Difference between revisions of "Run Group F"

From clas12-run
Jump to navigation Jump to search
 
(347 intermediate revisions by 10 users not shown)
Line 12: Line 12:
 
'''[https://accwiki.acc.jlab.org/pub/SWDocs/BeamTimeAccounting/Machine_Time_Accounting_User_Guide.pdf Beam Time Accounting User Guide]'''.
 
'''[https://accwiki.acc.jlab.org/pub/SWDocs/BeamTimeAccounting/Machine_Time_Accounting_User_Guide.pdf Beam Time Accounting User Guide]'''.
 
<!-- ===[https://clasweb.jlab.org/wiki/index.php/CLAS12_OPS_Doc#CLAS12_Operations_Documentation Operations Documentation]=== -->
 
<!-- ===[https://clasweb.jlab.org/wiki/index.php/CLAS12_OPS_Doc#CLAS12_Operations_Documentation Operations Documentation]=== -->
 +
===[https://www.jlab.org/Hall-B/run-web/rgf/ESAD_HallB-CLAS12_rgF.pdf ESAD], [https://www.jlab.org/Hall-B/run-web/rgf/COO_HallB-CLAS12_rgF.pdf COO], [https://www.jlab.org/Hall-B/run-web/rgf/RSAD_HallB-CLAS12_rgF.pdf RSAD], [https://www.jlab.org/div_dept/train/SAF111/Hall%20B%20worker%20Safety%20Training%20%28SAF111%29%20%2008%2001-12-1.pdf ERG] ===
 +
===[https://www.jlab.org/Hall-B/run-web/rgf/RTPC_OSP.pdf OSP for Radial Time Projection Chamber]===
 +
===[https://www.jlab.org/Hall-B/run-web/rgf/bonus12_gas_target_osp_97803.pdf OSP for BONUS12 gas target system]===
  
 
| valign=top |
 
| valign=top |
 
===Manuals===
 
===Manuals===
 
* [https://wiki.jlab.org/clas12-run/images/a/ac/BONuS_Target_Gas_System_Manual.pdf Target]
 
* [https://wiki.jlab.org/clas12-run/images/a/ac/BONuS_Target_Gas_System_Manual.pdf Target]
 +
* [https://userweb.jlab.org/~kuhn/BONuS12/Documents/InstructionsRTPCtargetGasFlush.pdf Target filling, purging, and changing instructions]
 
* [https://wiki.jlab.org/clas12-run/images/d/dc/RTPC_Operations_Manual%284%29.pdf BONuS12-RTPC]
 
* [https://wiki.jlab.org/clas12-run/images/d/dc/RTPC_Operations_Manual%284%29.pdf BONuS12-RTPC]
 
* [https://clasweb.jlab.org/wiki/images/c/c2/Band_om.pdf BAND]
 
* [https://clasweb.jlab.org/wiki/images/c/c2/Band_om.pdf BAND]
Line 22: Line 26:
 
* [https://clasweb.jlab.org/wiki/images/0/0f/Ctof_manual.pdf CTOF]
 
* [https://clasweb.jlab.org/wiki/images/0/0f/Ctof_manual.pdf CTOF]
 
* [https://clasweb.jlab.org/wiki/images/a/ab/Opman_master.pdf DAQ]
 
* [https://clasweb.jlab.org/wiki/images/a/ab/Opman_master.pdf DAQ]
* [https://clasweb.jlab.org/wiki/images/b/b2/Drift-chamber-operating-procedure.pdf DC]
+
* [[Media:Drift-chamber-operating-procedure.pdf|DC]]
 
* [https://clasweb.jlab.org/wiki/images/a/a2/Ec_manual.pdf ECAL]
 
* [https://clasweb.jlab.org/wiki/images/a/a2/Ec_manual.pdf ECAL]
 
* [https://clasweb.jlab.org/wiki/images/3/3b/FT-Manual.pdf FT]
 
* [https://clasweb.jlab.org/wiki/images/3/3b/FT-Manual.pdf FT]
Line 62: Line 66:
 
* Mar 18 - Mar 23: Carlos Ayerbe
 
* Mar 18 - Mar 23: Carlos Ayerbe
 
----
 
----
* July 22 - July 28    :
+
* RC & RTPC expert list [https://docs.google.com/spreadsheets/d/1msHlnkpqnHTAgsMAMcI97RNbK919ljRSs9hNiTKnjY0/edit#gid=0]
* July 29 - August 04 :  
+
* 07/31 - 08/04 : Narbe Kalantarian
* August 05 - August 11:
+
* 08/05 - 08/11 : Stephen Bueltmann
* August 12 - August 18:
+
* 08/12 - 08/18 : Carlos Ayerbe Gayoso
* August 19 - August 25:
+
* 08/20 - 08/21 : Mohammad Hattawy
* August 26 - Sep 01   :
+
* 08/22 - 08/25 : Sebastian Kuhn
* Sep 02 - Sep 06      :
+
* 08/26 - 09/01 : Mohammad Hattawy
 +
* 09/02 - 09/08 : Sebastian Kuhn
 +
* 09/09 - 09/15 : Mohammad Hattawy
 +
* 09/16 - 09/21 : (Mohammad Hattawy)
  
