Line 12: Line 12:
 
===[https://bta Beam Time Accounting]===
 
===[https://bta Beam Time Accounting]===
 
* See guidance at '''[https://accwiki.acc.jlab.org/pub/SWDocs/BeamTimeAccounting/Machine_Time_Accounting_User_Guide.pdf BTA User Guide]'''.
 
* See guidance at '''[https://accwiki.acc.jlab.org/pub/SWDocs/BeamTimeAccounting/Machine_Time_Accounting_User_Guide.pdf BTA User Guide]'''.
 +
===[https://www.jlab.org/Hall-B/run-web/rgc/ESAD_HallB-CLAS12_rgC.pdf ESAD], [https://www.jlab.org/Hall-B/run-web/rgc/COO_HallB-CLAS12_RGC.pdf COO], [https://www.jlab.org/Hall-B/run-web/rgc/RSAD_HallB-CLAS12_rgC.pdf RSAD], [https://www.jlab.org/div_dept/train/SAF111/Hall%20B%20worker%20Safety%20Training%20%28SAF111%29%20%2008%2001-12-1.pdf ERG] ===
 +
===[https://clasweb.jlab.org/wiki/images/e/ef/Longitudiannly_polarized_target_OSP.pdf Longitudinally Polarized Target OSP]===
 +
===[https://www.jlab.org/Hall-B/run-web/rgc/RICH_OSP_131114.pdf RICH OSP]===
 
   
 
   
 
| valign=top |
 
| valign=top |
Line 66: Line 69:
  
 
<!--- JUST MODIFY AND SAVE ANYTHING IN THIS COMMENT BLOCK TO FORCE A REFRESH OF THE PHONE NUMBERS TEMPLATE -->
 
<!--- JUST MODIFY AND SAVE ANYTHING IN THIS COMMENT BLOCK TO FORCE A REFRESH OF THE PHONE NUMBERS TEMPLATE -->
 
  
 +
= Short Term Schedule =
 
<!--#######################################  Short Term Schedule  #############################################-->
 
<!--#######################################  Short Term Schedule  #############################################-->
  
= Short Term Schedule =
+
<!-- === <font color=red size=6> '''ALL shifts are presently canceled until Monday, January 30, 8 AM. </font> ''' === -->
 +
 
  
 
=== <font color=blue size=4> ''' CLAS12 Run Group C </font> ''' ===
 
=== <font color=blue size=4> ''' CLAS12 Run Group C </font> ''' ===
  
'''Run Coordinator: Bryan McKinnon''' (9-)757 575-7540  
+
'''Run Coordinator: Mohammad Hattawy''' (9-)757 575-7540
  
 
''' PDL: Eugene Pasyuk '''  (9-)757 876-1789 , x6020 office
 
''' PDL: Eugene Pasyuk '''  (9-)757 876-1789 , x6020 office
Line 87: Line 91:
 
''' [https://userweb.jlab.org/~kuhn/RGC/RunPlan.pdf Longterm Run Plan] '''
 
''' [https://userweb.jlab.org/~kuhn/RGC/RunPlan.pdf Longterm Run Plan] '''
  
''' [https://userweb.jlab.org/~kuhn/RGC/RunPlan_FTout.pdf Medium-Term Run plan] (FTout portion) '''
+
''' [https://userweb.jlab.org/~kuhn/RGC/RunPlan_FTon2.pdf Medium-Term Run Plan] (FTon Portion Part 2) '''
  
 
== '''IMPORTANT SHIFT NOTES'''==
 
== '''IMPORTANT SHIFT NOTES'''==
 +
 
  * '''In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House'''
 
  * '''In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House'''
 
  * If you have symptoms or a positive '''COVID''' test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately so that replacements can be arranged.
 
  * If you have symptoms or a positive '''COVID''' test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately so that replacements can be arranged.
 +
* '''Remote shift:''' If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Worker Shift" Tab - you need some lead time to set up!
 +
 +
Note to shifts, please:
 +
* read the '''logbook''', be aware of previous 24 hours
 +
* arrive at least 10 minutes early for '''shift change'''
 +
* refresh the run wiki pages, look over them every shift:
 +
** follow the '''expert/worker shift instructions'''
 +
** find latest pitfalls and known issues under '''GENERAL INFORMATION'''
 +
* '''communicate''' with your co-shift person
 +
** the shift expert should know about and refer to logbook entries in their shift summary
 +
** the shift worker should discuss an issue with the shift expert before making extra logbook entries
  
* If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Worker Shift" Tab - you need some lead time to set up!
+
== '''Short Term Schedule for the Week from Wednesday, March 15th, to Monday March 20th, 2023''' ==
* <font color=red>'''Please refer to the information here and the Expert/Worker Shift instructions for each and every shift!'''</font>
 
  * Come to your shift in time for the '''shift change''', 10-15 minutes before the start of your shift.
 
  
== '''Short Term Schedule Wednesday, Nov. 2, 2022''' ==
+
* Current: 4 nA
  
STATUS:
+
* Run duration: 100M events or 4 hours, whichever comes first.
  
* Current: 8 nA
 
* Run duration: 100M events or 4 hours, whichever comes first
 
 
* Note, BOM is not installed for this experiment, so it does not matter whether it appears masked in FSD or not.
 
* Note, BOM is not installed for this experiment, so it does not matter whether it appears masked in FSD or not.
 +
 
* '''The Faraday Cup power limit''' for the continuous operation was lifted up to 1 kW. For the remainder of the RG-C the beam blocker should not be used  https://logbooks.jlab.org/entry/4047791  
 
* '''The Faraday Cup power limit''' for the continuous operation was lifted up to 1 kW. For the remainder of the RG-C the beam blocker should not be used  https://logbooks.jlab.org/entry/4047791  
* '''New conditions for raster operation:'''
+
 
 +
* '''Conditions for raster operation:'''
 
** IF there is any ammonia sample (NH3 and ND3) in the target, the raster '''MUST''' be operating at all times. The Raster FSD must be UNMASKED. Orbit locks MUST be OFF (except for brief moments to restore beam position).
 
** IF there is any ammonia sample (NH3 and ND3) in the target, the raster '''MUST''' be operating at all times. The Raster FSD must be UNMASKED. Orbit locks MUST be OFF (except for brief moments to restore beam position).
 
** For beam tuning or other non-rastered beam, the '''Raster FSD''' must be MASKED.
 
** For beam tuning or other non-rastered beam, the '''Raster FSD''' must be MASKED.
 +
** If MCC needs to '''diagnose beam with a harp''', we can offer them tagger 2C24 and follow the procedures required for that. '''2H01 harp scan should not be done when we have beam raster on.'''
 
** '''Changing raster offset''': ask MCC to NOT correct whatever happens on 2H01. Note new 2H01 values and inform MCC of the new 2H01 x and y values - then they can keep the beam at those positions.
 
** '''Changing raster offset''': ask MCC to NOT correct whatever happens on 2H01. Note new 2H01 values and inform MCC of the new 2H01 x and y values - then they can keep the beam at those positions.
* Experiment setup is "FTout/ELMO"
 
 
PLAN:
 
 
* If HWP is changed by Hall A (they will notify us), start a new run
 
 
* Wednesday: Beam will go down due to configuration change (Hall A) + separator maintenance.
 
**Hall will be in Restricted access to install and polarize NH3 (9am), and SAF111 training.
 
**Beam is expected to be back between 2pm and 4pm.
 
**When beam is back:
 
***Harp scans,
 
***Moller run (we expect ~80% polarization with the new Wien angle),
 
***raster size check,
 
***production.
 
 
* Thursday: Production data taking NH3-
 
** No other special plans
 
 
 
 
=== GENERAL INFORMATION ===
 
 
 
* '''BMT''':
 
** '''After HV trip''': the channel HV should be turned back on as soon as you notice the trip, power cycle by turning HV OFF and ON '''without waiting for any amount of time'''.
 
** '''HV frequently tripping''': Call expert. Do not change HVs without approval from the expert.
 
 
* '''Controlled access''': after you call MCC, they will drop the hall to controlled access once someone goes down and calls them for entry. Then call when they should go back to beam permit and call again to say you want the beam back and what beam current. Rapid access is controlled access without RadCon.
 
  
* '''mon12''': It can happen that histograms do not get cleared completely at run start. This is seen eg as an excess of small multiplicities. The remedy is to quit mon12 and open it again. Other than that, small multiplicities come from time intervals with beam down. You might want to look at the multiplicities before uploading the mon12 histograms in the logbook.
+
* Experiment setup is "FTon"
 
 
* '''DAQ''':
 
** clondaq6/data is full, switched to clondaq7, rastermon should be using ET on clondaq7
 
*** this means startup of rastermon via command line: rastermon --et --host clondaq7
 
*** see https://logbooks.jlab.org/entry/4066149, default for rastermon has been changed to clondaq7
 
** It should no longer be necessary to quit RasterMon at the end of each run and restart after a successful "Go" for the next run. However, if DAQ crashes, you SHOULD follow these steps, and the same for mon12.
 
 
* '''Magnet trip''': call "Engineering on call", if due to cryo, also inform the target expert about the cryogenic issues.
 
