Line 188: Line 188:
  
 
===* Short Term Plan ===
 
===* Short Term Plan ===
Updated, Sep 17th @ 23:18.
+
Updated, Sep 18th @ 08:00.
# Collect events on H2 target till the beam goes dowm at 06:00AM, using 270 nA at 2C24 (what you request from MCC), which is 280 nA at the SLM.  
+
# Establish the beam on the tagger (all detectors off, all halo couter masked, collimator Blank, beam type is Photon) using 5 nA.
 +
# take harp scans on 2c21 and 2c25 and comapre them to the references.
 +
# if eveything is fine, call MCC to take the beam away and tell them that we will do a Moller run.
 +
# Configure the Moller run and ask MCC to send 4 nA beam and start the Moller run.
 +
# When you finish the Moller run end the run and submit the results.
 +
# Ask MCC to take the beam away and exit the Moller configuration.
 +
# Ask MCC to send 5 nA and do another harp scan on 2c24 to make sure nother changed during the Moller run.
 +
# if everything is good, call MCC to take the beam away and tell them that we will send 5 nA to FCup, and ask them to de-gauss the tagger magnet.
 +
# change beam type to Electron, Collimator 20 mm and change the FSD setting on the halo counters U/M/D/BOM 1M/1M/1M/masked and dwell time is 50 ms on all of them.
 +
# ask for 5nA with the old positions and make sure that the beam goes through the target to the FCup camera.
 +
# if everything is fine, ask MCC for 10 nA and do harp scans on 2H01 and 2C24.
 +
# if everything is fine get ready to start production on D2.
  
  

Revision as of 08:09, 18 September 2020

[edit]

Shift Schedule

Shift Checklist

Hot Checkout

Beam Time Accounting

  • See guidance for BTA in

Beam Time Accounting User Guide.

Manuals

Procedures

JLab Logbooks


RC schedule Weekly form

  • Feb 12 - Feb 18: Mohammad Hattawy
  • Feb 19 - Feb 25: Florian Hauenstein
  • Feb 26 - Mar 3: Eric Christy
  • Mar 4 - Mar 19: Sebastian Kuhn
  • Mar 18 - Mar 23: Carlos Ayerbe

  • RC & RTPC expert list [1]
  • 07/31 - 08/04 : Narbe Kalantarian
  • 08/05 - 08/11 : Stephen Bueltmann
  • 08/12 - 08/18 : Carlos Ayerbe Gayoso
  • 08/20 - 08/21 : Mohammad Hattawy
  • 08/22 - 08/25 : Sebastian Kuhn
  • 08/26 - 09/01 : Mohammad Hattawy
  • 09/02 - 09/08 : Sebastian Kuhn
  • 09/09 - 09/15 : Mohammad Hattawy
  • 09/16 - 09/21 : (Mohammad Hattawy)


Daily Run Group F Coordination Meetings Daily at 12:00 pm. Bluejeans = 757 683 5804


Daily Ops Meeting (working days 7:45):
BlueJeans = 569 476 853


Clas12design.png