  
 
[[Daily Run Group F Coordination Meetings]]
 
[[Daily Run Group F Coordination Meetings]]
 
</font>
 
</font>
 +
Daily at 12:00 pm.
 +
[https://bluejeans.com/7576835804 Bluejeans] = 757 683 5804
 +
 +
 +
'''Daily Ops Meeting (working days 7:45):'''<br>
 +
[https://bluejeans.com/569476853 BlueJeans] = 569 476 853
  
 
|}
 
|}
Line 102: Line 115:
 
= Schedule =
 
= Schedule =
 
<center><font color=blue size=4>
 
<center><font color=blue size=4>
''' CLAS12 Run Group F, Spring 2020 </font> '''<br>
+
''' CLAS12 Run Group F</font> '''<br>
''' Beam energy 10.38 GeV (5 pass) '''<br>
+
''' Part I (Spring 2020): Beam energy 2.18 GeV (1 pass) and10.38 GeV (5 pass) '''<br>
 +
''' Part II (Summer 2020): Beam energy 2.18 GeV (1 pass) and10.38 GeV (5 pass) '''<br>
 
</center>
 
</center>
  
''' Important: Document all your work in the logbook! For every run, make comment at run start and run end (including "ignore" if warranted), enter RELEVANT screen shots *), and take about 20-30 min data with good beam, then post monitoring plots (reset if beam is bad and wait another 20-30 min). Also take screenshot of RTPC in CED at least once per run with beam'''<br>
+
''' Important: Document all your work in the logbook! For every run, make comment at run start and run end (including "ignore" if warranted), enter RELEVANT screen shots *), reset monitoring plots and accumulate monitoring data for about 10-20 min with good beam (on!), then post monitoring plots (reset if beam is bad and wait another 10-20 min). Also take screenshot of RTPC in CED at least once per run with beam'''<br>
  
 
   
 
   
== RC: Carlos Ayerbe Gayoso ([https://userweb.jlab.org/~kuhn/BONuS12/Documents/RGF-RCs.xlsx Full list of RG-F RCs and RTPC experts])==
+
== RC: Mohammad Hattawy ==
* 757-575-7540
+
 
 +
=== RC phone: ===
 +
* 757-575-7540  
 
* 9 757-575-7540 from Counting Room.
 
* 9 757-575-7540 from Counting Room.
 +
* If you can't reach the RC on the RC phone, use the personal phone numbers (Mohammad: (423) 596-8352, Sebastian: (757) 639-6640)
 +
* RC meeting held at 12 pm online.  Bluejeans 757 683 5804
 +
* Get the number of events from SQL --> [http://clasweb.jlab.org/rcdb RCDB]
  
* RC meeting held at 10am in 2nd Floor Counting House.  Bluejeans 757 683 5804
 
 
   
 
   
== PDL: Stepan Stepanyan / Dan Carman ==
+
== PDL: Stepan Stepanyan ==
 
*  (757) 876-1789  
 
*  (757) 876-1789  
 
* 9 876-1789 from Counting Room
 
* 9 876-1789 from Counting Room
  
 
== NEW SHIFT INFORMATION - PLEASE READ ==
 
== NEW SHIFT INFORMATION - PLEASE READ ==
Due to travel restrictions, many of the originally assigned shift takers will not be able to come to Jefferson Lab for their shifts. To deal with this situation, Jefferson Lab leadership has developed a new [https://userweb.jlab.org/~kuhn/BONuS12/Documents/shift-policy_20200317.docx POLICY] that requires only an expert shift taker during Day and Swing shifts (Owl shifts will still be covered by 2 people). There will be remote backup, at least partial presence by the Run Coordinators, and all counting houses have been equipped with a direct camera feed so that shift takers for ANY hall can monitor the counting houses of Hall B and Hall D when only 1 person is present. Shift Experts will carry a cell phone that can be used to call in help. IF YOU ARE ALONE ON SHIFT, you may not go into the Hall - call the relevant experts instead. Shift experts during Day and Swing are expected, in addition to their regular duties, to also check monitoring histograms and CED and log them (as well as standard screen shots) to the logbook, and to respond to any alarms, as well as fill out shift checklists. These new rules take effect on Tuesday, March 24.  
+
Due to travel restrictions, only local people will be able to come to Jefferson Lab for their shifts. To deal with this situation, Jefferson Lab leadership has developed a new [https://userweb.jlab.org/~kuhn/BONuS12/Documents/shift-policy_20200317.docx POLICY] that requires only an expert shift taker during Day and Swing shifts (Owl shifts will still be covered by 2 people). There will be remote backup ("Ghost Shifts") for some of the worker shifts during Day/Swing - '''please read the instructions under the "Remote Shifts" tab and make sure that Bluejeans is properly connected (Screen share and audio)'''. All counting houses have been equipped with a direct camera feed so that shift takers for ANY hall can monitor the counting houses of Hall B and Hall D when only 1 person is present. Shift Experts will carry a cell phone that can be used to call in help. IF YOU ARE ALONE ON SHIFT, you may not go into the Hall - call the relevant experts instead. Shift experts during Day and Swing are expected, in addition to their regular duties, to also check monitoring histograms and CED and log them (as well as standard screen shots) to the logbook, and to respond to any alarms, as well as fill out shift checklists. These new rules take effect on Tuesday, March 24.  
  
