General plan: Follow a sequence of 6 Days D2 (240 nA), 2 shifts H2 (240 nA), 1 2-hour run empty (250 nA) and 10M events on 4He (240 nA).
 
General plan: Follow a sequence of 6 Days D2 (240 nA), 2 shifts H2 (240 nA), 1 2-hour run empty (250 nA) and 10M events on 4He (240 nA).
  
=== Short term plan  ===
+
 
# prepare for beam to FC:
 
## change beam type to Electron.
 
## All HV are off (including FTOF and RTPC)
 
## Check that 20 mm collimator is in
 
## Call MCC to unmask U/M/D counters but keep BOM masked or get it masked in case it isn't
 
## Put thresholds on U/M/D as 1M/1M/1M and dwell time 50 ms.
 
## Call MCC to put 5-9nA to the FC.
 
## Compare the 2c21, 2c24, 2H01 positions and beam overview screen to the reference below
 
## follow the procedures for the harp scans at 2H01 [https://wiki.jlab.org/clas12-run/images/9/9f/HarpScanManual.pdf] (also do harp scans on 2C24)
 
## Compare the results with the references scans below (be aware to use the correct analysis counter)
 
## if what you get isn't similar to the references or If you are not sure if a tune of the beam is needed, consult beamline expert and/or RC.
 
# EVERYTHING ABOVE IS DONE AND OK. Here are the next steps:
 
## MCC expert calibrate 2H01
 
## Unmask and set all FSD parameters to nominal - call MCC and tell them the the beam is acceptable and set FSD thresholds and dwelltimes to the standard values below
 
## Do a quick position scan on the 2H01 (target) using 10 nA beam current (RC or beamline expert job). This should be done with MCC on speakerphone so they can continuously move the beam in x or y (both directions) until a significant increase (>50%) in BOM count rate is seen. Note the 4 edges and center beam in middle.
 
## Ramp up all HV
 
## Start running on D2 with 200 nA
 
  
  
Line 245: Line 228:
  
 
<b> Nominal Beam Positions </b>
 
<b> Nominal Beam Positions </b>
''(last update Aug 29th, 2020 @ 02:20 AM)''
+
''(last update Sep 10th, 2020 @ 06:00 PM)''
*2H01, X: +0.2 mm, Y: -1.3 mm
+
*2H01, X: +1.6 mm, Y: -1.9 mm
 
*2C24, X: -3.7 mm, Y: -1.7 mm
 
*2C24, X: -3.7 mm, Y: -1.7 mm
 
*2C21, X: -0.4 mm, Y: 0.3 mm
 
*2C21, X: -0.4 mm, Y: 0.3 mm

Revision as of 18:03, 10 September 2020

[edit]

Shift Schedule

Shift Checklist

Hot Checkout

Beam Time Accounting

  • See guidance for BTA in

Beam Time Accounting User Guide.

Manuals

Procedures

JLab Logbooks


RC schedule Weekly form

  • Feb 12 - Feb 18: Mohammad Hattawy
  • Feb 19 - Feb 25: Florian Hauenstein
  • Feb 26 - Mar 3: Eric Christy
  • Mar 4 - Mar 19: Sebastian Kuhn
  • Mar 18 - Mar 23: Carlos Ayerbe

  • RC & RTPC expert list [1]
  • 07/31 - 08/04 : Narbe Kalantarian
  • 08/05 - 08/11 : Stephen Bueltmann
  • 08/12 - 08/18 : Carlos Ayerbe Gayoso
  • 08/20 - 08/21 : Mohammad Hattawy
  • 08/22 - 08/25 : Sebastian Kuhn
  • 08/26 - 09/01 : Mohammad Hattawy
  • 09/02 - 09/08 : Sebastian Kuhn
  • 09/09 - 09/15 : Mohammad Hattawy
  • 09/16 - 09/21 : (Mohammad Hattawy)


Daily Run Group F Coordination Meetings Daily at 12:00 pm. Bluejeans = 757 683 5804


Daily Ops Meeting (working days 7:45):
BlueJeans = 569 476 853


Clas12design.png