=== Short term plan  ===
 
=== Short term plan  ===
# Keep taking data on D2 as long as 2H01 vacuum stays below 10^-4
+
# Turn off all the detectors.
# If vacuum deteriorates and halo/BOM counts increase, reduce beam current as necessary to keep the trigger rate around 2 kHz
+
# Establish the beam on the tagger using 5nA beam and compare the harp scans to the references (blank collimator, beam type photon, FSDs U/M/D/BOM are masked))
# If vacuum gets worse than 2-3 x 10^-4, call RC and prepare to stop beam.
+
# if beam is acceptable, call mcc and tell them to take the beam away and prepare for a moller run
# If we can, we will continue taking D2 production data until about noon on Tuesday, 9/8. Then we will make a controlled access to fix the beam line (including exit window).
+
# call mcc and ask for 4nA beam and take a moller run.
 +
# take the beam away and exit the moller configuration.
 +
# take another harp scans on 2c21 and 2c24 using 5 nA beam current, if they are good ask mcc to take the beam away and de-gauss the tagger magnet.
 +
# prepare for beam to FC:
 +
## All HV are off (including FTOF and RTPC)
 +
## Check that 20 mm collimator is in
 +
## Call MCC to unmask U/M/D counters but keep BOM masked or get it masked in case it isn't
 +
## Put thresholds on U/M/D as 1M/1M/1M and dwell time 50 ms.
 +
## Call MCC to put 5-9nA to the FC.
 +
## Compare the 2c21, 2c24, 2H01 positions and beam overview screen to the reference below
 +
## follow the procedures for the harp scans at 2H01 [https://wiki.jlab.org/clas12-run/images/9/9f/HarpScanManual.pdf] (also do harp scans on 2C24)
 +
## Compare the results with the references scans below (be aware to use the correct analysis counter)
 +
## if what you get is similar to the references, call MCC and tell them the the beam is acceptable and set FSD thresholds and dwelltimes as written below and continue with production running
 +
## if what you get isn't similar to the references or If you are not sure if a tune of the beam is needed, consult beamline expert and/or RC.
 +
# Perform target scan using 10 nA beam current (RC or beamline expert job)
 +
 
  
 
General plan: Follow a sequence of 6 Days D2 (240 nA), 2 shifts H2 (240 nA), 1 2-hour run empty (250 nA) and 10M events on 4He (240 nA).
 
General plan: Follow a sequence of 6 Days D2 (240 nA), 2 shifts H2 (240 nA), 1 2-hour run empty (250 nA) and 10M events on 4He (240 nA).
Line 226: Line 241:
 
# Set alarms and interlocks.
 
# Set alarms and interlocks.
 
# Call the MCC and tell them that the beam is good and must keep the beam current at 5 nA.
 
# Call the MCC and tell them that the beam is good and must keep the beam current at 5 nA.
# TURN HV ON for all the detectors.Don't forget the FT and RTPC HV (separate GUIs). </font>
 
  
=== Checking the beam profiles and positions ===
 
# Doing harp scans on FC:
 
## All HV are off (including FTOF and RTPC)
 
## Check that 20 mm collimator is in
 
## Call MCC to unmask U/M/D counters but keep BOM masked or get it masked in case it isn't
 
## Put thresholds on U/M/D as 1M/1M/1M and dwell time 50 ms.
 
## Call MCC to put 5-9nA to the FC.
 
## Compare the 2c21, 2c24, 2H01 positions and beam overview screen to the reference below
 
## follow the procedures for the harp scans at 2H01 [https://wiki.jlab.org/clas12-run/images/9/9f/HarpScanManual.pdf] (also do harp scans on 2C24)
 
## Compare the results with the references scans below (be aware to use the correct analysis counter)
 
## if what you get is similar to the references, call MCC and tell them the the beam is acceptable and set FSD thresholds and dwelltimes as written below and continue with production running
 
## if what you get isn't similar to the references or If you are not sure if a tune of the beam is needed, consult beamline expert and/or RC.
 
  
 
<b> Default solenoid current and B field </b> 1800 A (~3.78 T)
 
<b> Default solenoid current and B field </b> 1800 A (~3.78 T)

Revision as of 20:42, 9 September 2020

[edit]

Shift Schedule

Shift Checklist

Hot Checkout

Beam Time Accounting

  • See guidance for BTA in

Beam Time Accounting User Guide.

Manuals

Procedures

JLab Logbooks


RC schedule Weekly form

  • Feb 12 - Feb 18: Mohammad Hattawy
  • Feb 19 - Feb 25: Florian Hauenstein
  • Feb 26 - Mar 3: Eric Christy
  • Mar 4 - Mar 19: Sebastian Kuhn
  • Mar 18 - Mar 23: Carlos Ayerbe

  • RC & RTPC expert list [1]
  • 07/31 - 08/04 : Narbe Kalantarian
  • 08/05 - 08/11 : Stephen Bueltmann
  • 08/12 - 08/18 : Carlos Ayerbe Gayoso
  • 08/20 - 08/21 : Mohammad Hattawy
  • 08/22 - 08/25 : Sebastian Kuhn
  • 08/26 - 09/01 : Mohammad Hattawy
  • 09/02 - 09/08 : Sebastian Kuhn
  • 09/09 - 09/15 : Mohammad Hattawy
  • 09/16 - 09/21 : (Mohammad Hattawy)


Daily Run Group F Coordination Meetings Daily at 12:00 pm. Bluejeans = 757 683 5804


Daily Ops Meeting (working days 7:45):
BlueJeans = 569 476 853


Clas12design.png