  
* '''CND CAMAC crate was off?''' Need to run the script to set the thresholds for CND CFDs.
+
* If HWP is changed, start a new run  
  
* '''Hall lights''': Before leaving the hall''' and going to beam permit check that dome lights, forward carriage lights, and pie tower lights are OFF.
+
=== PLAN for March 15-20, 2023 ===
 +
Note: an hour before changing the HWP, call Bill Henry (from Hall A) at 215-908-2245. He offered his help in optimizing the beam charge asymmetries when changing the HWP. He will stop by the counting house and run his code, which will take a minute. We will do the HWP changes during the day shifts.  
  
* '''Moller runs''': should be taken with 8-10 nA.
+
*Wednesday, March 15th: Beam study downtime starts at 8:00 AM. Beam is expected to be back by 15:00 PM. If they beam shows up before 22:00 PM, we will need to take a Moller run. Then, start taking data on ND3(+) (torus outbending, 4nA beam current, HWP IN).
 +
*Thursday, March 16th: Data taking on ND3 (+) (torus outbending, 4nA, HWP out)
 +
* Friday, March 17th: anneal the target and flip the polarization to negative. Will take about 3 hours starting around 9AM. Then, take data on ND3 (torus outbending, 4nA, HWP out)
 +
* Saturday, March 18th: Continue taking data on ND3(-) (torus outbending, 4nA, HWP IN)
 +
* Sunday, March 19th: Will change the target to C sometime in the day shift and start taking data. Will go to restricted access and will organize this between RadCon and Target Experts.
 +
* Till Monday, March 20th, 07:00 AM: Continue taking data till the beam goes away.  
  
* '''Beam viewer''': Please REMOVE the beam viewer unless we are actively tuning the beam or calibrating beam position/raster, to avoid damage to electronics, cameras etc.
+
* When the beam goes away:
 +
# Turn all HV OFF except SVT and BMT. For FT we turn HV OFF, but keep the chiller and LV ON, Raffaella will do some LED calibrations.
 +
# Solenoid will remain ON for the target group to do NMR studies.
 +
# The torus should be ramped down. Morgan or Denny can do it if they are around at that time, or call Eugene and he do it.
 +
# The hall should go to controlled access awaiting for radcon to come and do a full survey for restricted access.
  
* '''Change of running conditions'''
+
NOTES:
** Check that the trigger alarms (on rate/nA) are set appropriately and RC changes them as needed.
+
* Watch the beam positions (and thus the midstream halo counters) closely and ask MCC to adjust the positions if they are (on average) >=0.1mm off.
** Whenever the target type or polarization direction changes, or the half-wave plate status changes, make sure to enter a comment in the BEGIN RUN / END RUN comment box.
+
* Remember, the hall will only be dropped in controlled mode once someone goes downstairs and enters the hall. You/RadCon should do that right away after calling MCC.  
** Do not change running conditions while a run is ongoing. This includes changing target polarization or HWP, etc.
 
  
 
== <font color=blue> DAQ configuration </font> ==  
 
== <font color=blue> DAQ configuration </font> ==  
  
* Configuration is currently <tt>PROD67</tt>/<tt>PROD67_PIN</tt> (<tt>PROD66</tt>/<tt>PROD66_PIN</tt>), trigger file <tt>rgc_300MeV_v2.3_Q2_1.5GeV2.trg</tt>
+
* Configuration is currently <tt>'''PROD66'''</tt>/<tt>PROD66_PIN</tt>, trigger file <tt>'''rgc_300MeV_v1.4_no_DC.trg'''</tt>
 
* '''NOTE''': UNLESS a RICH problem crashes the DAQ, do NOT interrupt an otherwise smooth run to do a RICH recovery - instead do this in between runs.
 
* '''NOTE''': UNLESS a RICH problem crashes the DAQ, do NOT interrupt an otherwise smooth run to do a RICH recovery - instead do this in between runs.
* '''NOTE''': BOTH the shift expert AND the shift worker MUST check and reset monitoring histograms at least once every 30-60 minutes to make sure there are no major detector problems.'''Watch the raster pattern!'''
+
* '''NOTE''': BOTH the shift expert AND the shift worker MUST check and reset monitoring histograms at least once every 30-60 minutes to make sure there are no major detector problems. Sometimes it is the only way to know that a roc needs to be rebooted. '''Watch the raster pattern!'''
 
* At the end of each run, follow the <font color=red>STANDARD DAQ RESTART SEQUENCE</font>:
 
* At the end of each run, follow the <font color=red>STANDARD DAQ RESTART SEQUENCE</font>:
 
** "end run".
 
** "end run".
Line 177: Line 165:
 
* After each step, make sure it is completed in the Run Control message window. If a ROC has crashed, find which one it is, issue a roc_reboot command ON JUST THAT ROC and try again. Contact the DAQ expert if there are any questions.
 
* After each step, make sure it is completed in the Run Control message window. If a ROC has crashed, find which one it is, issue a roc_reboot command ON JUST THAT ROC and try again. Contact the DAQ expert if there are any questions.
  
== <font color=blue> References and Standards </font>==
+
== <font color=blue> References and Standards </font>==  
  
 
=== 5-pass (10.55 GeV) Running conditions ===
 
=== 5-pass (10.55 GeV) Running conditions ===
 
* Torus at 100% current, inbending electrons. Setpoint = +3770 A (Readback = +3766 A)
 
* Torus at 100% current, inbending electrons. Setpoint = +3770 A (Readback = +3766 A)
* Solenoid setpoint inverted (Oct 14 2022) -2417.5 A  
+
<!--
** -2418.50 A when shim coils of polarized target are on (Oct 26, 2022))
+
* Solenoid setpoint inverted (Oct 14 2022) -2417.5 A
 +
** with using shim coils of polarized target on (Oct 26, 2022) -2418.50 A
 
* Solenoid setpoint +2417.5 A (normal conditions RGA-M)
 
* Solenoid setpoint +2417.5 A (normal conditions RGA-M)
 +
i-->
 +
* Solenoid set-point of 2416.4 A results in the read back 2419.23 A and exactly 5.00 T field on center
  
'''Solenoid set-point of 2417.5 A results in read back 2419.57 A and exactly 5.00 T field on center'''
+
'''Raster settings (current as of February 9, 2023)'''
 
+
* x: Vpp = 2.7 V, offset = 0.0
'''Raster settings'''
+
* y: Vpp = 2.05 V, offset = 0.50 V
* x: Vpp = 3.6 V, offset = -0.65 V
 
* y: Vpp = 3.1 V, offset = 0 V
 
 
* Fundamental Period = 2 s
 
* Fundamental Period = 2 s
 
* The correct raster calibration constants should be automatically loaded by rastermon - if not, enter them through "Config" by hand:  
 
* The correct raster calibration constants should be automatically loaded by rastermon - if not, enter them through "Config" by hand:  
Line 195: Line 184:
 
* f(y) = -0.0115*y + 24.4
 
* f(y) = -0.0115*y + 24.4
  
'''Nominal Beam Positions'''
+
'''Nominal Beam Positions (current as of February 9, 2023) '''
  
 
*2C21A, X = -0.4 mm, Y = +0.6 mm  
 
*2C21A, X = -0.4 mm, Y = +0.6 mm  
 
*2C24A, X = -2.0 mm, Y = +0.6 mm  
 
*2C24A, X = -2.0 mm, Y = +0.6 mm  
*2H01, X = -1.9 mm, Y = +1.5 mm
+
<!-- *2H01, X = -1.8 mm, Y = +0.9 mm -->
 +
*2H01, X = -1.0 mm, Y = +0.9 mm
 
* Orbit lock on 2C24 and 2H01 ONLY if raster is OFF, otherwise orbit lock on 2C21 and 2C24 (note: this appears as "stopped" on the beam line GUI).
 
* Orbit lock on 2C24 and 2H01 ONLY if raster is OFF, otherwise orbit lock on 2C21 and 2C24 (note: this appears as "stopped" on the beam line GUI).
  
