Difference between revisions of "Run Group A"

From clas12-run
Jump to navigation Jump to search
 
(852 intermediate revisions by 19 users not shown)
Line 9: Line 9:
 
===[https://accweb.acc.jlab.org/hco/readiness Hot Checkout]===
 
===[https://accweb.acc.jlab.org/hco/readiness Hot Checkout]===
 
===[https://bta Beam Time Accounting]===
 
===[https://bta Beam Time Accounting]===
 +
* See guidance for BTA in '''[https://accwiki.acc.jlab.org/pub/SWDocs/BeamTimeAccounting/Machine_Time_Accounting_User_Guide.pdf Beam Time Accounting User Guide]'''.
 
<!-- ===[https://clasweb.jlab.org/wiki/index.php/CLAS12_OPS_Doc#CLAS12_Operations_Documentation Operations Documentation]=== -->
 
<!-- ===[https://clasweb.jlab.org/wiki/index.php/CLAS12_OPS_Doc#CLAS12_Operations_Documentation Operations Documentation]=== -->
 +
===[https://www.jlab.org/Hall-B/run-web/rga/ESAD_HallB-CLAS12_rgA.pdf ESAD], [https://www.jlab.org/Hall-B/run-web/rga/COO_HallB-CLAS12_rgA.pdf COO], [https://www.jlab.org/Hall-B/run-web/rga/RSAD_HallB-CLAS12_rgA.pdf RSAD], [https://www.jlab.org/div_dept/train/SAF111/Hall%20B%20worker%20Safety%20Training%20%28SAF111%29%20%2008%2001-12-1.pdf ERG] ===
  
 
| valign=top |
 
| valign=top |
 
===Manuals===
 
===Manuals===
 +
* [https://clasweb.jlab.org/wiki/images/c/c2/Band_om.pdf BAND]
 +
* [https://clasweb.jlab.org/wiki/images/4/4d/Beamline_manual.pdf Beamline]
 +
* [https://clasweb.jlab.org/wiki/images/9/97/Ops_manual_cnd.pdf CND]
 +
* [https://clasweb.jlab.org/wiki/images/c/c1/Shift_Worker_Manual_January_2018.pdf Cryo-Target]
 +
* [https://clasweb.jlab.org/wiki/images/0/0f/Ctof_manual.pdf CTOF]
 +
* [https://clasweb.jlab.org/wiki/images/a/ab/Opman_master.pdf DAQ]
 
* [https://clasweb.jlab.org/wiki/images/b/b2/Drift-chamber-operating-procedure.pdf DC]
 
* [https://clasweb.jlab.org/wiki/images/b/b2/Drift-chamber-operating-procedure.pdf DC]
 +
* [https://clasweb.jlab.org/wiki/images/a/a2/Ec_manual.pdf ECAL]
 +
* [https://clasweb.jlab.org/wiki/images/3/3b/FT-Manual.pdf FT]
 
* [https://clasweb.jlab.org/wiki/images/b/b0/Ftof_manual.pdf  FTOF]
 
* [https://clasweb.jlab.org/wiki/images/b/b0/Ftof_manual.pdf  FTOF]
* [https://clasweb.jlab.org/wiki/images/a/a2/Ec_manual.pdf ECAL]
+
* [https://clasweb.jlab.org/wiki/images/f/f1/HTCC_MANUAL.pdf HTCC]
 
* [https://wiki.jlab.org/clas12-run/images/d/d2/Ltcc_manual.pdf LTCC]
 
* [https://wiki.jlab.org/clas12-run/images/d/d2/Ltcc_manual.pdf LTCC]
* [https://clasweb.jlab.org/wiki/images/f/f1/HTCC_MANUAL.pdf HTCC]
+
* [https://clasweb.jlab.org/wiki/images/a/ad/Documentation_Shifters_MVT.pdf MVT]
 +
** [https://wiki.jlab.org/clas12-run/images/b/bf/MVT_for_Dummies.pdf MVT turn on procedure]
 
* RICH: [https://clasweb.jlab.org/wiki/images/e/ea/RICH_Manual.pdf expert] [https://wiki.jlab.org/clas12-run/images/d/d9/RICH_Controls_mc.pdf novice]
 
* RICH: [https://clasweb.jlab.org/wiki/images/e/ea/RICH_Manual.pdf expert] [https://wiki.jlab.org/clas12-run/images/d/d9/RICH_Controls_mc.pdf novice]
* [https://clasweb.jlab.org/wiki/images/0/0f/Ctof_manual.pdf CTOF]
+
* [[Media:clas12controls_shift.pdf|Slow Controls]]
* [https://clasweb.jlab.org/wiki/images/9/97/Ops_manual_cnd.pdf CND]
+
* [https://clasweb.jlab.org/wiki/images/d/dc/Hall_B_Solenoid_Power-Up_and_Power-Down_Procedure.pdf Solenoid Power-Up and Power-Down Procedure]
* [https://clasweb.jlab.org/wiki/images/9/96/Svt_operation_manual_v1_1.pdf  SVT]
+
* [https://clasweb.jlab.org/wiki/images/9/96/Svt_operation_manual_v1_1.pdf  SVT]To switch on SVT see [https://logbooks.jlab.org/files/2018/10/3615766/svt_problem_solving_0.pdf SVT short]
* [https://clasweb.jlab.org/wiki/images/a/ad/Documentation_Shifters_MVT.pdf MVT]
 
<!--===** [https://wiki.jlab.org/clas12-run/images/b/bf/MVT_for_Dummies.pdf MVT turn-on procedure]===-->
 
** [https://wiki.jlab.org/clas12-run/images/2/2d/MVT_for_Dummies_noFMT.pdf MVT turn on procedure]
 
* [https://clasweb.jlab.org/wiki/images/3/3b/FT-Manual.pdf FT]
 
* [https://clasweb.jlab.org/wiki/images/4/4d/Beamline_manual.pdf Beamline]
 
 
* [https://clasweb.jlab.org/wiki/images/d/d6/Hall_B_Torus_Power-Up_and_Power-Down_Procedure.pdf Torus Power-Up and Power-Down Procedure]
 
* [https://clasweb.jlab.org/wiki/images/d/d6/Hall_B_Torus_Power-Up_and_Power-Down_Procedure.pdf Torus Power-Up and Power-Down Procedure]
* [https://clasweb.jlab.org/wiki/images/d/dc/Hall_B_Solenoid_Power-Up_and_Power-Down_Procedure.pdf Solenoid Power-Up and Power-Down Procedure]
 
* [https://clasweb.jlab.org/wiki/images/0/06/Cryo-target_manual.pdf Target]
 
* [https://clasweb.jlab.org/wiki/images/a/ab/Opman_master.pdf DAQ]
 
* [[Media:clas12controls_shift.pdf|Slow Controls]]
 
  
 
| valign=top |
 
| valign=top |
 
===Procedures===
 
===Procedures===
 
* [[Media:estab_beam.pdf|Establishing Physics-Quality Beam]]
 
