Difference between revisions of "Run Group F"

From clas12-run
Jump to navigation Jump to search
Line 206: Line 206:
 
## if what you get is similar to the references, call MCC and tell them the the beam is acceptable and set FSD thresholds and dwelltimes as written below and continue with production running  
 
## if what you get is similar to the references, call MCC and tell them the the beam is acceptable and set FSD thresholds and dwelltimes as written below and continue with production running  
 
## if what you get isn't similar to the references or If you are not sure if a tune of the beam is needed, consult beamline expert and/or RC.
 
## if what you get isn't similar to the references or If you are not sure if a tune of the beam is needed, consult beamline expert and/or RC.
# Perform target scan using 10 nA beam current (RC or beamline expert job)
+
# EVERYTHING ABOVE IS DONE AND OK. Here are the next steps:
 +
## MCC expert calibrate 2H01
 +
## Unmask and set all FSD parameters to nominal
 +
## Do a quick position scan on the 2H01 (target) using 10 nA beam current (RC or beamline expert job). This should be done with MCC on speakerphone so they can continuously move the beam in x or y (both directions) until a significant increase (>50%) in BOM count rate is seen. Note the 4 edges and center beam in middle.
 +
## Ramp up all HV
 +
## Start running on D2 with 200 nA
  
  

Revision as of 08:31, 10 September 2020

[edit]

Shift Schedule

Shift Checklist

Hot Checkout

Beam Time Accounting

  • See guidance for BTA in

Beam Time Accounting User Guide.

Manuals

Procedures

JLab Logbooks


RC schedule Weekly form

  • Feb 12 - Feb 18: Mohammad Hattawy
  • Feb 19 - Feb 25: Florian Hauenstein
  • Feb 26 - Mar 3: Eric Christy
  • Mar 4 - Mar 19: Sebastian Kuhn
  • Mar 18 - Mar 23: Carlos Ayerbe

  • RC & RTPC expert list [1]
  • 07/31 - 08/04 : Narbe Kalantarian
  • 08/05 - 08/11 : Stephen Bueltmann
  • 08/12 - 08/18 : Carlos Ayerbe Gayoso
  • 08/20 - 08/21 : Mohammad Hattawy
  • 08/22 - 08/25 : Sebastian Kuhn
  • 08/26 - 09/01 : Mohammad Hattawy
  • 09/02 - 09/08 : Sebastian Kuhn
  • 09/09 - 09/15 : Mohammad Hattawy
  • 09/16 - 09/21 : (Mohammad Hattawy)


Daily Run Group F Coordination Meetings Daily at 12:00 pm. Bluejeans = 757 683 5804


Daily Ops Meeting (working days 7:45):
BlueJeans = 569 476 853


Clas12design.png