Line 212: Line 202:
  
 
* Harp Scans for Beam on Faraday Cup, 2H01  [https://logbooks.jlab.org/entry/3963256],      '' more recent scan (3 Sept 2022): ''  [https://logbooks.jlab.org/entry/4037457]
 
* Harp Scans for Beam on Faraday Cup, 2H01  [https://logbooks.jlab.org/entry/3963256],      '' more recent scan (3 Sept 2022): ''  [https://logbooks.jlab.org/entry/4037457]
* Harp Scans for Beam on 2C21 [https://logbooks.jlab.org/entry/4021281],    '' more recent scan (3 Sept 2022):'' [https://logbooks.jlab.org/entry/4037438]  
+
* Harp Scans for Beam on 2C21 [https://logbooks.jlab.org/entry/4021281],    '' more recent scan (3 Sept 2022):'' [https://logbooks.jlab.org/entry/4037438] , '' even more recent scan (1 Feb 2023):'' [https://logbooks.jlab.org/entry/4122116]
* Harp Scan on Tagger Dump (3 Sep 2022) [https://logbooks.jlab.org/entry/4037440]
+
* Harp Scan on Tagger Dump (3 Sep 2022) [https://logbooks.jlab.org/entry/4037440], ''more recent scan (1 Feb 2023):'' [https://logbooks.jlab.org/entry/4122122]
 +
* RasterMon (20 Oct 2022) [https://logbooks.jlab.org/entry/4064143], ''more recent raster (2 Feb 2023):'' [https://logbooks.jlab.org/entry/4122766]
 
* Monitoring Histograms  
 
* Monitoring Histograms  
** run 17240, DAY Friday (21-Oct-2022), ECAL good [https://logbooks.jlab.org/entry/4065165 https://logbooks.jlab.org/entry/4065165]
+
** run 17240, DAY Fr, 10/21/2022, ND3 (ECAL good) [https://logbooks.jlab.org/entry/4065165 https://logbooks.jlab.org/entry/4065165]
** run 17348 CH2 Wed, 11/02/2022 - 06:52 [https://logbooks.jlab.org/entry/4075177 https://logbooks.jlab.org/entry/4075177]
+
** run 17348, DAY We, 11/02/2022, CH2 [https://logbooks.jlab.org/entry/4075177 https://logbooks.jlab.org/entry/4075177]
* RasterMon (20 Oct 2022) [https://logbooks.jlab.org/entry/4064143]
+
** run 17363, OWL Sa, 11/05/2022, NH3 [https://logbooks.jlab.org/entry/4076956 https://logbooks.jlab.org/entry/4076956]
 +
** run 17492, DAY Th, 02/02/2023, ND3 (post-solenoid hiatus) [https://logbooks.jlab.org/entry/4122528 https://logbooks.jlab.org/entry/4122528]
 +
** run 17542, EVE Th, 02/09/2023, ND3 [https://logbooks.jlab.org/entry/4127691 https://logbooks.jlab.org/entry/4127691]
 +
** run 17547, DAY Sa, 02/11/2023, ND3 [https://logbooks.jlab.org/entry/4128938 https://logbooks.jlab.org/entry/4128938]
 +
** run 17562, DAY Mo, 02/13/2023, ND3 [https://logbooks.jlab.org/entry/4130446 https://logbooks.jlab.org/entry/4130446]
  
 
'''Counter rates'''
 
'''Counter rates'''
Line 223: Line 218:
 
* The Midstream ones should read 0-20 Hz or so.
 
* The Midstream ones should read 0-20 Hz or so.
 
* Greatly increased rates may indicate bad beam tune or bleed-through from other Halls.
 
* Greatly increased rates may indicate bad beam tune or bleed-through from other Halls.
 +
 +
= GENERAL INFORMATION =
 +
<!--####################################### GENERAL INFORMATION ########################################-->
 +
 +
'''see below for Known Detector Issues'''
 +
 +
== General Information ==
 +
 +
* To open CS Studio interface, type "clascss" in some terminal.
 +
 +
* '''Controlled access''': after you call MCC, they will drop the hall to controlled access once someone goes down and calls them for entry. Then call when they should go back to beam permit and call again to say you want the beam back and what beam current. Rapid access is controlled access without RadCon.
 +
 +
* If MCC needs to '''diagnose beam with a harp''', we can offer them tagger 2C24 and follow the procedures required for that. '''2H01 harp scan should not be done when we have beam raster on.'''
 +
 +
* '''BMT''':
 +
** '''After HV trip''': the channel HV should be turned back on as soon as you notice the trip, power cycle by turning HV OFF and ON '''without waiting for any amount of time'''.
 +
** '''HV frequently tripping''': Call expert. Do not change HVs without approval from the expert.
 +
 +
* '''mon12''': It can happen that histograms do not get cleared completely at run start. This is seen eg as an excess of small multiplicities. The remedy is to quit mon12 and open it again. Other than that, small multiplicities come from time intervals with beam down. You might want to look at the multiplicities before uploading the mon12 histograms in the logbook.
 +
 +
* '''DAQ''':
 +
** rastermon should be using ET on clondaq6
 +
*** this means startup of rastermon via command line: rastermon --et --host clondaq6
 +
** It should no longer be necessary to quit RasterMon at the end of each run and restart after a successful "Go" for the next run. However, if DAQ crashes, you SHOULD follow these steps, and the same for mon12.
 +
 +
* '''Magnet trip''': call "Engineering on call", if due to cryo, also inform the target expert about the cryogenic issues.
 +
 +
* '''Holes in CND occupancies: CAMAC CFD crate was turned off/on for some reason. You need to run the script to set the thresholds for CND CFDs. Go on a clondaq machine and type cnd-cfd-thresh -w 0. Or call the CND phone if this doesn't work.
 +
 +
* '''Hall lights''': Before leaving the hall''' and going to beam permit check that dome lights, forward carriage lights, and pie tower lights are OFF.
 +
 +
* '''Moller runs''': should be taken with 8-10 nA.
 +
 +
* '''Beam viewer''': Please REMOVE the beam viewer unless we are actively tuning the beam or calibrating beam position/raster, to avoid damage to electronics, cameras etc.
 +
 +
* '''Change of running conditions'''
 +
** Check that the trigger alarms (on rate/nA) are set appropriately and RC changes them as needed.
 +
** Whenever the target type or polarization direction changes, or the half-wave plate status changes, make sure to enter a comment in the BEGIN RUN / END RUN comment box.
 +
** Do not change running conditions while a run is ongoing. This includes changing target polarization or HWP, etc.
 +
 +
== Known Issues ==
 +
FTT alarms - can be ignored (we do not have the FTT installed)
 +
 +
Fr 11 Nov 2022
 +
ECAL PMT_SEC2_WO8 HV is disabled
 +
https://logbooks.jlab.org/entry/4080950
 +
 +
Follow-up Re: RICH tile 21 in sector 1 is dead. Working without one tile out of 276 for a moment
 +
https://logbooks.jlab.org/entry/4079453
 +
 +
Run #17396: RICH lost three scalars
 +
https://logbooks.jlab.org/entry/4079190
 +
 +
Tuesday, February 7, 2023:
 +
BMT Sector 2 Layer 5 is broken (HV set to 200 V)
  
 
= Shift Expert =
 
= Shift Expert =
 
<!--#######################################  Shift Expert  ################################################-->
 
<!--#######################################  Shift Expert  ################################################-->
{| {{TableStyle1}}
 
| valign=top |
 
  
 
== Shift expert tasks ==
 
== Shift expert tasks ==
 
* Come to your shift in time for the '''shift change''', 10-15 minutes before the start of your shift.  
 
* Come to your shift in time for the '''shift change''', 10-15 minutes before the start of your shift.  
 
* Follow the '''Short Term Schedule''' as outlined by RC  
 
* Follow the '''Short Term Schedule''' as outlined by RC  
** includes Run Plan, General Information, DAQ Configuration, and References and Standards
+
** Run Plan, DAQ Configuration, and References and Standards
 +
** also check tab '''GENERAL INFORMATION'''
 
* Keep '''shift summary''' up to date in HBLOG. Record all that happens.
 
* Keep '''shift summary''' up to date in HBLOG. Record all that happens.
  
 
* Ensure that all '''monitoring''' plots are logged correctly and checked against the reference plots for every single run, see link under https://wiki.jlab.org/clas12-run/index.php/Run_Group_C#Useful_Links
 
* Ensure that all '''monitoring''' plots are logged correctly and checked against the reference plots for every single run, see link under https://wiki.jlab.org/clas12-run/index.php/Run_Group_C#Useful_Links
 +
* Both, you and the shift worker should '''reset & check spectra frequently'''
  
 
* '''Polarized target''':
 
* '''Polarized target''':
Line 244: Line 294:
 
** '''NMR running'''  (''ONLY WHILE ACTUALLY RUNNING ON NH3 AND ND3 targets!'')
 
** '''NMR running'''  (''ONLY WHILE ACTUALLY RUNNING ON NH3 AND ND3 targets!'')
 
*** The JLab Polarization Display is seen via a VNC window in the counting room. Here, the NMR Controls' blue bar must be moving, indicating that the NMR is running and the polarization is measured.  
 
*** The JLab Polarization Display is seen via a VNC window in the counting room. Here, the NMR Controls' blue bar must be moving, indicating that the NMR is running and the polarization is measured.  
 +
*** If the NMR display is frozen or disappears, here are the steps to follow:
 +
**** Open a new terminal window on the bottom right-most screen.
 +
**** Type "ssh clasrun@clonsl1"
 +
**** Type "nmr-vnc”
 +
**** Click "Run" under "NMR Controls" - the window should now be updating (blue bar moving)
 
*** The NMR frequency needs to be controlled by hand. If you see target polarization (on the red graph) starting to drop, call the expert. They will guide you through the adjustment procedure.  This will be in the electronics room by the door to the counting room, in the third crate from the right ("CR-6"). White box which says "EIO Tube" and has a red button at the top right, which says "Move", next to a display for "Position". This will be the one to press, under guidance of the target expert.  
 
*** The NMR frequency needs to be controlled by hand. If you see target polarization (on the red graph) starting to drop, call the expert. They will guide you through the adjustment procedure.  This will be in the electronics room by the door to the counting room, in the third crate from the right ("CR-6"). White box which says "EIO Tube" and has a red button at the top right, which says "Move", next to a display for "Position". This will be the one to press, under guidance of the target expert.  
 