* [[Media:estab_beam.pdf|Establishing Physics-Quality Beam]]
* [[Media:moller.pdf|Performing M&oslash;ller Runs]]
+
* [[Media:clas12moller.pdf|Performing M&oslash;ller Runs]]<!--** [[Media:moller.pdf|Old, Expert M&oslash;ller]]-->
 
* [[Media:HarpScanManual.pdf|Performing Harp Scans]]
 
* [[Media:HarpScanManual.pdf|Performing Harp Scans]]
 
* [https://wiki.jlab.org/hps-run/images/0/0c/Accessing_the_tunnel.pdf Tunnel/Hall Access]
 
* [https://wiki.jlab.org/hps-run/images/0/0c/Accessing_the_tunnel.pdf Tunnel/Hall Access]
* [https://clonwiki0.jlab.org/wiki/index.php/DAQ/Online_Quick_Reference <span style="color:red;"><b>DAQ Quick Reference/Recovery</b></span>]
+
<!--* [https://clonwiki0.jlab.org/wiki/index.php/DAQ/Online_Quick_Reference <span style="color:red;"><b>DAQ Quick Reference/Recovery</b></span>] -->
  
 
| valign=top |
 
| valign=top |
Line 54: Line 56:
  
 
= Phone Numbers =
 
= Phone Numbers =
 +
 +
If calling local numbers (with area code prefix '''757''') from the counting room dial '''9+[last 7 digits]'''. To call other area codes dial '''91+[10 digit number]'''
 +
 
<!--#######################################  PHONE NUMBERS  #############################################-->
 
<!--#######################################  PHONE NUMBERS  #############################################-->
 
{{PhoneNumbers}}
 
{{PhoneNumbers}}
[https://wiki.jlab.org/clas12-run/index.php?title=Template:PhoneNumbers&action=edit Click Here]  to edit Phone Numbers.  Note, you then also have to [https://wiki.jlab.org/clas12-run/index.php?title=Engineering_Run&action=edit&section=11 edit this page] to force a refresh.
+
[https://wiki.jlab.org/clas12-run/index.php?title=Template:PhoneNumbers&action=edit Click Here]  to edit Phone Numbers.  Note, you then also have to [https://wiki.jlab.org/clas12-run/index.php?title=Run_Group_A&action=edit&section=9 edit this page] to force a refresh.
  
<!-- JUST MODIFY AND SAVE ANYTHING IN THIS COMMENT BLOCK TO FORCE A REFRESH OF THE PHONE NUMBERS TEMPLATEs-->
+
<!-- JUST MODIFY AND SAVE ANYTHING IN THIS COMMENT BLOCK TO FORCE A REFRESH OF THE PHONE NUMBERS TEMPLATE-->
  
 
= Short Term Schedule =
 
= Short Term Schedule =
<!--#######################################  SHORT TERM  ################################################-->
 
 
<center><font color=blue size=4>
 
<center><font color=blue size=4>
''' CLAS12 Run Group A, Winter 2018 </font> '''<br>
+
''' CLAS12 Run Group A, Spring 2019 </font> '''<br>
''' Beam energy 6.4 GeV (3 pass) '''<br>
+
''' Beam energy 10.2 GeV (5 pass) '''<br>
 
''' Important: Document all your work in the logbook! '''<br>
 
''' Important: Document all your work in the logbook! '''<br>
''' Remember to fill in the [https://docs.google.com/spreadsheets/d/1j6UMJsId8VlsY00dg9Vqm0wmEJZLWVZlsBS-aL49xxw/edit?usp=sharing run list] at the beginning and end of each run (clas12run@gmail.com can fill the run list)'''<br>
+
''' Remember to fill in the [https://docs.google.com/spreadsheets/d/1g2L33OKvKVFMq3MNGYAuS02l0CCKomPbDm8iULLhueY/edit#gid=0 run list] at the beginning and end of each run
 
</center>
 
</center>
  
== RC: Daniel S. Carman  ==
+
== RC: Nick Markov ==
 
* (757) 575-7540   
 
* (757) 575-7540   
 
* 9 575 7540 from Counting Room
 
* 9 575 7540 from Counting Room
* carman@jlab.org
+
* [mailto:markov@jlab.org markov@jlab.org]
  
== PDL: Eugene Pasyuk ==
+
== PDL: Maurizio Ungaro ==
 
*  (757) 876-1789  
 
*  (757) 876-1789  
 
* 9 876-1789 from Counting Room
 
* 9 876-1789 from Counting Room
* pasyuk@jlab.org
+
* [mailto:ungaro@jlab.org ungaro@jlab.org]
 +
 
 +
{| {{TableStyle1}}
 +
 
 +
| valign=top width=50% |
  
<br>
+
== <font color=blue>''' Run Plan: April 8-15, 2019'''</font>==
 +
(Last updated: April 12th, 2019 @ 19:00)
  
* Note 1: Be very mindful of the background rates in the halo counters, rates in the detectors, and currents in the SVT for all settings to ensure that they are at safe levels.
+
<b>DAQ config: PROD66; Trigger file: rga_v2.trg</b>
 +
<!--
 +
* When the Hall is in beam permit:
 +
** Energize the tagger
 +
** The liquid-hydrogen target should be full
 +
** All detectors should be off (except for MVT in safe mode).
 +
** The solenoid should be at -100% field (2416 A) and the torus should be at -100% field (3770 A negatives inbending).
  
* Note 2: At the end of each run, follow the DAQ restart sequence "end run", "abort", "reset", "download", "prestart", "go". After DAQ prestart is complete reboot the scaler IOCs with the command: iocjscalerRestartAll.sh. Note: After each step, make sure it is complete in the Run Control message window. If a roc has crashed, find which one it is and issue a roc_reboot command and try again. Contact the DAQ expert if there are any questions.
+
* When beam is available:
 +
** Establish the beam on the tagger yoke dump (see instructions [https://wiki.jlab.org/clas12-run/images/e/e3/Estab_beam.pdf]).  
 +
** Perform 2C21 and 2C24 harp scans (follow instructions [https://wiki.jlab.org/clas12-run/images/e/e3/Estab_beam.pdf])
  
* Note 3: Nominal beam positions: '''2C21 (X=0.0 mm, Y=0.0 mm), 2C24 (X=0.0 mm, Y=0.7 mm), 2H01 (X=0.3 mm, Y=-0.6 mm)'''
+
* If beam is acceptable:
 +
** Degauss the tagger magnet
 +
** Set the FSD thresholds(upstream 2000, midstream 2000, downstream 500000, BOM 35000, 5.0 ms dwell time)
 +
** Send 5 nA beam to Faraday cup and make sure beam is clearly seen on the downstream viewer and the halo counter rates are acceptable.
 +
** Perform 2H01 harp scan (follow instructions [https://wiki.jlab.org/clas12-run/images/e/e3/Estab_beam.pdf]).
  
