beam quality is acceptable, Call MCC and ask for a low-intensity (~5-9 nA) beam to FC, complete harp scans. Procedures described in [https://wiki.jlab.org/clas12-run/images/9/9f/HarpScanManual.pdf]. We require less than 0.3 mm (1σ) beam widths in x and y (As measured by 2H01A harp) and halo below 10^−4 (As measured by 2H01A harp). See references below.
# Center beam on target, using rates in BOM and downstream beam monitors. Establish range where beam starts directly interacting with target walls and take middle.
+
# ONLY if instructed by RC: -> Center beam on target, using rates in BOM and downstream beam monitors. Establish range where beam starts directly interacting with target walls and take middle.
 
# Engage orbit locks and ascertain that they are stable.
 
# Engage orbit locks and ascertain that they are stable.
 
# Set alarms and interlocks.
 
# Set alarms and interlocks.
Line 230: Line 230:
 
## Call MCC to unmask U/M/D counters but keep BOM masked or get it masked in case it isn't
 
## Call MCC to unmask U/M/D counters but keep BOM masked or get it masked in case it isn't
 
## Put thresholds on U/M/D as 1M/1M/1M and dwell time 50 ms.
 
## Put thresholds on U/M/D as 1M/1M/1M and dwell time 50 ms.
## Call MCC to put 5nA to the FC.
+
## Call MCC to put 5-9nA to the FC.
 
## Compare the 2c21, 2c24, 2H01 positions and beam overview screen to the reference below  
 
## Compare the 2c21, 2c24, 2H01 positions and beam overview screen to the reference below  
 
## follow the procedures for the harp scans at 2H01 [https://wiki.jlab.org/clas12-run/images/9/9f/HarpScanManual.pdf] (also do harp scans on 2C24)
 
## follow the procedures for the harp scans at 2H01 [https://wiki.jlab.org/clas12-run/images/9/9f/HarpScanManual.pdf] (also do harp scans on 2C24)

Revision as of 17:51, 2 September 2020

[edit]

Shift Schedule

Shift Checklist

Hot Checkout

Beam Time Accounting

  • See guidance for BTA in

Beam Time Accounting User Guide.

Manuals

Procedures

JLab Logbooks


RC schedule Weekly form

  • Feb 12 - Feb 18: Mohammad Hattawy
  • Feb 19 - Feb 25: Florian Hauenstein
  • Feb 26 - Mar 3: Eric Christy
  • Mar 4 - Mar 19: Sebastian Kuhn
  • Mar 18 - Mar 23: Carlos Ayerbe

  • RC & RTPC expert list [1]
  • 07/31 - 08/04 : Narbe Kalantarian
  • 08/05 - 08/11 : Stephen Bueltmann
  • 08/12 - 08/18 : Carlos Ayerbe Gayoso
  • 08/20 - 08/21 : Mohammad Hattawy
  • 08/22 - 08/25 : Sebastian Kuhn
  • 08/26 - 09/01 : Mohammad Hattawy
  • 09/02 - 09/08 : Sebastian Kuhn
  • 09/09 - 09/15 : Mohammad Hattawy
  • 09/16 - 09/21 : (Mohammad Hattawy)


Daily Run Group F Coordination Meetings Daily at 12:00 pm. Bluejeans = 757 683 5804


Daily Ops Meeting (working days 7:45):
BlueJeans = 569 476 853


Clas12design.png