** '''Alarms''' from System RG-C Polarized Target (alarm handler).  
 
** '''Alarms''' from System RG-C Polarized Target (alarm handler).  
Line 270: Line 325:
 
(remote) shift worker: see dedicated [https://wiki.jlab.org/clas12-run/index.php/Run_Group_M#tab=Remote_Shifts Worker Shift] tab above.
 
(remote) shift worker: see dedicated [https://wiki.jlab.org/clas12-run/index.php/Run_Group_M#tab=Remote_Shifts Worker Shift] tab above.
  
|}
+
= Worker Shift =
 +
<!--#######################################  Worker Shift  ################################################-->
 +
== Shift Worker Tasks ==
  
= Worker Shift =
+
* Check the information in the '''Short Term Schedule''' and '''GENERAL INFORMATION''', for every shift
== Notes ==
 
* Check the information in the '''Short Term Schedule''', for every shift
 
 
* Come to your shift in time for the '''shift change''', 10-15 minutes before the start of your shift.  
 
* Come to your shift in time for the '''shift change''', 10-15 minutes before the start of your shift.  
 
* Use the new '''HBRUN logbook''' for automated and run-specific entries and screenshots, see https://logbooks.jlab.org/entry/4048698
 
* Use the new '''HBRUN logbook''' for automated and run-specific entries and screenshots, see https://logbooks.jlab.org/entry/4048698
  
== Shift Worker Tasks ==
 
  
 
'''Make the following log entries ONCE per run'''
 
'''Make the following log entries ONCE per run'''
Line 285: Line 339:
 
** CLAS12 Trigger rates and DAQ status
 
** CLAS12 Trigger rates and DAQ status
 
** RGC Polarized Target GUI - under Beamline on CS-Studio
 
** RGC Polarized Target GUI - under Beamline on CS-Studio
 +
** Helicity Asymmetry Strip Charts - see [https://logbooks.jlab.org/entry/4123228] for an example. Also read and follow the instructions below under "Log the Strip Charts".
  
 
* '''Upload monitoring plots to logbook'''  
 
* '''Upload monitoring plots to logbook'''  
** Standard spectra (mon12): inspect '' all monitoring histograms ''' and carefully compare them to the corresponding reference histograms: reference, current, and 5 most recent runs, see link under https://wiki.jlab.org/clas12-run/index.php/Run_Group_C#Useful_Links.
+
** Standard spectra (mon12): inspect '' all monitoring histograms ''' and carefully compare them to the corresponding reference histograms: reference, current, and 5 most recent runs, see link under tab Useful Links
 
*** You can choose a different reference run if you are confident what you are doing, the reference numbers refer to logbook entries.
 
*** You can choose a different reference run if you are confident what you are doing, the reference numbers refer to logbook entries.
 
** Raster Monitoring  (use "Log Entry" button on RasterMon screen at bottom-right corner).  
 
** Raster Monitoring  (use "Log Entry" button on RasterMon screen at bottom-right corner).  
Line 306: Line 361:
 
** Make sure you refresh the web page! Its no longer necessary to put a snapshot into the logbook UNLESS something looks suspicious. In THAT case, immediately inform the target expert(s).
 
** Make sure you refresh the web page! Its no longer necessary to put a snapshot into the logbook UNLESS something looks suspicious. In THAT case, immediately inform the target expert(s).
  
* Log the '''strip charts''' in time intervals '''according to the x-axis time span''', via right-click on the screen and selecting "Make Elog Entry". Make sure NOT to submit to ELOG.
+
* '''Log the ''strip charts'' in time intervals ''according to the x-axis time span'', via right-click on the screen and selecting "Make Elog Entry". Make sure NOT to submit to ELOG.'''
 
** Beam current and position strip-charts (CS-Studio -> Beamline -> Strip Charts)
 
** Beam current and position strip-charts (CS-Studio -> Beamline -> Strip Charts)
 
+
** Helicity Trigger Asymmetry strip-chart (CS-Studio -> DAQ -> Helicity-Latched Trigger GUI Screen -> click on "Menu" -> myaPlot (not accessible remotely) -> Choose "load config time axis: start: -12 hours end: NOW" and click "accept"
** Helicity Trigger Asymmetry strip-chart (CS-Studio -> Helicity-Latched Trigger GUI Screen -> Menu -> myaPlot) (not accessible remotely) (ONLY WHILE ACTUALLY RUNNING ON NH3 AND ND3 targets!
+
*** [https://logbooks.jlab.org/entry/4123228 Example]  
*** Example https://logbooks.jlab.org/entry/4041939)  
 
 
*** '''Choose reasonable y / x axis ranges:''' R-click on the axis -> Modify (axis-name) Axis  
 
*** '''Choose reasonable y / x axis ranges:''' R-click on the axis -> Modify (axis-name) Axis  
** For the y axis in the bottom panel, choose the target polarization and 0...0.4 as the y axis range
+
*** For the y axis in the bottom panel, choose the NMR polarization and a reasonable range for the y axis (always from 0 to some maximum value), same for the 60-min trigger bit polarization. Those two do NOT have to have the same scale - it is better to try to get the dark blue and red curves to lie on top of each other (more or less).
*** Set the time axis auto-update. A ">>" symbol will appear below the time axis when this is activated.  
+
*** Set the time axis auto-update. ">>" symbol will appear below the time axis when this is activated. (Right-click on X axis ->" [A] Set Auto Time Stepping")
**** Right-click on X axis -> Set Auto Time Stepping
 
  
 