* Note 4: With beam to the Faraday Cup, typical rates an all halo counters upstream from the target should be either 0 or of the order of few counts. Count rates in the range of tens or more may indicate bad beam tune or bleed-through from other Halls.
+
* After beam is established on FC and the beam profile is acceptable, turn on the CLAS12 detectors.
  
{| {{TableStyle1}}
+
* Take low current production at 10 nA for 4 hr.
 +
-->
 +
<!--
 +
* Take production data at 50 nA in 4 hr runs!
 +
 
 +
*Note: <font color=red>DO NOT IGNORE</font> unsafe FSD masking alarm! Follow alarm guidance.
 +
Take production data at 50nA for 4 hr until he swing shift.
  
| valign=top width=50% |
+
Starting from the swing shift,
  
== <font color=blue>''' Run Plan:'''</font>==
+
* Take 2 hours random trigger run at 10 nA using  rgb_v9_1_faraday_noprescale.trg trigger file and beam blocker removed. Expect 10 kHz DAQ rate. Change the DAQ alarm limits by going to DAQ /CLAS12 Trigger /Menu /Alarm Settings Expert/ Set All Normalized Rate Limits when the beam and rates are stable.
''(last update 2/5 - 13:00)''
 
  
The beam position should be as indicated above. Make sure FSD thresholds are set correctly for whatever current is selected (refer to instructions in the "Establish-physics quality beam" procedure at [https://wiki.jlab.org/clas12-run/images/e/e3/Estab_beam.pdf]), integration time is set to 5 ms, and that the orbit locks are on.  
+
* Take 20 minutes random trigger run at 50 nA using  rgb_v9_1_presxcale_3.trg trigger file and beam blocker removed. Expect 15 kHz DAQ rate. Change the DAQ alarm limits by going to DAQ /CLAS12 Trigger /Menu /Alarm Settings Expert/ Set All Normalized Rate Limits when the beam and rates are stable.
  
* Make sure the hydrogen target is empty.
+
* Take 6 hours low luminosity run at 10 nA with the beam blocker in and rga_v2.trg trigger. Change the DAQ alarm limits by going to DAQ /CLAS12 Trigger /Menu /Alarm Settings Expert/ Set All Normalized Rate Limits when the beam and rates are stable.
* Ramp the torus to 75% field (negatives intending/positive polarity); Ramp the solenoid to 100% field (positive polarity)
 
* Prepare for tuning using a 5 nA beam to the tagger yoke: SVT (contact expert to do it), MVT, CND, CTOF, FTT, HTCC, DC, FTOF should be off, tagger magnet should be on. Follow the instructions in the "Establish-physics quality beam" procedure at [https://wiki.jlab.org/clas12-run/images/e/e3/Estab_beam.pdf]. Compare harp scan to the ones performed for KPP at [https://logbooks.jlab.org/entry/3455743 2C21] and [https://logbooks.jlab.org/entry/3455744 2C24]. Consult with the beamline expert in case of issues.
 
* If beam profiles at the tagger are acceptable, move to beam tuning to the Faraday Cup with a 5 nA beam. Again, refer to the instructions in the "Establish-physics quality beam" procedure at [https://wiki.jlab.org/clas12-run/images/e/e3/Estab_beam.pdf]. Compare harp scan with one performed for KPP at [https://logbooks.jlab.org/entry/3455750 2H01].
 
* Once beam to Faraday Cup is established, prepare to start data taking. Switch on all detectors with 5 nA beam; contact expert to switch on SVT.
 
* Start up DAQ using PROD/elec6_htcc_1phe_pcal_150.trg at 5 nA and raise beam current up to 50 nA. Stop if there are rate/current issues in the detectors.
 
* Take empty target data using PROD/elec6_htcc_1phe_pcal_150.trg. Take 6 hours of data starting a new run every 2 hours.
 
* Turn the beam off and fill hydrogen target
 
* Begin flowing gas to the MM detectors (BMT, FMT, FT-Trk). Contact the MM expert for this work.
 
* Turn on beam at 5 nA and turn up to 30 nA. Put pictures of beamline scalers and detector rate/current screens in the logbook.
 
* Take a series of short data runs to optimize the pre-scale factors for the FT trigger.
 
* Take data at 30 nA with PROD/elec6_htcc_1phe_pcal_150.trg. Two shifts of data taking in this configuration.
 
  
* Hall B work for Monday:
+
* At 2 am empty the target and run 150 nA beam until the beam is taken away with rga_v2.trg and the beam blocker in. Change the DAQ alarm limits by going to DAQ /CLAS12 Trigger /Menu /Alarm Settings Expert/ Set All Normalized Rate Limits when the beam and rates are stable. Change the BTA accounting limits in the Beamlin/BTA config (replace the upper limit with 160 nA).  
** Ramp down solenoid and torus (RC)
 
** Complete shielding addition outside scattering chamber (Hall B Engineering)
 
** Restore beamline (Hall B Engineering)
 
** Replace FT-Hodo mezzanine board (N. Zachariou)
 
** Work on DC cable swaps (M. Cook + M. Mestayer)
 
** Work on vacuum gauge (D. Anderson)
 
** Investigate polarity of busy signal (S. Boyarinov)
 
** Setup gated/ungated scalers and clock scalers (S. Boyarinov)
 
** SAF111 walkthrough (E. Pasyuk)
 
** Pass change (5-pass to 3-pass)
 
  
<!-- == <font color=blue>''' Beam Tuning:'''</font>==
 
 
* <b>Whenever preparing to receive beam, make sure the following conditions are established: all CLAS12 detectors are off and target is empty. Turn DC HV off, leaving LV on. For SVT, MVT, FTH and FTT, first turn HV off and then LV off. For any problem, consult with the expert-on-call.</b>
 
* Establish beam to the tagger yoke first:
 
*# ask MCC to energize the tagger dipole magnet and set the current as needed for dumping the beam in the designated dump on the tagger yoke. MCC will ask you to change (set) the beam delivery mode.
 
*# position the "blank" collimator on the beam (this is a collimator block, 30 cm long Ni cylinder, without a hole)
 
*# when the tagger magnet is at required setting ask MCC if they are ready to deliver beam to the tagger yoke dump (<=5 nA). It may take ~1 hour for MCC to setup and cleanly transport beam to the tagger yoke dump.
 
*# perform harp scans using the wire harp at 2C21 girder and 2C24 (tagger harp). Beam profile, peak position, width and signal/background ratio should be like in https://logbooks.jlab.org/entry/3507602 and https://logbooks.jlab.org/entry/3507605. Ask MCC to retune if needed (e.g. beam is too wide or asymmetric or has large tails),repeat the scan after every tune. Iterate to get acceptable beam profile.
 
* Send the beam to Faraday Cup dump:
 
*# CLAS12 detectors should be OFF, the solenoid magnet current is at 50% its max, torus is at 100%.
 