Starting immediately, please follow these rules: Keep a distance of 6 ft from all other people inside the counting house. In particular, expert and worker (when both present) should sit 6 feet apart, facing in different directions. In addition, only the RC (at the RC-designated station) and an RTPC expert (either all the way in the corner or at the RTPC gas controls "Reserved" computer) should be inside the counting house B at any time. The RC and the shift expert have the authority to ask non-essential people to leave if overcrowding occurs. In situations where 2 or more people MUST work closer to each other than 6 ft, they should wear TYVEK protective suits and face masks (there are some in the CH).  
+
Starting immediately, please follow these rules: Keep a distance of 6 ft from all other people AT ALL TIMES. In particular, expert and worker (when both present) should sit 6 feet apart, facing in different directions. In addition, only the RC OR an RTPC expert should be inside the counting house B at any time - a maximum room occupancy of THREE has to be obeyed at all times. The RC, PDL and shift expert have the authority to ask non-essential people to leave if overcrowding occurs. Any work that requires 2 people to work in closer proximity than 6' must be first approved.
  
Scheduled shift takers that cannot come to Jefferson Lab will be replaced by local volunteers. Until further notice, we expect the experimental run to continue until May 6, 2020. Obviously, this puts extra burden on many people, and we are grateful especially for those volunteers. Please also read the [https://userweb.jlab.org/~kuhn/BONuS12/Documents/memo_20200317.doc MEMO] by Rolf Ent.
+
At present, we expect the experimental run to continue until '''September 21, 2020'''. Obviously, this puts extra burden on many people, and we are grateful especially for those local volunteers who have signed up for shifts.Please also read the relevant information on COVID-19 and MEDCON5 operations at Jefferson Lab: [https://jlab.servicenowservices.com/cv19?id=cv19_index]
  
== <font color=blue>''' Run Plan'''</font> (see also [https://userweb.jlab.org/~kuhn/BONuS12/Documents/RunPlan.pdf initial run plan]) ==
+
==================================================================================================================================
(Last updated: March 15th, 2020 @ 9:00 )
 
  
===<font color=blue>''Requests''</font>===
 
  
 +
==<font color=red>'''A. Requests'''</font>==
  
 +
===<font color=blue>'' 1. Please end a run whenever the status of the 1/2 waveplate changes''</font>===
 +
MCC should announce any changes, but sometimes they won't do that. The Hall requesting the 1/2 waveplate change should contact us first with a time estimate - at that point, please watch the status of the 1/2 waveplate on the Beam Overview screen and stop the run as soon as it changes.
 +
===<font color=black>There will be an audible Beamline alarm when the half-wave plate (HWP) state changes. Please end the ongoing run and start a new run.</font>===
  
===<font color=blue>''Short Term Schedule''</font> ===
+
===<font color=blue>'' 2. For every run (~15-20 M events)''</font>===
 +
# In the '''begin run dialog''', enter the requested '''beam current''', the '''state of the half-wave plate (IN or OUT)''' and any conditions changed since the last run (target, B-fields, HVs, DAQ config, trigger, ...). In the end run dialog, check boxes ("junk" etc.) and add to the dialog any significant changes during the run.
 +
# *) Near the beginning of the run, submit  the following screenshots (can be all in one elog entry) '''while beam is on'''. Sample plots for reference:
 +
## Beamline overview,
 +
##  DAQvnc (select "statistics" tab) - [https://logbooks.jlab.org/files/2020/08/3819334/clonpc15_20200802_082100.gif] (NOT the default window with all the green ROC terminals),
 +
## CLAS12 VTP Trigger GUI - [https://logbooks.jlab.org/files/2020/08/3819288/clonpc15_20200802_065630.gif] - '''NOT''' the Trigger Alarm GUI! -,
 +
## ROC Busies [https://logbooks.jlab.org/files/2020/08/3819288/clonpc15_20200802_065634.gif],
 +
## RTPC overview [https://logbooks.jlab.org/files/2020/08/3819288/clonpc15_20200802_065636.gif],
 +
## BONuS HV [https://logbooks.jlab.org/files/2020/08/3819288/clonpc15_20200802_065643.gif].
 +
# Run clas12mon over '''at most''' 10-20 min '''with good beam(!)''' (reset first) and submit the occupancy plots (at least '''once''' per run, '''early in the run'''). Whenever you restart clas12mon (and if you haven't checked it yet), '''go to the TriggerBits menu and select "ElectronOr"'''. Compare with previous monitoring plots and the '''[https://clas12mon.jlab.org/mon12/histograms/?reference=3826198 reference WITHOUT FT]''' and make a log entry about any changes you observe. '''Do NOT worry about trigger bits 22 and 31''' - those will be missing. Make sure to reset monitoring plots regularly.
 +
# Take at least one screen shot of RTPC CED with beam per run and post in logbook. De-select "Auto-event" and use Cntrl-N to browse for an event with tracks in it.
  