* You can also see beam charts in the Web Browser: [https://epicsweb.jlab.org/wave/?myaDeployment=ops&myaLimit=100000&windowMinutes=30&title=Upstream+and+Midstream+Halo+Counters&fullscreen=false&layoutMode=2&viewerMode=2&pv=scaler_cS3b&pv=scaler_cS4b&pv=scaler_cS6b&pv=scaler_cS12b&pv=scaler_cS13b&pv=scaler_cS14b&pv=scaler_cS15b&scaler_cS3blabel=scaler_cS3b&scaler_cS3bcolor=%23a6cee3&scaler_cS3byAxisLabel=Rate++%28Hz%29&scaler_cS3byAxisMin=&scaler_cS3byAxisMax=&scaler_cS3byAxisLog&scaler_cS3bscaler=&start=2020-08-08+09%3A02%3A36&end=2020-08-08+09%3A07%3A36&scaler_cS4blabel=scaler_cS4b&scaler_cS4bcolor=%231f78b4&scaler_cS4byAxisLabel=&scaler_cS4byAxisMin=&scaler_cS4byAxisMax=&scaler_cS4byAxisLog=&scaler_cS4bscaler=&scaler_cS5byAxisLabel=&scaler_cS5byAxisMin=&scaler_cS5byAxisMax=&scaler_cS5byAxisLog=&scaler_cS5bscaler=&scaler_cS6blabel=scaler_cS6b&scaler_cS6bcolor=%2333a02c&scaler_cS6byAxisLabel=&scaler_cS6byAxisMin=&scaler_cS6byAxisMax=&scaler_cS6byAxisLog=&scaler_cS6bscaler=&scaler_cS7byAxisLabel=&scaler_cS7byAxisMin=&scaler_cS7byAxisMax=&scaler_cS7byAxisLog=&scaler_cS7bscaler=&scaler_cS12blabel=scaler_cS12b&scaler_cS12bcolor=%23e31a1c&scaler_cS12byAxisLabel=&scaler_cS12byAxisMin=&scaler_cS12byAxisMax=&scaler_cS12byAxisLog=&scaler_cS12bscaler=&scaler_cS13blabel=scaler_cS13b&scaler_cS13bcolor=%23fdbf6f&scaler_cS13byAxisLabel=&scaler_cS13byAxisMin=&scaler_cS13byAxisMax=&scaler_cS13byAxisLog=&scaler_cS13bscaler=&scaler_cS14blabel=scaler_cS14b&scaler_cS14bcolor=%23ff7f00&scaler_cS14byAxisLabel=&scaler_cS14byAxisMin=&scaler_cS14byAxisMax=&scaler_cS14byAxisLog=&scaler_cS14bscaler=&scaler_cS15blabel=scaler_cS15b&scaler_cS15bcolor=%23cab2d6&scaler_cS15byAxisLabel=&scaler_cS15byAxisMin=&scaler_cS15byAxisMax=&scaler_cS15byAxisLog=&scaler_cS15bscaler= Upstream/Midstream Halo Counters], [https://epicsweb.jlab.org/wave/?myaDeployment=ops&myaLimit=100000&windowMinutes=30&title=Downstream+Halo+Counters&fullscreen=false&layoutMode=2&viewerMode=2&pv=scalerS8b&pv=scalerS9b&scalerS8blabel=scalerS8b&scalerS8bcolor=%23a6cee3&scalerS8byAxisLabel=Rate++%28Hz%29&scalerS8byAxisMin=&scalerS8byAxisMax=&scalerS8byAxisLog&scalerS8bscaler=&pv=scalerS10b&pv=scalerS11b&scalerS9blabel=scalerS9b&scalerS9bcolor=%231f78b4&scalerS9byAxisLabel=&scalerS9byAxisMin=&scalerS9byAxisMax=&scalerS9byAxisLog=&scalerS9bscaler=&scalerS10blabel=scalerS10b&scalerS10bcolor=%23b2df8a&scalerS10byAxisLabel=&scalerS10byAxisMin=&scalerS10byAxisMax=&scalerS10byAxisLog=&scalerS10bscaler=&scalerS11blabel=scalerS11b&scalerS11bcolor=%2333a02c&scalerS11byAxisLabel=&scalerS11byAxisMin=&scalerS11byAxisMax=&scalerS11byAxisLog=&scalerS11bscaler= Downstream Halo Counters], [https://epicsweb.jlab.org/wave/?start=2020-07-08+16%3A50%3A02&end=2020-07-08+16%3A55%3A02&myaDeployment=ops&myaLimit=100000&windowMinutes=30&title=Beam+Currents&fullscreen=false&layoutMode=2&viewerMode=2&pv=IPM2C21A&pv=IPM2C24A&pv=scaler_calc1b&IPM2C21Alabel=IPM2C21A&IPM2C21Acolor=%23a6cee3&IPM2C21AyAxisLabel=Beam+Current+%28nA%29&IPM2C21AyAxisMin=0&IPM2C21AyAxisMax=300&IPM2C21AyAxisLog&IPM2C21Ascaler=&scaler_calc1blabel=Faraday+Cup&scaler_calc1bcolor=%23b2df8a&scaler_calc1byAxisLabel=&scaler_calc1byAxisMin=&scaler_calc1byAxisMax=&scaler_calc1byAxisLog&scaler_calc1bscaler= Beam Currents], [https://epicsweb.jlab.org/wave/?start=2020-08-03+12%3A30%3A57&end=2020-08-03+12%3A35%3A57&myaDeployment=ops&myaLimit=100000&windowMinutes=30&title=BPM+Positions+%28Y-Axis+is+mean+%2B%2F-+0.5+mm%29&fullscreen=false&layoutMode=3&viewerMode=2&pv=IPM2C24A.XPOS&pv=IPM2C24A.YPOS&pv=IPM2H01.XPOS&pv=IPM2H01.YPOS&IPM2C24A.XPOSlabel=IPM2C24A.XPOS&IPM2C24A.XPOScolor=%23e31a1c&IPM2C24A.XPOSyAxisLabel=&IPM2C24A.XPOSyAxisMin=-2.0&IPM2C24A.XPOSyAxisMax=+1.0&IPM2C24A.XPOSyAxisLog&IPM2C24A.XPOSscaler=&IPM2C24A.YPOSlabel=IPM2C24A.YPOS&IPM2C24A.YPOScolor=pink&IPM2C24A.YPOSyAxisLabel=&IPM2C24A.YPOSyAxisMin=-2.0&IPM2C24A.YPOSyAxisMax=1.0&IPM2C24A.YPOSyAxisLog&IPM2C24A.YPOSscaler=&IPM2H01.XPOSlabel=IPM2H01.XPOS&IPM2H01.XPOScolor=darkgreen&IPM2H01.XPOSyAxisLabel=&IPM2H01.XPOSyAxisMin=-2.0&IPM2H01.XPOSyAxisMax=1.0&IPM2H01.XPOSyAxisLog&IPM2H01.XPOSscaler=&IPM2H01.YPOSlabel=IPM2H01.YPOS&IPM2H01.YPOScolor=lightgreen&IPM2H01.YPOSyAxisLabel=&IPM2H01.YPOSyAxisMin=-2.0&IPM2H01.YPOSyAxisMax=1.0&IPM2H01.YPOSyAxisLog&IPM2H01.YPOSscaler=#a6cee3&IPM2C24A.XPOSyAxisLabel=2C24+X+(mm)&IPM2C24A.XPOSyAxisMin=-1.5&IPM2C24A.XPOSyAxisMax=-0.5&IPM2C24A.XPOSyAxisLog&IPM2C24A.XPOSscaler=&IPM2C24A.YPOSlabel=IPM2C24A.YPOS&IPM2C24A.YPOScolor=%231f78b4&IPM2C24A.YPOSyAxisLabel=2C24+Y+(mm)&IPM2C24A.YPOSyAxisMin=0.3&IPM2C24A.YPOSyAxisMax=1.3&IPM2C24A.YPOSyAxisLog&IPM2C24A.YPOSscaler=&IPM2H01.XPOSlabel=IPM2H01.XPOS&IPM2H01.XPOScolor=pink&IPM2H01.XPOSyAxisLabel=2H01+X+(mm)&IPM2H01.XPOSyAxisMin=-0.6&IPM2H01.XPOSyAxisMax=0.4&IPM2H01.XPOSyAxisLog&IPM2H01.XPOSscaler=&IPM2H01.YPOSlabel=IPM2H01.YPOS&IPM2H01.YPOScolor=darkred&IPM2H01.YPOSyAxisLabel=2H01+Y+(mm)&IPM2H01.YPOSyAxisMin=0.4&IPM2H01.YPOSyAxisMax=1.4&IPM2H01.YPOSyAxisLog&IPM2H01.YPOSscaler= BPM Positions]
 