*# ask MCC to degauss and turn the tagger dipole off; while the magnet is being degaussed call the beamline expert (S. Stepanyan) to inform him, you are starting the procedure to send the beam to the Faraday Cup;
 
*# position 20 mm collimator on the beam and move "Chromax" screen of the downstream viewer in beam position (if it is not already)
 
*# move the beam blocker out: in this configuration beam current readings at 2C24, 2H01 and Faraday Cup should be close.
 
*# ask for <= 1 nA, positions, quads settings and rates should be as in https://logbooks.jlab.org/entry/3502404; pay particular attention to halo counter rates: if very different from what shown in the link, call MCC and ask them to verify their settings; note that BOM gains were lowered today and rates should be lower (see https://logbooks.jlab.org/entry/3502559).
 
*# make sure beam is stable, beam spot is clearly visible on the Chromax viewer and current does not exceed 1 nA;
 
*# repeat harp scans at 2C21, 2C24 (tagger harp) and 2H01: the profile for 2H01 should be as in https://logbooks.jlab.org/entry/3507626. Make sure you select the proper PMT for the analysis. The profile at 2C21 and 2C24 should be as in the scans performed with beam to the tagger magnet yoke dump. If necessary ask MCC to adjust the beam profile at 2H01 to match the previous scan.
 
  
When ready to get beam, turn all beamline devices ON, turn all CLAS12 detectors OFF
+
The beam is expected to be back around 3-15 pm on Monday, April 8'th.
 +
Change HWP to "OUT" and take a Moeller run.
 +
After establishing the physics-quality beam (follow the procedure outlined in https://wiki.jlab.org/clas12-run/images/e/e3/Estab_beam.pdf) take production data at in 4 hours runs at 50 nA, DAQ config: PROD66; Trigger file: rga_v2.trg.
 +
On the Torus/Magnet power Suppy monitor torus MPS Control Comm 
 
-->
 
-->
 +
 +
Take production data at in 4 hours runs at 50 nA, DAQ config: PROD66; Trigger file: rga_v2.trg.
 +
 +
On the Torus/Magnet power Suppy monitor torus MPS Control Comm  light. It should be green. If not, contact Magnet group.
 +
 +
<b>Pay special attention to scalers of the PCAL and FTOF in sector 5 (under scalers/CLAS12 Forward Carriage/Sector 5) and make sure there are no dead channels in PCAL and FTOF. Also, when looking at monitoring histograms, pay special attention to sector 5 for the same detectors.</b>
 +
<b> We had a problem with scalers in sector FTOF 4 which went out. Please monitor it very closely (along with sector 5) and if anyhitng happen contact Sergey (DAQ expert) right away.</b>
 +
 +
<font color=red>
 +
After the beam is off at 6 am on Monday morning:<br>
 +
- turn the HTCC HV off;<br>
 +
- turn the LTCC HV off;<br>
 +
- turn the FT HV off (only HV!);<br>
 +
 +
- <b>Do Not turn BAND HV Off</b>.<br>
 +
- <b>Do Not turn EC/PCAL HV Off</b>.<br>
 +
- <b>Do Not turn CTOF and FTOF HV Off</b>.<br>
 +
- <b>Do Not turn RICH HV Off</b>.<br>
 +
- <b>Do Not turn SVT HV Off</b>.<br>
 +
 +
</font>
 +
 +
*Note: <font color=red>DO NOT IGNORE</font> unsafe FSD masking alarm! Follow alarm guidance.
 +
 +
 +
<font color=red>'' [https://clas12mon.jlab.org/mon12/histograms/?reference=3630375 Compare the monitoring histograms from clas12mon to the reference and troubleshoot as needed.] ''</font>
 +
 +
<b><font color=red> At the end of each run, follow the standard DAQ restart sequence ''' <br>
 +
''(Note, this might be different from the instructions coming up on RunControl.)''
 +
 +
* "end run", "cancel", "reset"
 +
* if the run ended correctly:
 +
**  '''"download", "prestart", "go"'''
 +
* if the run did not end correctly or if any ROCs had to be rebooted:
 +
** "configure", "download", "prestart", "go"
 +
</font></b>
 +
 +
== <font color=blue>''' References and Standards:'''</font>==
 +
''(last update March 27, 2019 @ 8:53 a.m.)''
 +
 +
<b> Restoration of Beam to Hall B</b>
 +
 +
<b> Nominal Beam Positions </b>
 +
*2H01, X: +3.0 mm, Y: -1.0 mm
 +
*2C24, X: +0.25 mm, Y: 0.35 mm
 +
 +
<b> FSD Thresholds </b>
 +
* Upstream: 2000 Hz
 +
* Midstream: 2000 Hz
 +
* Downstream: 500000 Hz
 +
* BOM: 35000
 +
 +
<b> Reference Harp Scans for Beam on Tagger Dump: </b> 2C21 [https://logbooks.jlab.org/entry/3672101], 2C24 [https://logbooks.jlab.org/entry/3672102]
 +
 +
<b> Reference Harp Scans for Beam on Faraday Cup: </b> 2H01 [https://logbooks.jlab.org/entry/3672120]
 +
 +
<b> Reference Monitoring Histograms</b> 5 nA production trigger [https://logbooks.jlab.org/entry/3672274], 50 nA, production trigger [https://logbooks.jlab.org/entry/3672136] (to be updated)
 +
 +
<b> Reference Scalers and Halo-Counter Rates: </b>
 +
* Well-tuned CW beam on FC, Full LH2 target, CLAS12 ON: 5 nA [https://logbooks.jlab.org/entry/3672117], 50 nA [https://logbooks.jlab.org/entry/3672129]
 +
* Well-tuned CW beam on FC, Empty Target, CLAS12 OFF: 5 nA [https://logbooks.jlab.org/entry/3649436]
 +
* Well-tuned beam during Moller run [https://logbooks.jlab.org/entry/3649364]
 +
* Well-tuned beam on Tagger Dump at 5 nA during harp scans: [https://logbooks.jlab.org/entry/3649358]
 +
* Reference FTC histogram for 5 nA running: [https://logbooks.jlab.org/entry/3665122]
 +
 +
<b> SVT acceptable currents: </b> 1 uA
  
 
| valign=top |
 
| valign=top |
Line 147: Line 205:
 
==<font color=blue>''' General Instructions''':</font>==
 
==<font color=blue>''' General Instructions''':</font>==
  
* For a given beam current, compute the FSD thresholds according to the [https://wiki.jlab.org/clas12-run/images/e/e3/Estab_beam.pdf Establish Physics Quality Beam] document. Call MCC to update the values. Contact the beamline expert if there are questions about setting the FSD thresholds.
 
 
* The main lights in the Hall (dome lights) and the Forward Carriage lights are being kept off because of light leaks affecting some of the detectors. If these lights are switched on during an access, they should be switched off when leaving the Hall. Note that the dome lights when switched off cannot be turned back on immediately because they require 10-15 min to cooldown.
 