# Install new RTPC3
+
====<font color=red>''If you change the current, make sure that...''</font>====
# All shifts are canceled until Friday, March 20, Day.
+
#The total trigger rate remains below 2 kHz
 +
# The MVT1 and MVT2 ROCs stay below 5-6% busy
 +
# The deadtime stays below 10%
 +
# The DC occupancy for RI in all 6 sectors stays below 4% (detailed monitoring plots)
 +
# RTPC HV remains stable (no trips).<br/>
  
====<font color=blue>''Overall Program: ''</font>====
+
===<font color=blue>''3. Serious note about setting the trigger rates alarm limits''</font>===
 +
When the data taking conditions are changing (going from one target to another, H2,D2,4He, empty, or changing the beam current or something else)
 +
the shift has to adjust the trigger rates limits that wile be used during new data taking.
 +
The procedure is shown at the pictures:
  
# Install RTPC3 starting Monday 3/16 Day.
+
# Press MENU buttom at the trigger GUI
# Hopefully on Friday 3/20 reestablish beam (including harp scans and beam position scan)
+
# Choose  ALARMS SETTINGS - Expert
# Return to taking production data on D2 (see also below ``Production", trigger file rgf_inbending_v3_4, full D2 target, 240 nA beam).
+
# When the beam is stable press SET ALL NORMALIZED RATE LIMITS
# Cosmic runs when there is no beam: rfg_cosmic_ctof_pcalecal.cnf (but only if a cosmic run expert is available)
+
... You are done.
# Target purge once per day to be done by RC or RTPC expert/personal ('''inform expert first''' and bypass PT interlocks!). At the same time, check all gas bottles.
+
Detailed procedures with pictures can be found here [https://logbooks.jlab.org/entry/3819963]
  
 +
===<font color=blue>''4. PLEASE <font color=red> ''DO NOT IGNORE ANY ALARM ''</font> and follow the guidance for each alarm notification. ''</font>===
 +
'''Exception: Alarms on trigger bits > 14 can be ignored (or the alarm threshold set lower)'''
  
====<font color=blue>''Production: Electron-inbending Configuration, D2/H2/4He target @ 10.4 GeV beam ''</font>====
+
============================================================================================================================================================
<b>DAQ config:PROD66; Trigger file:rgf_inbending_v3_4.trg </b>
+
== <font color=blue>'''B. Run Plan'''</font> (see also [https://userweb.jlab.org/~kuhn/BONuS12/Documents/RunPlan.pdf initial run plan]) ==
  
# Make sure beam blocker is in front of Faraday Cup
+
 
# After a longer beam-off period (assuming no major retuning of the accelerator), no harp scans are necessary. However, follow these steps to bring beam back:
+
* Collect 30M on H2
## Ask for 10 nA. Check that all BPMs are within 0.1 mm of their nominal values.
+
* Call Mohammad to set the target to empty
## Ask for 50 nA. Check BMPs again and ask for orbit locks to be activated.
+
* continue taking data on empty target setting till 7:00AM on Monday, Sep 21st.
## Once orbit locks are running, ask for 240 nA.
+
 
# Ask MCC for 240 nA beam current (NOTE that 2C21A BPM will show 260nA. This is a known issue.)
+
<b>DAQ config:  PROD66 </b>,  
 +
<b>Trigger file: rgf_inbending_v4_2.trg (.cnf)</b>
 +
# Continue taking data with 270 nA beam current (@2C24). '''NOTE:''' This is 280 nA on the SLM, which means we have to ask MCC for 270 nA on 2C24 (which is what they see).
 
# <font color=red> Please write the target pressure and comments in the dialogue box when starting/stopping a run </font>
 
# <font color=red> Please write the target pressure and comments in the dialogue box when starting/stopping a run </font>
 
# Start a run and check that live time is above 85%. If not decrease current and log it.
 
# Start a run and check that live time is above 85%. If not decrease current and log it.
# Restart a new run every <font color=red> 2h </font> OR 10M events. '''END A RUN''' if beam will be off > 10 min, RTPC HV trip, or '''whenever half-wave plate is changed'''!
+
# Restart a new run every (15-20)M events (wait till beam trips). '''END A RUN''' if beam will be off > 20 min, RTPC HV trip, or '''whenever half-wave plate is changed'''!
# Keep BTA (beam time accounting) up to date, including reasons for any entries with experiment not ready
+
# Submit the list of screenshots + clas12mon +ced at the beginning and at after the first 10M events in every run.
# At the beginning of a run  (at least every 2h while beam is on)
+
# Keep BTA (beam time accounting) up to date, including reasons for any entries with experiment not ready.
## *) Submit screenshots for the DAQvnc (select "statistics" tab), CLAS12 VTP Trigger GUI, ROC Busies, Beamline overview, beam strip charts, RTPC overview, BONuS HV from clascss. Do this '''only''' while beam is on!
+
# <b> When checking the ECAL response, make sure to look at the histograms for each sector by using the sector buttons at the bottom of the clas12mon window - if adcecal* or/and adcpcal* ROC crashes, there will be no alarm and the histograms are the way to notice this issue.  
## Run clas12mon over 20-30 min '''with good beam(!)''' and submit the occupancy plots (at least '''once''' per run). Compare with previous monitoring plots and make a log entry about any changes you observe. Make sure to reset monitoring plots regularly.
 