* You can also see beam charts in the Web Browser: [https://epicsweb.jlab.org/wave/?myaDeployment=ops&myaLimit=100000&windowMinutes=30&title=Upstream+and+Midstream+Halo+Counters&fullscreen=false&layoutMode=2&viewerMode=2&pv=scaler_cS3b&pv=scaler_cS4b&pv=scaler_cS6b&pv=scaler_cS12b&pv=scaler_cS13b&pv=scaler_cS14b&pv=scaler_cS15b&scaler_cS3blabel=scaler_cS3b&scaler_cS3bcolor=%23a6cee3&scaler_cS3byAxisLabel=Rate++%28Hz%29&scaler_cS3byAxisMin=&scaler_cS3byAxisMax=&scaler_cS3byAxisLog&scaler_cS3bscaler=&start=2020-08-08+09%3A02%3A36&end=2020-08-08+09%3A07%3A36&scaler_cS4blabel=scaler_cS4b&scaler_cS4bcolor=%231f78b4&scaler_cS4byAxisLabel=&scaler_cS4byAxisMin=&scaler_cS4byAxisMax=&scaler_cS4byAxisLog=&scaler_cS4bscaler=&scaler_cS5byAxisLabel=&scaler_cS5byAxisMin=&scaler_cS5byAxisMax=&scaler_cS5byAxisLog=&scaler_cS5bscaler=&scaler_cS6blabel=scaler_cS6b&scaler_cS6bcolor=%2333a02c&scaler_cS6byAxisLabel=&scaler_cS6byAxisMin=&scaler_cS6byAxisMax=&scaler_cS6byAxisLog=&scaler_cS6bscaler=&scaler_cS7byAxisLabel=&scaler_cS7byAxisMin=&scaler_cS7byAxisMax=&scaler_cS7byAxisLog=&scaler_cS7bscaler=&scaler_cS12blabel=scaler_cS12b&scaler_cS12bcolor=%23e31a1c&scaler_cS12byAxisLabel=&scaler_cS12byAxisMin=&scaler_cS12byAxisMax=&scaler_cS12byAxisLog=&scaler_cS12bscaler=&scaler_cS13blabel=scaler_cS13b&scaler_cS13bcolor=%23fdbf6f&scaler_cS13byAxisLabel=&scaler_cS13byAxisMin=&scaler_cS13byAxisMax=&scaler_cS13byAxisLog=&scaler_cS13bscaler=&scaler_cS14blabel=scaler_cS14b&scaler_cS14bcolor=%23ff7f00&scaler_cS14byAxisLabel=&scaler_cS14byAxisMin=&scaler_cS14byAxisMax=&scaler_cS14byAxisLog=&scaler_cS14bscaler=&scaler_cS15blabel=scaler_cS15b&scaler_cS15bcolor=%23cab2d6&scaler_cS15byAxisLabel=&scaler_cS15byAxisMin=&scaler_cS15byAxisMax=&scaler_cS15byAxisLog=&scaler_cS15bscaler= Upstream/Midstream Halo Counters], [https://epicsweb.jlab.org/wave/?myaDeployment=ops&myaLimit=100000&windowMinutes=30&title=Downstream+Halo+Counters&fullscreen=false&layoutMode=2&viewerMode=2&pv=scalerS8b&pv=scalerS9b&scalerS8blabel=scalerS8b&scalerS8bcolor=%23a6cee3&scalerS8byAxisLabel=Rate++%28Hz%29&scalerS8byAxisMin=&scalerS8byAxisMax=&scalerS8byAxisLog&scalerS8bscaler=&pv=scalerS10b&pv=scalerS11b&scalerS9blabel=scalerS9b&scalerS9bcolor=%231f78b4&scalerS9byAxisLabel=&scalerS9byAxisMin=&scalerS9byAxisMax=&scalerS9byAxisLog=&scalerS9bscaler=&scalerS10blabel=scalerS10b&scalerS10bcolor=%23b2df8a&scalerS10byAxisLabel=&scalerS10byAxisMin=&scalerS10byAxisMax=&scalerS10byAxisLog=&scalerS10bscaler=&scalerS11blabel=scalerS11b&scalerS11bcolor=%2333a02c&scalerS11byAxisLabel=&scalerS11byAxisMin=&scalerS11byAxisMax=&scalerS11byAxisLog=&scalerS11bscaler= Downstream Halo Counters], [https://epicsweb.jlab.org/wave/?start=2020-07-08+16%3A50%3A02&end=2020-07-08+16%3A55%3A02&myaDeployment=ops&myaLimit=100000&windowMinutes=30&title=Beam+Currents&fullscreen=false&layoutMode=2&viewerMode=2&pv=IPM2C21A&pv=IPM2C24A&pv=scaler_calc1b&IPM2C21Alabel=IPM2C21A&IPM2C21Acolor=%23a6cee3&IPM2C21AyAxisLabel=Beam+Current+%28nA%29&IPM2C21AyAxisMin=0&IPM2C21AyAxisMax=300&IPM2C21AyAxisLog&IPM2C21Ascaler=&scaler_calc1blabel=Faraday+Cup&scaler_calc1bcolor=%23b2df8a&scaler_calc1byAxisLabel=&scaler_calc1byAxisMin=&scaler_calc1byAxisMax=&scaler_calc1byAxisLog&scaler_calc1bscaler= Beam Currents], [https://epicsweb.jlab.org/wave/?start=2020-08-03+12%3A30%3A57&end=2020-08-03+12%3A35%3A57&myaDeployment=ops&myaLimit=100000&windowMinutes=30&title=BPM+Positions+%28Y-Axis+is+mean+%2B%2F-+0.5+mm%29&fullscreen=false&layoutMode=3&viewerMode=2&pv=IPM2C24A.XPOS&pv=IPM2C24A.YPOS&pv=IPM2H01.XPOS&pv=IPM2H01.YPOS&IPM2C24A.XPOSlabel=IPM2C24A.XPOS&IPM2C24A.XPOScolor=%23e31a1c&IPM2C24A.XPOSyAxisLabel=&IPM2C24A.XPOSyAxisMin=-2.0&IPM2C24A.XPOSyAxisMax=+1.0&IPM2C24A.XPOSyAxisLog&IPM2C24A.XPOSscaler=&IPM2C24A.YPOSlabel=IPM2C24A.YPOS&IPM2C24A.YPOScolor=pink&IPM2C24A.YPOSyAxisLabel=&IPM2C24A.YPOSyAxisMin=-2.0&IPM2C24A.YPOSyAxisMax=1.0&IPM2C24A.YPOSyAxisLog&IPM2C24A.YPOSscaler=&IPM2H01.XPOSlabel=IPM2H01.XPOS&IPM2H01.XPOScolor=darkgreen&IPM2H01.XPOSyAxisLabel=&IPM2H01.XPOSyAxisMin=-2.0&IPM2H01.XPOSyAxisMax=1.0&IPM2H01.XPOSyAxisLog&IPM2H01.XPOSscaler=&IPM2H01.YPOSlabel=IPM2H01.YPOS&IPM2H01.YPOScolor=lightgreen&IPM2H01.YPOSyAxisLabel=&IPM2H01.YPOSyAxisMin=-2.0&IPM2H01.YPOSyAxisMax=1.0&IPM2H01.YPOSyAxisLog&IPM2H01.YPOSscaler=#a6cee3&IPM2C24A.XPOSyAxisLabel=2C24+X+(mm)&IPM2C24A.XPOSyAxisMin=-1.5&IPM2C24A.XPOSyAxisMax=-0.5&IPM2C24A.XPOSyAxisLog&IPM2C24A.XPOSscaler=&IPM2C24A.YPOSlabel=IPM2C24A.YPOS&IPM2C24A.YPOScolor=%231f78b4&IPM2C24A.YPOSyAxisLabel=2C24+Y+(mm)&IPM2C24A.YPOSyAxisMin=0.3&IPM2C24A.YPOSyAxisMax=1.3&IPM2C24A.YPOSyAxisLog&IPM2C24A.YPOSscaler=&IPM2H01.XPOSlabel=IPM2H01.XPOS&IPM2H01.XPOScolor=pink&IPM2H01.XPOSyAxisLabel=2H01+X+(mm)&IPM2H01.XPOSyAxisMin=-0.6&IPM2H01.XPOSyAxisMax=0.4&IPM2H01.XPOSyAxisLog&IPM2H01.XPOSscaler=&IPM2H01.YPOSlabel=IPM2H01.YPOS&IPM2H01.YPOScolor=darkred&IPM2H01.YPOSyAxisLabel=2H01+Y+(mm)&IPM2H01.YPOSyAxisMin=0.4&IPM2H01.YPOSyAxisMax=1.4&IPM2H01.YPOSyAxisLog&IPM2H01.YPOSscaler= BPM Positions]
Line 359: Line 412:
 
===Live Monitoring Links===
 
===Live Monitoring Links===
 
*[https://clas12mon.jlab.org/rgc CLAS12 Monitoring Timelines]
 
*[https://clas12mon.jlab.org/rgc CLAS12 Monitoring Timelines]
*[https://clasweb.jlab.org/clas12online/timelines/rg-c/RGC2022_progress_charge.html Live Charge Collected Plots for FToff]
+
*[https://clasweb.jlab.org/clas12online/timelines/rg-c/RGC2022_progress_charge.html Live Charge Collected Plots for FTon '23]
*[https://clasweb.jlab.org/clas12online/timelines/rg-c/RGC2022_progress_charge_r12.html Live Charge Collected Plots for FTon]
+
*[https://clasweb.jlab.org/clas12online/timelines/rg-c/RGC2022_progress_charge_r12.html Charge Collected Plots for FTon '22]
 +
*[https://clasweb.jlab.org/clas12online/timelines/rg-c/RGC2022_progress_charge_r3.html Charge Collected Plots for FToff '22]
 
*[https://clasweb.jlab.org/clas12online/timelines/rg-c/RGC2022_target_illum.html Total Charge on Target Plot]
 
*[https://clasweb.jlab.org/clas12online/timelines/rg-c/RGC2022_target_illum.html Total Charge on Target Plot]
 +
*[https://clasweb.jlab.org/hydra/HydraRun.html Hydra] (CUE Login) Google-Chrome ONLY, Not Firefox!
  
 
<!--
 
<!--
Line 383: Line 438:
 
* [https://clasweb.jlab.org/wiki/index.php/Run_Group_C Run Group C Analysis Wiki]
 
* [https://clasweb.jlab.org/wiki/index.php/Run_Group_C Run Group C Analysis Wiki]
 
* [http://clasweb.jlab.org/rcdb RCDB]
 
* [http://clasweb.jlab.org/rcdb RCDB]
* [https://clas12mon.jlab.org/mon12/histograms/?reference=4075177 All monitoring histograms: reference, current, and 5 most recent runs]
+
* [https://clas12mon.jlab.org/mon12/histograms/?reference=4130409 All monitoring histograms: reference, current, and 5 most recent runs]
 
* [https://clas12mon.jlab.org/ CLAS12 mon page]
 
* [https://clas12mon.jlab.org/ CLAS12 mon page]
 
* '''[https://clasweb.jlab.org/wiki/index.php/RG-C_RC_and_Target_Expert_Volunteers Run Coordinators and Target Experts Instructions and List]'''
 
* '''[https://clasweb.jlab.org/wiki/index.php/RG-C_RC_and_Target_Expert_Volunteers Run Coordinators and Target Experts Instructions and List]'''
Line 408: Line 463:
 
* 08:00 [https://jlab-org.zoomgov.com/j/1601304841?pwd=Z1RIOVVUdkdXL2R2LzREZUNOUlh1dz09 MCC/OPS Morning and Wednesday 1:30 Meeting]
 
* 08:00 [https://jlab-org.zoomgov.com/j/1601304841?pwd=Z1RIOVVUdkdXL2R2LzREZUNOUlh1dz09 MCC/OPS Morning and Wednesday 1:30 Meeting]
 
* [https://logbooks.jlab.org/entry/4000274 See also this log entry]
 
* [https://logbooks.jlab.org/entry/4000274 See also this log entry]
* 14:00 Daily RC Meeting  
+
* (Week-)Daily RC Meeting  
 
** [https://jlab-org.zoomgov.com/j/1608674253?pwd=SFZyYmZLWXJieGtpV2dEdVRiUEJnUT09&from=addon Zoom Link]
 
** [https://jlab-org.zoomgov.com/j/1608674253?pwd=SFZyYmZLWXJieGtpV2dEdVRiUEJnUT09&from=addon Zoom Link]
 
** Meeting ID: 160 867 4253
 
** Meeting ID: 160 867 4253
 
** Passcode: 786506
 
** Passcode: 786506
** [https://clasweb.jlab.org/wiki/index.php/RGC_RC Meeting Agendae]
+
** [https://clasweb.jlab.org/wiki/index.php/RGC_RC Meeting Schedule and Agendae]
  
 
|}
 
|}

Latest revision as of 14:41, 25 July 2024

[edit]

NOTE: All NON-JLab numbers MUST be dialed with (757) area code. When calling from a CH landline, dial "9" first. To call from outside, all 4-digit numbers must be preceded by 757-269