* The main lights in the Hall (dome lights) and the Forward Carriage lights are being kept off because of light leaks affecting some of the detectors. If these lights are switched on during an access, they should be switched off when leaving the Hall. Note that the dome lights when switched off cannot be turned back on immediately because they require 10-15 min to cooldown.
* Do not run more than 60 minutes above 30 nA with 5-pass beam without the beam blocker in front of Faraday cup. Put beam blocker in for long running at high currents for 5 pass operations.
+
* Do not run more than 30 minutes above 30 nA with 5-pass beam without the beam blocker in front of Faraday cup. Put beam blocker in for long running at high currents for 5 pass operations.
 
* Turn DC HV off only for beam tuning; if no beam is available or when beam is stable, keep them on even if you are not taking data.
 
* Turn DC HV off only for beam tuning; if no beam is available or when beam is stable, keep them on even if you are not taking data.
 
* In case of loss of communication with IOCBTARG, follow instructions at https://logbooks.jlab.org/entry/3502218
 
* In case of loss of communication with IOCBTARG, follow instructions at https://logbooks.jlab.org/entry/3502218
 
* With any issue contact On-Call Experts or RC - do not spend more than 15-20 min trying to fix the problem.
 
* With any issue contact On-Call Experts or RC - do not spend more than 15-20 min trying to fix the problem.
* All jscaler iocs (iocjscalerX) on the health screen (under DAQ tab) must be restarted after every DAQ prestart is completed.
+
* Check for and read any comments to log-book entries made during your shift.
* Check that no unecessary beamline-related screens are open.  This includes particularly the big beamline overview screen, but also and any motor/harp/collimator screens, and ioc health screens.
 
  
==Every Shift:==
+
'''Once Per Day (on day shift):'''
# Follow run plan as outlined by RC
+
* Complete RICH recovery procedure - see Note: 14 below
# If any concern about beam stability, ask MCC if orbit locks are on (they should be).
 
# Keep shift summary up to date in HBLOG. Record all that happens.
 
#* Check on white board all scalers, strip charts and monitoring plots that need to be logged regularly
 
#* Document any beam condition change and send scaler GUIs to HBLOG
 
#* [https://bta.acc.jlab.org Fill out BTA] hourly.  Click "Load from EPICS" to automatically fill the left side.
 
#* Fill and submit the [https://logbooks.jlab.org/checklists/151 shift checklist in the logbook]
 
# Perform 2H01A harp scan once per shift or when beam conditions have changed, based on beam monitors (BPMs, halo rates, beam-viewer). During harp scans the HV for DC and HTCC should be OFF.
 
  
==Every Run:==
+
'''Every Shift:'''
# Log screenshots of:
+
* Follow run plan as outlined by RC
#* main scaler GUI display
+
* If any concern about beam stability, ask MCC if orbit locks are on (they should be).
#* Detector occupancy plots
+
* Keep shift summary up to date in HBLOG. Record all that happens.
#* Trigger rate gui
+
* Document any beam condition change and send scaler GUIs to HBLOG
#* Beam strip charts
+
* [https://bta.acc.jlab.org Fill out BTA] hourly.  Click "Load from EPICS" to automatically fill the left side.
 +
* Upload spectra from clas12mon at begin and end of shift and cross-check with reference spectra
 +
** Reset clas12mon every ~2 hours and inspect spectra
 +
* Fill and submit the [https://logbooks.jlab.org/checklists/151 shift checklist in the logbook]
 +
* Monitor the SVT Slow Controls status, post plot of current stability in the HBSVT elog once per shift.
 +
 
 +
'''Every Run:'''
 +
 
 +
*Log screenshots of:
 +
** main scaler GUI display  
 +
** Trigger rate gui
 +
** Beam strip charts
 +
** FTC scalers
 +
* Fill out the run info in [https://docs.google.com/spreadsheets/d/1NY1GNIZXPtpB9u4QwP6eNRSrvDkCzFmhQg5RR3V3j7E/edit#gid=0 run list] at the beginning and at the end of each run.
 +
* <b> When checking the ECAL response, make sure to look at the histograms for each sector by using the sector buttons at the bottom of the clas12mon window - if adcecal* or/and adcpcal* ROC crashes, there will be no alarm and the histograms are the way to notice this issue.
 +
* Same holds for FT.</b>
  