## Take at least one screen shot of RTPC CED with beam per run and post in logbook. De-select "Auto-event" and use Cntrl-N to browse for an event with tracks in it.
 
## <b> When checking the ECAL response, make sure to look at the histograms for each sector by using the sector buttons at the bottom of the clas12mon window - if adcecal* or/and adcpcal* ROC crashes, there will be no alarm and the histograms are the way to notice this issue.  
 
 
#<font color=blue> For trigger alarms check Note 14 first! </font></b>
 
#<font color=blue> For trigger alarms check Note 14 first! </font></b>
  
 +
=== <b><font color=red>* At the end of each run, follow the standard DAQ restart sequence: <br></font></b>===
 +
# -> "end run", "cancel", "reset" <br>
 +
# a. if the run ended correctly: ->  '''"download", "prestart", "go"'''<br>
 +
# b. if the run did not end correctly or if any ROCs had to be rebooted:-> "configure", "download", "prestart", "go"<br>
  
====<font color=blue>''Beam Restoration (last updated Feb 19)''</font>====
+
=== Plan for Monday Morning, Sep 21st ===
<b> Updated Manual is at [https://wiki.jlab.org/clas12-run/images/e/e3/Estab_beam.pdf] </b>
+
# 07:00 : The beam will be taken away for some MCC studies. Gagik, will confirm with MCC that the Hall goes to Controlled Access.
<font color=green>
+
# 07:00 to 8:00: Gagik will call Eugene to ramp down the torus and ramp the solenoid to 1.5T.
 +
# 07:00- 08:00: Gagik can turn off HV on the following detectors ONLY (LTCC, HTCC, DC, RICH, FMT, FTC, FTH)
 +
# 08:00: Gagik leaves the counting house and the BONuS team (Jiwan and Sebastian) will join to do final cosmic tests.
 +
# Before 12:00: the solenoid be totally ramped down. the bonus team will be in contact with Eugene.
 +
# 12:00: The bonus team will turn off HV on ECAL, PCAL, and CND.
 +
# FTOF and CTOF must be left turned ON.  
 +
==================================================================================================================================
  
  
# <b>IF YOU GO DIRECTLY TO FARADAY CUP!!!</b>: Quick beam recovery procedure including Harp Scan
+
== <font color=blue>'''C. References and Standards:'''</font>==
## All HV are off (including FTOF)
 
## Check that 20 mm collimator is in
 
## Call MCC to unmask U/M/D counters but keep BOM masked or get it masked in case it isn't
 
## Call MCC to put 5nA to the FC.
 
## Compare the 2c21, 2c24, 2H01 positions and beam overview screen to the reference below
 
## Put thresholds on U/M/D as 1M/1M/1M and dwell time 50 ms.
 
## follow the procedures for the harp scans at 2H01 [https://wiki.jlab.org/clas12-run/images/9/9f/HarpScanManual.pdf] (optionally at 2C21 and 2C24)
 
## Compare the results with the references scans below (be aware to use the correct analysis counter)
 
## if what you get is similar to the references, call MCC and tell them the the beam is acceptable and set FSD thresholds and dwelltimes as written below and continue with production running (see above)
 
## if what you get isn't similar to the references, do the other harp scans. If you are not sure if a tune of the beam is needed, consult beam line expert and/or RC.
 
  
</font>
+
===* Establish beam in the Hall ( CALL RC )===
 
+
# ALL the detectors must be off. Don't forget the FT and RTPC HV (separate GUIs).
<b><font color=red> At the end of each run, follow the standard DAQ restart sequence ''' <br>
+
# Ask MCC to energize the tagger magnet.  
''(Note, this might be different from the instructions coming up on RunControl.)''
+
# Ask MCC for 5-9 nA and check the beam quality using harp scans 2C21 and 2C24, following the procedures described in [https://wiki.jlab.org/clas12-run/images/e/e3/Estab_beam.pdf]
 
+
# When the beam quality is acceptable, Call MCC and ask for a low-intensity (~5-9 nA) beam to FC, complete harp scans. Procedures described in [https://wiki.jlab.org/clas12-run/images/9/9f/HarpScanManual.pdf]. We require less than 0.3 mm (1σ) beam widths in x and y (As measured by 2H01A harp) and halo below 10^−4 (As measured by 2H01A harp). See references below.
* "end run", "cancel", "reset"
+
# ONLY if instructed by RC: -> Center beam on target, using rates in BOM and downstream beam monitors. Establish range where beam starts directly interacting with target walls and take middle.
* if the run ended correctly:
+
# Engage orbit locks and ascertain that they are stable.
**  '''"download", "prestart", "go"'''
+
# Set alarms and interlocks.
* if the run did not end correctly or if any ROCs had to be rebooted:
+
# Call the MCC and tell them that the beam is good and must keep the beam current at 5 nA.
** "configure", "download", "prestart", "go"
 
</font></b>
 
 
 
== <font color=blue>''' References and Standards:'''</font>==
 
''(last update Mar 21, 2020 @ 9:40 PM.)''
 