Role Phone Number
Hall B Run Coordinator (757) 575-7540 (cell)
Hall B Physics Division Liaison (757) 876-1789 (cell)
MCC 7048
Crew Chief 7045
Crew Chief (757) 876-3367 (cell)
Program Deputy (757) 876-7997 (cell)
RadCon (757) 876-1743 (cell)
Gate House Guard 5822
Location Phone Number
Hall B Floor 5165
Hall B Space Frame 5170 and 5171
Hall B Forward Carriage 5371
Hall B Gas Shed 7115
Hall B Counting House 5244 (Shift Expert)
Hall B Counting House (757) 329-4846 (Shift Expert cell)
Hall B Counting House 5245 or 5126 (Shift Worker)
Hall A Counting House 5501
Hall C Counting House 6000
Hall D Counting House 5504
Hall B System Phone Number On-Call Person
Engineering (757) 748-5048 (cell)
(757) 897-9060 (cell)
Engineering On-Call (primary)
Denny Insley (secondary)
Slow Controls (757) 748-6922 (cell) Nathan Baltzell
Beamline (757) 303-3996 (cell) Eugene Pasyuk
DC (757) 218-4372 (cell)
(757) 748-5048 (cell)
Florian Hauenstein (primary)
Engineering On-Call (secondary)
SVT/MVT/MM (757) 541-7539 (cell)
(757) 753-7769 (cell)
Yuri Gotra (primary)
Rafo Paremuzyan (secondary)
ECAL (757) 810-1489 (cell) Cole Smith
FTOF/CTOF/CND (757) 344-7204 (cell) Daniel Carman
ALERT (757) 329-4844 (cell) Raphael Dupré
HTCC/LTCC (757) 344-7174 (cell) Youri Sharabian
FT (757) 344-1848 (cell) Raffaella De Vita
BAND (757) 310-7198 (cell) Florian Hauenstein
RICH (757) 344-3235 (cell)
(757) 748-6922 (cell)
Christopher Dilks (primary)
Nathan Baltzell (secondary)
DAQ (757) 232-6221 (cell) Sergey Boiarinov
HYDRA (317) 550-9226 (cell) Torri Jeske
Authorized Hall B Solenoid/Torus Operators
Hall B Denny Insley, Morgan Cook, Eugene Pasyuk
Magnet Group Probir Ghosha, Renuka Rajput-Ghoshal
Detector Support Group Brian Eng, Pablo Campero, Tyler Lemon
DC Power Onish Kumar, Sarin Philip
  • Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
  • To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
  • Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.

Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.


CLAS12 Run Group C

Run Coordinator: Mohammad Hattawy (9-)757 575-7540

PDL: Eugene Pasyuk (9-)757 876-1789 , x6020 office

Run Group Coordinator: Sebastian Kuhn (9-)757 639-6640

Daily RC Meetings at 14:00: CH Room 200C, and on Zoom Zoom information: Link, Meeting ID: 160 867 4253, Passcode: 786506

Run Coordinator and Target Expert Schedule

Longterm Run Plan

Medium-Term Run Plan (FTon Portion Part 2)

IMPORTANT SHIFT NOTES

* In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House
* If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately so that replacements can be arranged.
* Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Worker Shift" Tab - you need some lead time to set up!
Note to shifts, please:
* read the logbook, be aware of previous 24 hours
* arrive at least 10 minutes early for shift change
* refresh the run wiki pages, look over them every shift:
** follow the expert/worker shift instructions 
** find latest pitfalls and known issues under GENERAL INFORMATION
* communicate with your co-shift person
** the shift expert should know about and refer to logbook entries in their shift summary
** the shift worker should discuss an issue with the shift expert before making extra logbook entries

Short Term Schedule for the Week from Wednesday, March 15th, to Monday March 20th, 2023

  • Current: 4 nA
  • Run duration: 100M events or 4 hours, whichever comes first.
  • Note, BOM is not installed for this experiment, so it does not matter whether it appears masked in FSD or not.
  • Conditions for raster operation:
    • IF there is any ammonia sample (NH3 and ND3) in the target, the raster MUST be operating at all times. The Raster FSD must be UNMASKED. Orbit locks MUST be OFF (except for brief moments to restore beam position).
    • For beam tuning or other non-rastered beam, the Raster FSD must be MASKED.
    • If MCC needs to diagnose beam with a harp, we can offer them tagger 2C24 and follow the procedures required for that. 2H01 harp scan should not be done when we have beam raster on.
    • Changing raster offset: ask MCC to NOT correct whatever happens on 2H01. Note new 2H01 values and inform MCC of the new 2H01 x and y values - then they can keep the beam at those positions.
  • Experiment setup is "FTon"
  • If HWP is changed, start a new run

PLAN for March 15-20, 2023

Note: an hour before changing the HWP, call Bill Henry (from Hall A) at 215-908-2245. He offered his help in optimizing the beam charge asymmetries when changing the HWP. He will stop by the counting house and run his code, which will take a minute. We will do the HWP changes during the day shifts.

  • Wednesday, March 15th: Beam study downtime starts at 8:00 AM. Beam is expected to be back by 15:00 PM. If they beam shows up before 22:00 PM, we will need to take a Moller run. Then, start taking data on ND3(+) (torus outbending, 4nA beam current, HWP IN).
  • Thursday, March 16th: Data taking on ND3 (+) (torus outbending, 4nA, HWP out)
  • Friday, March 17th: anneal the target and flip the polarization to negative. Will take about 3 hours starting around 9AM. Then, take data on ND3 (torus outbending, 4nA, HWP out)
  • Saturday, March 18th: Continue taking data on ND3(-) (torus outbending, 4nA, HWP IN)
  • Sunday, March 19th: Will change the target to C sometime in the day shift and start taking data. Will go to restricted access and will organize this between RadCon and Target Experts.
  • Till Monday, March 20th, 07:00 AM: Continue taking data till the beam goes away.
  • When the beam goes away:
  1. Turn all HV OFF except SVT and BMT. For FT we turn HV OFF, but keep the chiller and LV ON, Raffaella will do some LED calibrations.
  2. Solenoid will remain ON for the target group to do NMR studies.
  3. The torus should be ramped down. Morgan or Denny can do it if they are around at that time, or call Eugene and he do it.
  4. The hall should go to controlled access awaiting for radcon to come and do a full survey for restricted access.
NOTES: 
* Watch the beam positions (and thus the midstream halo counters) closely and ask MCC to adjust the positions if they are (on average) >=0.1mm off.
* Remember, the hall will only be dropped in controlled mode once someone goes downstairs and enters the hall. You/RadCon should do that right away after calling MCC. 

DAQ configuration

  • Configuration is currently PROD66/PROD66_PIN, trigger file rgc_300MeV_v1.4_no_DC.trg
  • NOTE: UNLESS a RICH problem crashes the DAQ, do NOT interrupt an otherwise smooth run to do a RICH recovery - instead do this in between runs.
  • NOTE: BOTH the shift expert AND the shift worker MUST check and reset monitoring histograms at least once every 30-60 minutes to make sure there are no major detector problems. Sometimes it is the only way to know that a roc needs to be rebooted. Watch the raster pattern!
  • At the end of each run, follow the STANDARD DAQ RESTART SEQUENCE:
    • "end run".
    • If the run ended correctly and you will run with the same configuration and trigger file, then: "prestart", "go"
    • If you are changing configuration (between PROD6X and PROD6X_PIN) or trigger file: "cancel", "reset", "configure", "download", "prestart", "go".
    • if the run did not end correctly or if any ROCs had to be rebooted:
      • Quit ALL running instances of mon12 and rastermon
      • "cancel", "reset"
      • "configure", "download", "prestart", "go"
      • restart mon12 and rastermon
  • After each step, make sure it is completed in the Run Control message window. If a ROC has crashed, find which one it is, issue a roc_reboot command ON JUST THAT ROC and try again. Contact the DAQ expert if there are any questions.

References and Standards

5-pass (10.55 GeV) Running conditions

  • Torus at 100% current, inbending electrons. Setpoint = +3770 A (Readback = +3766 A)
  • Solenoid set-point of 2416.4 A results in the read back 2419.23 A and exactly 5.00 T field on center

Raster settings (current as of February 9, 2023)

  • x: Vpp = 2.7 V, offset = 0.0
  • y: Vpp = 2.05 V, offset = 0.50 V
  • Fundamental Period = 2 s
  • The correct raster calibration constants should be automatically loaded by rastermon - if not, enter them through "Config" by hand:
  • f(x) = 0.0104*x + -25.5
  • f(y) = -0.0115*y + 24.4

Nominal Beam Positions (current as of February 9, 2023)

  • 2C21A, X = -0.4 mm, Y = +0.6 mm
  • 2C24A, X = -2.0 mm, Y = +0.6 mm
  • 2H01, X = -1.0 mm, Y = +0.9 mm
  • Orbit lock on 2C24 and 2H01 ONLY if raster is OFF, otherwise orbit lock on 2C21 and 2C24 (note: this appears as "stopped" on the beam line GUI).