 
|}
 
|}
 +
 +
* '''Note 1: Be very mindful of the background rates in the halo counters, rates in the detectors, and currents in the SVT for all settings to ensure that they are at safe levels.'''
 +
The integrated rates on the upstream counters have to be in the range 0-15 Hz (rates up 100 Hz are acceptable) and the rates on the midstream counters have to be in the range 10-20 Hz (acceptable up to 50 Hz) @50 nA. Counting rates in the range of hundreds of Hz may indicate bad beam tune or bleed-through from other Halls.
 +
 +
* '''Note 2: FTOF HVs: The goal is to minimize the number of power cycles of the dividers.
 +
** should be turned off during the initial beam tuning down to the Faraday Cup after CLAS12 has been off for a long shutdown, when doing a Moller run, when doing harp scans, or if there is tuned/pulsed beam in the upstream beamline.'''
 +
** should be left on after an initial beam tune has been established and if there are only minor steering adjustments and “tweaks” being made.
 +
** if shift workers have doubts what to do with the HVs, they can always contact the TOF on-call expert for advice.
 +
 +
* '''Note 3: In case of a Torus and/or Solenoid Fast Dump do the following:
 +
*# Notify MCC to request beam OFF and to drop Hall B status to Power Permit
 +
*# Call Engineering on-call
 +
*# Make separate log entry with copies to HBTORUS and HBSOLENOID logbooks. In the "Notify" field add Ruben Fair, Probir Goshal, Dave Kashy and esr-users@jlab.org
 +
*# Notify Run Coordinator
 +
*# Turn off all detectors'''
 +
 +
*'''Note 4: When beam is being delivered to the Faraday Cup:'''
 +
*# the Fast Shut Down elements: Upstream, Midstream, Downstream, BOM, and Solenoid should always be in the state <font color=red>UNMASKED</font>
 +
*# No changes to the FSD threshold should be made without RC or beamline expert approval
 +
 +
*'''Note 5: Any request for a special run or change of configuration has to be approved by the RC & documented'''
 +
 +
*'''Note 6: Carefully check the BTA every hour and run the script <font color=red>btaGet.py</font> to print for you what HAS TO BE in BTA for this hour. Edit BTA if it is incorrect.'''
 +
 +
*'''Note 7: Reset CLAS12MON frequently to avoid histogram saturation. If CLAS12MON is restarted change MAX scale to 10 (default is 5) for DC normalized occupncy histograms. This would prevent them from saturation. See log entry [https://logbooks.jlab.org/entry/3667416]'''
 +
 +
*'''Note 8: Shift workers must check the occupancies! Use this tool to compare to previous runs: [https://clas12mon.jlab.org/mon12/histograms/?reference=3650729]'''
 +
<!--[https://clas12mon.jlab.org/mon12/histograms/?reference=3621580]'''-->
 +
 +
*'''Note 9: When you have to turn the whole MVT off, do not press "All HV OFF": Instead go to 'Restore settings' from the MVT overview screen:
 +
*# SafeMode.snp for beam tuning and Moeller runs
 +
*# MV_HV_FullField.snp for full solenoid field
 +
*# MV_HV_MidField.snp wgeb solenoid < 4T
 +
'''
 +
*'''Note 10: Check the vacuum periodically, make sure vacuum is not higher than 5e-5 '''
 +
 +
*''' Note 11: Always reset the CFD threshold after all power off/on on the CND CAMAC crate'''
 +
After the CAMAC crate (camac1) holding the CND CFD boards is switched off for any reason, it is mandatory to reset the associated thresholds typing the
 +
following command from any clon machine terminal: $CODA/src/rol/Linux_x86_64/bin/cnd_cfd_thresh -w 0
 +
 +
If this command is failing and the crate is not responding, reboot it as follows: roc_reboot camac1
 +
 +
*'''Note 12: ''' Shift workers should anyway check routinely scalers to verify they update correctly and make a logbook entry if anomalies are observed after starting a new run.
 +
 +
*'''Note 13: To solve common SVT issues see https://logbooks.jlab.org/entry/3615766'''
 +
 +
*'''Note 14:'''
 +
For RICH recovery procedures, please see Log entry https://logbooks.jlab.org/entry/3562273.  This would apply in the cases of  1. DAQ crash: rich4 is not responding or 2. RICH alarms (LV,missing tile, temperature etc). If it does not work or you are uncertain about what to do, contact the RICH expert on call. <u>Please, note </u> that missing tiles typically occur due to lost communication. Keep in mind that the recovery procedure will kill DAQ. If DAQ is running for other purpose, rather than data taking (for which the RICH acceptance would be important) do not initiate the recovery procedure.
 +
** The most critical parameter for RICH is the temperature of the photosensors. If the temperature rises above limits, an interlock will automatically turn the RICH HV and LV. If this happens, notify the expert on call and keep taking data without RICH.
 +
 +
*'''Note 15:''' Asymmetry on FTCal ADC Scalers: If the beam current is 5 - 10 nA, and the observed asymmetry is out of specs, i.e. > +-2.5%, check (1) that the beam position is according to specs, (2) the response of the rest of CLAS (compare the scalers of FTOF, CTOF, ECAL, etc. from the Scalers GUI to the reference for that current, as posted above). If positions and other detectors do not show any anomalies, keep running. The ADC scalers require at least ~15 nA for a reliable response.
 +
 +
*'''Note 16:''' If ROC mmft1 is 100% busy: power cycle FTT LV (FT->FTT Overview, HV stays ON), roc_reboot mmft1, wait until it reboots (ssh mmft1 to verify). If the first LV recycle/mmft1 reboot doesn’t work call FT expert
  
 
= Monitoring =
 
= Monitoring =
Line 180: Line 297:
 
| valign=top |
 
| valign=top |
 
===Webcams===
 
===Webcams===
* [http://hallbcam07.jlab.org/ Faraday Cup Beam Viewer]
+
* [http://hallbcam06.jlab.org/ Faraday Cup Beam Viewer]
 
* [http://cctv1.jlab.org Tagger Beam Dump Viewer]
 
* [http://cctv1.jlab.org Tagger Beam Dump Viewer]
* [http://cctv12.jlab.org CND CAMAC Crate]
+
<!--* [http://cctv12.jlab.org CND/CTOF Ammeter]
 +
* [http://cctv7.jlab.org FTOF/ECAL Ammeter]-->
 
* [http://hallbcam02.jlab.org Hall Fisheye]
 
* [http://hallbcam02.jlab.org Hall Fisheye]
 
* [http://cctv11.jlab.org Saclay Cryotarget]
 
* [http://cctv11.jlab.org Saclay Cryotarget]
Line 194: Line 312:
 
| valign=top |
 
| valign=top |
 
===Epics on the web===
 
===Epics on the web===
*[https://hallbopi.jlab.org/webopi3.3/w WebOPI] (CUE Login)
+
* [https://hallbopi.jlab.org/webopi3.3/w Hall B WebOPI] (CUE Login)
 +
* [https://epicsweb.jlab.org Accelerator] (CUE Login)
  
 +
|}
 +
 +
== Fall 2018 Run ==
 +
{| {{TableStyle1}}
 +
| valign=top |
 +
[[Image:Fall2018_charge.jpg|fall2018_charge.jpg|700px]]
 +
 +
| valign=top |
 +
[[Image:moller_rg_a_fall.jpeg|500px]]
 +
|}
 +
 +
== Spring 2018 Run ==
 +
 +
{| {{TableStyle1}}
 +
| valign=top |
 +
[[Image:chart.jpeg|chart.jpeg|700px]]
 +
 +
| valign=top |
 +
[[Image:moller_measurement_rg-a.jpg|500px]]
 
|}
 
|}
  
Line 204: Line 342:
 
===Hall-B===
 
===Hall-B===
 
* [https://clasweb.jlab.org/wiki/index.php/CLAS12_OPS_Doc Operation Safety Procedures]
 
* [https://clasweb.jlab.org/wiki/index.php/CLAS12_OPS_Doc Operation Safety Procedures]
* [https://clasweb.jlab.org/wiki/index.php/Engineering_Run_Analysis Offline Analysis Wiki]
+
* [https://wiki.jlab.org/clas12-run/index.php/Engineering_Run Engineering Run Wiki]
 +
* [https://clasweb.jlab.org/wiki/index.php/Engineering_Run_Analysis Engeineering Run Analysis Wiki]
 +
* [https://clasweb.jlab.org/wiki/index.php/Run_Group_A Run Group A Analysis Wiki]
 
* [http://clasweb.jlab.org/rcdb RCDB]
 
* [http://clasweb.jlab.org/rcdb RCDB]
 +
* [https://clas12mon.jlab.org/ CLAS12 mon page]
 +
* [https://clas12mon.jlab.org/mon12/histograms/?reference=3630375 Comparison between mon12 histograms (reference in 1st column compared to last entries)]
 +
* [https://clas12mon.jlab.org/datasize/ Accumulated datasize]
 +
* [https://clas12mon.jlab.org/charge/ Accumulated charge]
 +
 +
===Run lists===
 +
*[https://docs.google.com/spreadsheets/d/1NpojoOi7_gTt_abxgKoHBlofOL7iNWDrtYuiOJ1zoMw RGA Fall 18 run list]
 +
* [https://docs.google.com/spreadsheets/d/1j6UMJsId8VlsY00dg9Vqm0wmEJZLWVZlsBS-aL49xxw RGA Winter 18 run list]
 +
* [https://docs.google.com/spreadsheets/d/1frfBlq51qDXZD6fW5rcRefNXSGdVvdMozKUlAVNoUGc ER run list]
 
| valign=top |
 
| valign=top |
 
===Accelerator===
 
===Accelerator===
Line 211: Line 360:
 