  
<b> Restoration of Beam to Hall B</b>
 
  
 
+
<b> Default solenoid current and B field </b> 1800 A (~3.78 T)
<b> Default solenoid current and B field </b> 1935 A (~4.0 T)
 
  
 
<b> Nominal Beam Positions </b>
 
<b> Nominal Beam Positions </b>
*2H01, X: -0.1 mm, Y: -0.4 mm
+
''(last update Sep 10th, 2020 @ 23:50 PM)''
*2C24, X: +0.1 mm, Y: -0.4 mm
+
*2H01, X: +0.7 mm, Y: -1.6 mm
*2C21, X: +0.1 mm, Y: 0.0 mm
+
*2C24, X: -2.0 mm, Y: -1.0 mm
* the acceptable trajectory for the beam before entering the hall must be established while on the tagger dump. The relation between the 2C24 BPM positrons and the X,Y values measured with the tagger harp are:
+
*2C21, X: -0.4 mm, Y: 0.3 mm
**X_harp=36.68-X_2C24
 
**Y_harp=20.97-Y_2C24
 
  
  
<b> FSD Thresholds </b>'''TEMPORARY UNTIL BOM REPARATIONS'''
+
<b> FSD Thresholds </b>
* Upstream: 2000 Hz
+
* Upstream: 2,600 Hz
* Midstream: 2000 Hz
+
* Midstream: 2,000 Hz
* Downstream: 20000 Hz
+
* Downstream: 500,000 Hz
* BOM: 100000
+
* BOM: 7,000 Hz
  
<b> FSD Dwell time </b>
+
<b> FSD Dwell (Integration) Time </b>
 
* Upstream: 5 ms
 
* Upstream: 5 ms
 
* Midstream: 5 ms
 
* Midstream: 5 ms
Line 228: Line 257:
 
<b> BONuS HV setting</b>
 
<b> BONuS HV setting</b>
 
* [https://logbooks.jlab.org/entry/3807043 Reference RTPC currents without beam]
 
* [https://logbooks.jlab.org/entry/3807043 Reference RTPC currents without beam]
* [https://logbooks.jlab.org/entry/3807062 Final reference RTPC HV and currents with beam]
+
* [https://logbooks.jlab.org/files/2020/08/3838353/clonpc15_20200831_082242.gif Final reference RTPC HV and currents with beam (240 nA)]
  
<b> Reference Harp Scans for Beam on Tagger Dump: </b> 2C21 [https://logbooks.jlab.org/entry/3791951], 2C24 [https://logbooks.jlab.org/entry/3791964]
+
*<b> Reference Harp Scans for Beam on Tagger Dump: </b> 2C21 [https://logbooks.jlab.org/entry/3825429], 2C24 [https://logbooks.jlab.org/entry/3838463]
 
+
*<b> Reference Harp Scans for Beam on Faraday Cup: </b> 2C21 [https://logbooks.jlab.org/entry/3825493], 2C24 [https://logbooks.jlab.org/entry/3837237][https://logbooks.jlab.org/entry/3837238], 2H01 [https://logbooks.jlab.org/entry/3837231].
<b> Reference Harp Scans for Beam on Faraday Cup: </b> 2H01 [https://logbooks.jlab.org/entry/3786885], [https://logbooks.jlab.org/entry/3787469], 2C21 [https://logbooks.jlab.org/entry/3786867], 2C24 [https://logbooks.jlab.org/entry/3786872]
 
  
 
<b> Reference Monitoring Histograms</b> 5 nA production trigger [https://logbooks.jlab.org/entry/3783929]
 
<b> Reference Monitoring Histograms</b> 5 nA production trigger [https://logbooks.jlab.org/entry/3783929]
Line 242: Line 270:
 
* Well-tuned beam on Tagger Dump at 5 nA during harp scans: [https://logbooks.jlab.org/entry/3791966]  
 
* Well-tuned beam on Tagger Dump at 5 nA during harp scans: [https://logbooks.jlab.org/entry/3791966]  
  
==<font color=blue>''' General Instructions''':</font>==
+
 
 +
==================================================================================================================================
 +
 
 +
 
 +
==<font color=blue>''' D. Beam Restoration after major retuning'''</font>==
 +
<b> Updated Manual is at [https://wiki.jlab.org/clas12-run/images/e/e3/Estab_beam.pdf] </b>
 +
<font color=green>
 +
 
 +
 
 +
 
 +
</font>
 +
 
 +
==================================================================================================================================
 +
 
 +
==<font color=blue>'''F. General Instructions''':</font>==
 
   
 
   
  
 
* The main lights in the Hall (dome lights) and the Forward Carriage lights are being kept off because of light leaks affecting some of the detectors. If these lights are switched on during an access, they should be switched off when leaving the Hall. Note that the dome lights when switched off cannot be turned back on immediately because they require 10-15 min to cooldown.
 
* The main lights in the Hall (dome lights) and the Forward Carriage lights are being kept off because of light leaks affecting some of the detectors. If these lights are switched on during an access, they should be switched off when leaving the Hall. Note that the dome lights when switched off cannot be turned back on immediately because they require 10-15 min to cooldown.
 