FSD Thresholds

  • Upstream: 2000 Hz
  • Midstream: 2000 Hz
  • Downstream: 100000 Hz (1e5)
  • BOM: 1000000 Hz (BOM not installed for RG-C)
  • 5 ms dwell time

Reference plots and histograms

Counter rates

  • With 6 nA beam, the upstream counters should read zero.
  • The Midstream ones should read 0-20 Hz or so.
  • Greatly increased rates may indicate bad beam tune or bleed-through from other Halls.

see below for Known Detector Issues

General Information

  • To open CS Studio interface, type "clascss" in some terminal.
  • Controlled access: after you call MCC, they will drop the hall to controlled access once someone goes down and calls them for entry. Then call when they should go back to beam permit and call again to say you want the beam back and what beam current. Rapid access is controlled access without RadCon.
  • If MCC needs to diagnose beam with a harp, we can offer them tagger 2C24 and follow the procedures required for that. 2H01 harp scan should not be done when we have beam raster on.
  • BMT:
    • After HV trip: the channel HV should be turned back on as soon as you notice the trip, power cycle by turning HV OFF and ON without waiting for any amount of time.
    • HV frequently tripping: Call expert. Do not change HVs without approval from the expert.
  • mon12: It can happen that histograms do not get cleared completely at run start. This is seen eg as an excess of small multiplicities. The remedy is to quit mon12 and open it again. Other than that, small multiplicities come from time intervals with beam down. You might want to look at the multiplicities before uploading the mon12 histograms in the logbook.
  • DAQ:
    • rastermon should be using ET on clondaq6
      • this means startup of rastermon via command line: rastermon --et --host clondaq6
    • It should no longer be necessary to quit RasterMon at the end of each run and restart after a successful "Go" for the next run. However, if DAQ crashes, you SHOULD follow these steps, and the same for mon12.
  • Magnet trip: call "Engineering on call", if due to cryo, also inform the target expert about the cryogenic issues.
  • Holes in CND occupancies: CAMAC CFD crate was turned off/on for some reason. You need to run the script to set the thresholds for CND CFDs. Go on a clondaq machine and type cnd-cfd-thresh -w 0. Or call the CND phone if this doesn't work.
  • Hall lights: Before leaving the hall and going to beam permit check that dome lights, forward carriage lights, and pie tower lights are OFF.
  • Moller runs: should be taken with 8-10 nA.
  • Beam viewer: Please REMOVE the beam viewer unless we are actively tuning the beam or calibrating beam position/raster, to avoid damage to electronics, cameras etc.
  • Change of running conditions
    • Check that the trigger alarms (on rate/nA) are set appropriately and RC changes them as needed.
    • Whenever the target type or polarization direction changes, or the half-wave plate status changes, make sure to enter a comment in the BEGIN RUN / END RUN comment box.
    • Do not change running conditions while a run is ongoing. This includes changing target polarization or HWP, etc.

Known Issues

FTT alarms - can be ignored (we do not have the FTT installed)

Fr 11 Nov 2022 ECAL PMT_SEC2_WO8 HV is disabled https://logbooks.jlab.org/entry/4080950

Follow-up Re: RICH tile 21 in sector 1 is dead. Working without one tile out of 276 for a moment https://logbooks.jlab.org/entry/4079453

Run #17396: RICH lost three scalars https://logbooks.jlab.org/entry/4079190

Tuesday, February 7, 2023: BMT Sector 2 Layer 5 is broken (HV set to 200 V)

Shift expert tasks

  • Come to your shift in time for the shift change, 10-15 minutes before the start of your shift.
  • Follow the Short Term Schedule as outlined by RC
    • Run Plan, DAQ Configuration, and References and Standards
    • also check tab GENERAL INFORMATION
  • Keep shift summary up to date in HBLOG. Record all that happens.
  • Polarized target:
    • Helicity-Latched Trigger GUI and the Helicity Trigger Asymmetry strip-chart (not accessible remotely) (example https://logbooks.jlab.org/entry/4041939). (ONLY WHILE ACTUALLY RUNNING ON NH3 AND ND3 targets!)
    • In case of any issues, contact the polarized target expert on call.
    • Ice on the run valve
    • NMR running (ONLY WHILE ACTUALLY RUNNING ON NH3 AND ND3 targets!)
      • The JLab Polarization Display is seen via a VNC window in the counting room. Here, the NMR Controls' blue bar must be moving, indicating that the NMR is running and the polarization is measured.
      • If the NMR display is frozen or disappears, here are the steps to follow:
        • Open a new terminal window on the bottom right-most screen.
        • Type "ssh clasrun@clonsl1"
        • Type "nmr-vnc”
        • Click "Run" under "NMR Controls" - the window should now be updating (blue bar moving)
      • The NMR frequency needs to be controlled by hand. If you see target polarization (on the red graph) starting to drop, call the expert. They will guide you through the adjustment procedure. This will be in the electronics room by the door to the counting room, in the third crate from the right ("CR-6"). White box which says "EIO Tube" and has a red button at the top right, which says "Move", next to a display for "Position". This will be the one to press, under guidance of the target expert.
    • Alarms from System RG-C Polarized Target (alarm handler).
  • Do a RICH recovery (press the RICH Recovery button on the GUI) once daily during day shift, between runs. Please log in shift summary.
    • Note the automated "RICH Recovery" sequence already confirms RICH4 is up and accepting ssh connections before claiming success.
    • You have to "Cancel->Reset->Configure->Download->Prestart" before starting the next run.
  • Fill out BTA hourly. Click "Load from EPICS" to automatically fill the left side then correct as needed.
    • Accelerator beam time:
      • ABU: acceptable beam used (eg harp scans, calibrations, trigger settings, running)
        • The info from EPICS is not always correct, e.g. when taking data with low beam current, you should change the ABU to the proper (estimated) time by hand instead of simply accepting "0" if you are actually taking data.
      • BANU: beam acceptable but not used (eg radiator change or our problems)
      • BNA: beam not acceptable (eg tuning, drifting, not focused)
    • Experiment beam time
      • ER: experiment ready
      • PCC: planned configuration change (when beam is masked while radiators are moved, DAQ (stopping/starting runs, tests, ...) are PCC..
      • UED: unplanned experiment down, is used for hardware failure
    • Enter fields at tab "Shift Information"
    • Promptly send "Info for MCC" at 7:00, 15:00, and 23:00
    • Sign, viz log completed 8 hour sheet


In case of other questions or uncertainties of what to do, call the RC or PDL

(remote) shift worker: see dedicated Worker Shift tab above.

Shift Worker Tasks

  • Check the information in the Short Term Schedule and GENERAL INFORMATION, for every shift
  • Come to your shift in time for the shift change, 10-15 minutes before the start of your shift.
  • Use the new HBRUN logbook for automated and run-specific entries and screenshots, see https://logbooks.jlab.org/entry/4048698


Make the following log entries ONCE per run

  • Screenshots: submit to logbook only if you capture the information with beam ON
    • Beamline Overview, in VNC or Web Browser
    • CLAS12 Trigger rates and DAQ status
    • RGC Polarized Target GUI - under Beamline on CS-Studio
    • Helicity Asymmetry Strip Charts - see [10] for an example. Also read and follow the instructions below under "Log the Strip Charts".
  • Upload monitoring plots to logbook
    • Standard spectra (mon12): inspect all monitoring histograms ' and carefully compare them to the corresponding reference histograms: reference, current, and 5 most recent runs, see link under tab Useful Links
      • You can choose a different reference run if you are confident what you are doing, the reference numbers refer to logbook entries.
    • Raster Monitoring (use "Log Entry" button on RasterMon screen at bottom-right corner).
      • An example of a "decent looking" RasterMon is here: [11]. The x and y distributions should show a smooth dome, without any horns or spikes on it and without the distributions being cut off at the edges.

Once per shift:

  • Fill the shift checklist
  • Log screen shots of RICH temperature and scaler maps. Log in RICH logbook.

Regularly:

  • reset & check spectra frequently (every 30 - 60 minutes)
    • Some plots in the online mon12 have a choice of histogram sets per sector, select buttons at the bottom of the plot. That means you have to look at all sectors for these histograms.
    • The logbook entry shows all histograms.
  • Check the life cam of the polarized target run valve for plumes or ice buildup (hallbcam04)
    • Make sure you refresh the web page! Its no longer necessary to put a snapshot into the logbook UNLESS something looks suspicious. In THAT case, immediately inform the target expert(s).
  • Log the strip charts in time intervals according to the x-axis time span, via right-click on the screen and selecting "Make Elog Entry". Make sure NOT to submit to ELOG.
    • Beam current and position strip-charts (CS-Studio -> Beamline -> Strip Charts)
    • Helicity Trigger Asymmetry strip-chart (CS-Studio -> DAQ -> Helicity-Latched Trigger GUI Screen -> click on "Menu" -> myaPlot (not accessible remotely) -> Choose "load config time axis: start: -12 hours end: NOW" and click "accept"
      • Example
      • Choose reasonable y / x axis ranges: R-click on the axis -> Modify (axis-name) Axis
      • For the y axis in the bottom panel, choose the NMR polarization and a reasonable range for the y axis (always from 0 to some maximum value), same for the 60-min trigger bit polarization. Those two do NOT have to have the same scale - it is better to try to get the dark blue and red curves to lie on top of each other (more or less).
      • Set the time axis auto-update. ">>" symbol will appear below the time axis when this is activated. (Right-click on X axis ->" [A] Set Auto Time Stepping")

For REMOTE Shifts (offsite):

ATTENTION: If you plan to take (a) remote shift(s), you MUST test your setup (including VNC connection) at least 24 hours before your first shift!