* [http://opweb.acc.jlab.org/CSUEApps/bta03/pd_shiftplan_history.php Program Deputy Shift Plans]
 
* [http://opweb.acc.jlab.org/CSUEApps/bta03/pd_shiftplan_history.php Program Deputy Shift Plans]
 
* [http://opweb.acc.jlab.org/internal/ops/ops_webpage/run_coord/runcoord_form.php?action=main Run Coordinator Reports]
 
* [http://opweb.acc.jlab.org/internal/ops/ops_webpage/run_coord/runcoord_form.php?action=main Run Coordinator Reports]
 +
* Accelerator daily meetings notes (by Mauri) [https://www.evernote.com/pub/maureeungaro/pdldaily]
 +
| valign=top |
 +
===Bluejeans meetings===
 +
* [https://bluejeans.com/230805731 Daily Run meeting] 230805731
 
|}
 
|}
  

Latest revision as of 13:44, 25 July 2024

[edit]

If calling local numbers (with area code prefix 757) from the counting room dial 9+[last 7 digits]. To call other area codes dial 91+[10 digit number]

Role Phone Number
Hall B Run Coordinator (757) 575-7540 (cell)
Hall B Physics Division Liaison (757) 876-1789 (cell)
MCC 7048
Crew Chief 7045
Crew Chief (757) 876-3367 (cell)
Program Deputy (757) 876-7997 (cell)
RadCon (757) 876-1743 (cell)
Gate House Guard 5822
Location Phone Number
Hall B Floor 5165
Hall B Space Frame 5170 and 5171
Hall B Forward Carriage 5371
Hall B Gas Shed 7115
Hall B Counting House 5244 (Shift Expert)
Hall B Counting House (757) 329-4846 (Shift Expert cell)
Hall B Counting House 5245 or 5126 (Shift Worker)
Hall A Counting House 5501
Hall C Counting House 6000
Hall D Counting House 5504
Hall B System Phone Number On-Call Person
Engineering (757) 748-5048 (cell)
(757) 897-9060 (cell)
Engineering On-Call (primary)
Denny Insley (secondary)
Slow Controls (757) 748-6922 (cell) Nathan Baltzell
Beamline (757) 303-3996 (cell) Eugene Pasyuk
DC (757) 218-4372 (cell)
(757) 748-5048 (cell)
Florian Hauenstein (primary)
Engineering On-Call (secondary)
SVT/MVT/MM (757) 541-7539 (cell)
(757) 753-7769 (cell)
Yuri Gotra (primary)
Rafo Paremuzyan (secondary)
ECAL (757) 810-1489 (cell) Cole Smith
FTOF/CTOF/CND (757) 344-7204 (cell) Daniel Carman
ALERT (757) 329-4844 (cell) Raphael Dupré
HTCC/LTCC (757) 344-7174 (cell) Youri Sharabian
FT (757) 344-1848 (cell) Raffaella De Vita
BAND (757) 310-7198 (cell) Florian Hauenstein
RICH (757) 344-3235 (cell)
(757) 748-6922 (cell)
Christopher Dilks (primary)
Nathan Baltzell (secondary)
DAQ (757) 232-6221 (cell) Sergey Boiarinov
HYDRA (317) 550-9226 (cell) Torri Jeske
Authorized Hall B Solenoid/Torus Operators
Hall B Denny Insley, Morgan Cook, Eugene Pasyuk
Magnet Group Probir Ghosha, Renuka Rajput-Ghoshal
Detector Support Group Brian Eng, Pablo Campero, Tyler Lemon
DC Power Onish Kumar, Sarin Philip
  • Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
  • To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
  • Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.

Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.


CLAS12 Run Group A, Spring 2019
Beam energy 10.2 GeV (5 pass)
Important: Document all your work in the logbook!
Remember to fill in the run list at the beginning and end of each run

RC: Nick Markov

PDL: Maurizio Ungaro

Run Plan: April 8-15, 2019

(Last updated: April 12th, 2019 @ 19:00)

DAQ config: PROD66; Trigger file: rga_v2.trg

Take production data at in 4 hours runs at 50 nA, DAQ config: PROD66; Trigger file: rga_v2.trg.

On the Torus/Magnet power Suppy monitor torus MPS Control Comm light. It should be green. If not, contact Magnet group.

Pay special attention to scalers of the PCAL and FTOF in sector 5 (under scalers/CLAS12 Forward Carriage/Sector 5) and make sure there are no dead channels in PCAL and FTOF. Also, when looking at monitoring histograms, pay special attention to sector 5 for the same detectors. We had a problem with scalers in sector FTOF 4 which went out. Please monitor it very closely (along with sector 5) and if anyhitng happen contact Sergey (DAQ expert) right away.

After the beam is off at 6 am on Monday morning:
- turn the HTCC HV off;
- turn the LTCC HV off;
- turn the FT HV off (only HV!);

- Do Not turn BAND HV Off.
- Do Not turn EC/PCAL HV Off.
- Do Not turn CTOF and FTOF HV Off.
- Do Not turn RICH HV Off.
- Do Not turn SVT HV Off.

  • Note: DO NOT IGNORE unsafe FSD masking alarm! Follow alarm guidance.


Compare the monitoring histograms from clas12mon to the reference and troubleshoot as needed.

At the end of each run, follow the standard DAQ restart sequence
(Note, this might be different from the instructions coming up on RunControl.)

  • "end run", "cancel", "reset"
  • if the run ended correctly:
    • "download", "prestart", "go"
  • if the run did not end correctly or if any ROCs had to be rebooted:
    • "configure", "download", "prestart", "go"

References and Standards:

(last update March 27, 2019 @ 8:53 a.m.)

Restoration of Beam to Hall B

Nominal Beam Positions

  • 2H01, X: +3.0 mm, Y: -1.0 mm
  • 2C24, X: +0.25 mm, Y: 0.35 mm

FSD Thresholds

  • Upstream: 2000 Hz
  • Midstream: 2000 Hz
  • Downstream: 500000 Hz
  • BOM: 35000

Reference Harp Scans for Beam on Tagger Dump: 2C21 [1], 2C24 [2]

Reference Harp Scans for Beam on Faraday Cup: 2H01 [3]

Reference Monitoring Histograms 5 nA production trigger [4], 50 nA, production trigger [5] (to be updated)

Reference Scalers and Halo-Counter Rates:

  • Well-tuned CW beam on FC, Full LH2 target, CLAS12 ON: 5 nA [6], 50 nA [7]
  • Well-tuned CW beam on FC, Empty Target, CLAS12 OFF: 5 nA [8]
  • Well-tuned beam during Moller run [9]
  • Well-tuned beam on Tagger Dump at 5 nA during harp scans: [10]
  • Reference FTC histogram for 5 nA running: [11]

SVT acceptable currents: 1 uA

General Instructions:

  • The main lights in the Hall (dome lights) and the Forward Carriage lights are being kept off because of light leaks affecting some of the detectors. If these lights are switched on during an access, they should be switched off when leaving the Hall. Note that the dome lights when switched off cannot be turned back on immediately because they require 10-15 min to cooldown.
  • Do not run more than 30 minutes above 30 nA with 5-pass beam without the beam blocker in front of Faraday cup. Put beam blocker in for long running at high currents for 5 pass operations.
  • Turn DC HV off only for beam tuning; if no beam is available or when beam is stable, keep them on even if you are not taking data.
  • In case of loss of communication with IOCBTARG, follow instructions at https://logbooks.jlab.org/entry/3502218
  • With any issue contact On-Call Experts or RC - do not spend more than 15-20 min trying to fix the problem.
  • Check for and read any comments to log-book entries made during your shift.