* <font color=blue> Get familiar with the shift crew responsibilities for the RTPC (see manual [https://wiki.jlab.org/clas12-run/images/d/dc/RTPC_Operations_Manual%284%29.pdf]). Especially on how to switch on the HV after a trip. </font>
 
* <font color=blue> Get familiar with the shift crew responsibilities for the RTPC (see manual [https://wiki.jlab.org/clas12-run/images/d/dc/RTPC_Operations_Manual%284%29.pdf]). Especially on how to switch on the HV after a trip. </font>
* Do not run more than 30 minutes above 30 nA with 5-pass beam without the beam blocker in front of Faraday cup. Put beam blocker in for long running at high currents for 5 pass operations.
+
* Do not run more than 30 minutes above 30 nA with 5-pass beam without the beam blocker in front of Faraday cup. Put beam blocker in for long running at high currents for 5 pass operations
 
* Turn DC HV off only for beam tuning; if no beam is available or when beam is stable, keep them on even if you are not taking data.
 
* Turn DC HV off only for beam tuning; if no beam is available or when beam is stable, keep them on even if you are not taking data.
 
* With any issue contact On-Call Experts or RC - do not spend more than 15-20 min trying to fix the problem.
 
* With any issue contact On-Call Experts or RC - do not spend more than 15-20 min trying to fix the problem.
Line 289: Line 331:
 
*'''Note 6: Reset CLAS12MON frequently to avoid histogram saturation. If CLAS12MON is restarted change MAX scale to 10 (default is 5) for DC normalized occupncy histograms. This would prevent them from saturation. See log entry [https://logbooks.jlab.org/entry/3667416]'''
 
*'''Note 6: Reset CLAS12MON frequently to avoid histogram saturation. If CLAS12MON is restarted change MAX scale to 10 (default is 5) for DC normalized occupncy histograms. This would prevent them from saturation. See log entry [https://logbooks.jlab.org/entry/3667416]'''
  
*'''Note 7: Shift workers must check the occupancies! Use this tool to compare to previous runs: [https://clas12mon.jlab.org/mon12/histograms/?reference=3650729]'''
+
*'''Note 7: Shift workers must check the occupancies! Here is the standard sets of monitoring histograms [https://clas12mon.jlab.org/mon12/histograms/?reference=3826198 WITHOUT the FT]. Between August 13 and August 18 7 a.m., please use  [https://clas12mon.jlab.org/mon12/histograms/?reference=3826733 THIS link for the proper reference WITH FT].
<!--[https://clas12mon.jlab.org/mon12/histograms/?reference=3621580]'''-->
 
  
 
*'''Note 8: Check the vacuum periodically, make sure vacuum is not higher than 5e-5 '''
 
*'''Note 8: Check the vacuum periodically, make sure vacuum is not higher than 5e-5 '''
Line 371: Line 412:
 
* [http://clasweb.jlab.org/rcdb RCDB]
 
* [http://clasweb.jlab.org/rcdb RCDB]
  
===Run lists===
 
 
| valign=top |
 
| valign=top |
 
===Accelerator===
 
===Accelerator===
Line 379: Line 419:
 
* [https://www.evernote.com/pub/maureeungaro/pdldaily Accelerator daily meetings notes (by Mauri)]
 
* [https://www.evernote.com/pub/maureeungaro/pdldaily Accelerator daily meetings notes (by Mauri)]
 
| valign=top |
 
| valign=top |
===Bluejeans meetings===
+
 
* [https://bluejeans.com/7576835804 Daily Run meetings] 10:00 a.m. Upstairs Counting House / Bluejeans 757 683 5804
 