Once Per Day (on day shift):

  • Complete RICH recovery procedure - see Note: 14 below

Every Shift:

  • Follow run plan as outlined by RC
  • If any concern about beam stability, ask MCC if orbit locks are on (they should be).
  • Keep shift summary up to date in HBLOG. Record all that happens.
  • Document any beam condition change and send scaler GUIs to HBLOG
  • Fill out BTA hourly. Click "Load from EPICS" to automatically fill the left side.
  • Upload spectra from clas12mon at begin and end of shift and cross-check with reference spectra
    • Reset clas12mon every ~2 hours and inspect spectra
  • Fill and submit the shift checklist in the logbook
  • Monitor the SVT Slow Controls status, post plot of current stability in the HBSVT elog once per shift.

Every Run:

  • Log screenshots of:
    • main scaler GUI display
    • Trigger rate gui
    • Beam strip charts
    • FTC scalers
  • Fill out the run info in run list at the beginning and at the end of each run.
  • When checking the ECAL response, make sure to look at the histograms for each sector by using the sector buttons at the bottom of the clas12mon window - if adcecal* or/and adcpcal* ROC crashes, there will be no alarm and the histograms are the way to notice this issue.
  • Same holds for FT.
  • Note 1: Be very mindful of the background rates in the halo counters, rates in the detectors, and currents in the SVT for all settings to ensure that they are at safe levels.

The integrated rates on the upstream counters have to be in the range 0-15 Hz (rates up 100 Hz are acceptable) and the rates on the midstream counters have to be in the range 10-20 Hz (acceptable up to 50 Hz) @50 nA. Counting rates in the range of hundreds of Hz may indicate bad beam tune or bleed-through from other Halls.

  • Note 2: FTOF HVs: The goal is to minimize the number of power cycles of the dividers.
    • should be turned off during the initial beam tuning down to the Faraday Cup after CLAS12 has been off for a long shutdown, when doing a Moller run, when doing harp scans, or if there is tuned/pulsed beam in the upstream beamline.
    • should be left on after an initial beam tune has been established and if there are only minor steering adjustments and “tweaks” being made.
    • if shift workers have doubts what to do with the HVs, they can always contact the TOF on-call expert for advice.
  • Note 3: In case of a Torus and/or Solenoid Fast Dump do the following:
    1. Notify MCC to request beam OFF and to drop Hall B status to Power Permit
    2. Call Engineering on-call
    3. Make separate log entry with copies to HBTORUS and HBSOLENOID logbooks. In the "Notify" field add Ruben Fair, Probir Goshal, Dave Kashy and esr-users@jlab.org
    4. Notify Run Coordinator
    5. Turn off all detectors
  • Note 4: When beam is being delivered to the Faraday Cup:
    1. the Fast Shut Down elements: Upstream, Midstream, Downstream, BOM, and Solenoid should always be in the state UNMASKED
    2. No changes to the FSD threshold should be made without RC or beamline expert approval
  • Note 5: Any request for a special run or change of configuration has to be approved by the RC & documented
  • Note 6: Carefully check the BTA every hour and run the script btaGet.py to print for you what HAS TO BE in BTA for this hour. Edit BTA if it is incorrect.
  • Note 7: Reset CLAS12MON frequently to avoid histogram saturation. If CLAS12MON is restarted change MAX scale to 10 (default is 5) for DC normalized occupncy histograms. This would prevent them from saturation. See log entry [12]
  • Note 8: Shift workers must check the occupancies! Use this tool to compare to previous runs: [13]
  • Note 9: When you have to turn the whole MVT off, do not press "All HV OFF": Instead go to 'Restore settings' from the MVT overview screen:
    1. SafeMode.snp for beam tuning and Moeller runs
    2. MV_HV_FullField.snp for full solenoid field
    3. MV_HV_MidField.snp wgeb solenoid < 4T

  • Note 10: Check the vacuum periodically, make sure vacuum is not higher than 5e-5
  • Note 11: Always reset the CFD threshold after all power off/on on the CND CAMAC crate

After the CAMAC crate (camac1) holding the CND CFD boards is switched off for any reason, it is mandatory to reset the associated thresholds typing the following command from any clon machine terminal: $CODA/src/rol/Linux_x86_64/bin/cnd_cfd_thresh -w 0

If this command is failing and the crate is not responding, reboot it as follows: roc_reboot camac1

  • Note 12: Shift workers should anyway check routinely scalers to verify they update correctly and make a logbook entry if anomalies are observed after starting a new run.
  • Note 14:

For RICH recovery procedures, please see Log entry https://logbooks.jlab.org/entry/3562273. This would apply in the cases of 1. DAQ crash: rich4 is not responding or 2. RICH alarms (LV,missing tile, temperature etc). If it does not work or you are uncertain about what to do, contact the RICH expert on call. Please, note that missing tiles typically occur due to lost communication. Keep in mind that the recovery procedure will kill DAQ. If DAQ is running for other purpose, rather than data taking (for which the RICH acceptance would be important) do not initiate the recovery procedure.

    • The most critical parameter for RICH is the temperature of the photosensors. If the temperature rises above limits, an interlock will automatically turn the RICH HV and LV. If this happens, notify the expert on call and keep taking data without RICH.
  • Note 15: Asymmetry on FTCal ADC Scalers: If the beam current is 5 - 10 nA, and the observed asymmetry is out of specs, i.e. > +-2.5%, check (1) that the beam position is according to specs, (2) the response of the rest of CLAS (compare the scalers of FTOF, CTOF, ECAL, etc. from the Scalers GUI to the reference for that current, as posted above). If positions and other detectors do not show any anomalies, keep running. The ADC scalers require at least ~15 nA for a reliable response.
  • Note 16: If ROC mmft1 is 100% busy: power cycle FTT LV (FT->FTT Overview, HV stays ON), roc_reboot mmft1, wait until it reboots (ssh mmft1 to verify). If the first LV recycle/mmft1 reboot doesn’t work call FT expert

Webcams

Manuals

Epics on the web

Fall 2018 Run

fall2018_charge.jpg

Moller rg a fall.jpeg

Spring 2018 Run

chart.jpeg

Moller measurement rg-a.jpg


Clas12design.png