 
|}
 
|}
  
 
= Remote Shifts =
 
= Remote Shifts =
* Bluejeans
+
[https://jeffersonlab-my.sharepoint.com/:x:/g/personal/baltzell_jlab_org/Ea4w15MIDeRDp5C9fRWE31gBwCftmDQu5KTh1cV6pxbcMQ?e=vx5RlI Remote Shift Schedule and Signup]
** [https://bluejeans.com/950041022 https://bluejeans.com/950041022]
+
=== Bluejeans ===
** Or, on a clonpc## as user=clasrun in a terminal, run "<tt>bluejeans</tt>"
+
* Permanent connection for communication and screen sharing between remote and local shift workers.
* WebOPI (requires CUE login)
+
* [https://bluejeans.com/950041022 https://bluejeans.com/950041022]
** [https://hallbopi.jlab.org/webopi3.3/w?opi=beamline/clas12-web.opi Beamline Overview]
+
* Or, on a clonpc## as user=clasrun, in a terminal run "<tt>bluejeans</tt>"
* Strip Charts (requires CUE login)
+
* For audio in the counting house, for now we can use one of the rarely-used phones.
** Work in progress ...
+
=== WebOPI ===
** [https://epicsweb.jlab.org/wave/?myaDeployment=ops&myaLimit=100000&windowMinutes=30&title=Upstream+and+Midstream+Halo+Counters&fullscreen=false&layoutMode=2&viewerMode=2&pv=scaler_cS3b&pv=scaler_cS4b&scaler_cS3blabel=scaler_cS3b&scaler_cS3bcolor=%23a6cee3&scaler_cS3byAxisLabel=Rate++%28Hz%29&scaler_cS3byAxisMin=&scaler_cS3byAxisMax=&scaler_cS3byAxisLog&scaler_cS3bscaler=&pv=scaler_cS5b&pv=scaler_cS6b&pv=scaler_cS7b&pv=scaler_cS12b&pv=scaler_cS13b&pv=scaler_cS14b&pv=scaler_cS15b Upstream/Midstream Halo Counters]
+
* Requires CUE login
** [https://epicsweb.jlab.org/wave/?myaDeployment=ops&myaLimit=100000&windowMinutes=30&title=Downstream+Halo+Counters&fullscreen=false&layoutMode=2&viewerMode=2&pv=scalerS8b&pv=scalerS9b&scalerS8blabel=scalerS8b&scalerS8bcolor=%23a6cee3&scalerS8byAxisLabel=Rate++%28Hz%29&scalerS8byAxisMin=&scalerS8byAxisMax=&scalerS8byAxisLog&scalerS8bscaler=&pv=scalerS10b&pv=scalerS11b&scalerS9blabel=scalerS9b&scalerS9bcolor=%231f78b4&scalerS9byAxisLabel=&scalerS9byAxisMin=&scalerS9byAxisMax=&scalerS9byAxisLog=&scalerS9bscaler=&scalerS10blabel=scalerS10b&scalerS10bcolor=%23b2df8a&scalerS10byAxisLabel=&scalerS10byAxisMin=&scalerS10byAxisMax=&scalerS10byAxisLog=&scalerS10bscaler=&scalerS11blabel=scalerS11b&scalerS11bcolor=%2333a02c&scalerS11byAxisLabel=&scalerS11byAxisMin=&scalerS11byAxisMax=&scalerS11byAxisLog=&scalerS11bscaler= Downstream Halo Counters]
+
* [https://hallbopi.jlab.org/webopi3.3/w?opi=beamline/clas12-web.opi Beamline Overview]
** [https://epicsweb.jlab.org/wave/?start=2020-07-08+16%3A50%3A02&end=2020-07-08+16%3A55%3A02&myaDeployment=ops&myaLimit=100000&windowMinutes=30&title=Beam+Currents&fullscreen=false&layoutMode=2&viewerMode=2&pv=IPM2C21A&pv=IPM2C24A&pv=scaler_calc1b&IPM2C21Alabel=IPM2C21A&IPM2C21Acolor=%23a6cee3&IPM2C21AyAxisLabel=Beam+Current+%28nA%29&IPM2C21AyAxisMin=0&IPM2C21AyAxisMax=150&IPM2C21AyAxisLog&IPM2C21Ascaler=&scaler_calc1blabel=Faraday+Cup&scaler_calc1bcolor=%23b2df8a&scaler_calc1byAxisLabel=&scaler_calc1byAxisMin=&scaler_calc1byAxisMax=&scaler_calc1byAxisLog&scaler_calc1bscaler= Beam Currents]
+
* [https://hallbopi.jlab.org/webopi3.3/w?opi=https://hallbopi.jlab.org/opis/detectors/BONUS/bonus.opi BONuS RTPC Overview]
** [https://epicsweb.jlab.org/wave empty]
+
=== Strip Charts ===
* [https://clas12mon.jlab.org/mon12/histograms/?reference=3630375 Monitoring Histograms] (reference needs updating by RC)
+
* Requires CUE login
 +
<!--* [https://epicsweb.jlab.org/wave/?myaDeployment=ops&myaLimit=100000&windowMinutes=30&title=Upstream+and+Midstream+Halo+Counters&fullscreen=false&layoutMode=2&viewerMode=2&pv=scaler_cS3b&pv=scaler_cS4b&scaler_cS3blabel=scaler_cS3b&scaler_cS3bcolor=%23a6cee3&scaler_cS3byAxisLabel=Rate++%28Hz%29&scaler_cS3byAxisMin=&scaler_cS3byAxisMax=&scaler_cS3byAxisLog&scaler_cS3bscaler=&pv=scaler_cS5b&pv=scaler_cS6b&pv=scaler_cS7b&pv=scaler_cS12b&pv=scaler_cS13b&pv=scaler_cS14b&pv=scaler_cS15b Upstream/Midstream Halo Counters]-->
 +
* [https://epicsweb.jlab.org/wave/?myaDeployment=ops&myaLimit=100000&windowMinutes=30&title=Upstream+and+Midstream+Halo+Counters&fullscreen=false&layoutMode=2&viewerMode=2&pv=scaler_cS3b&pv=scaler_cS4b&pv=scaler_cS6b&pv=scaler_cS12b&pv=scaler_cS13b&pv=scaler_cS14b&pv=scaler_cS15b&scaler_cS3blabel=scaler_cS3b&scaler_cS3bcolor=%23a6cee3&scaler_cS3byAxisLabel=Rate++%28Hz%29&scaler_cS3byAxisMin=&scaler_cS3byAxisMax=&scaler_cS3byAxisLog&scaler_cS3bscaler=&start=2020-08-08+09%3A02%3A36&end=2020-08-08+09%3A07%3A36&scaler_cS4blabel=scaler_cS4b&scaler_cS4bcolor=%231f78b4&scaler_cS4byAxisLabel=&scaler_cS4byAxisMin=&scaler_cS4byAxisMax=&scaler_cS4byAxisLog=&scaler_cS4bscaler=&scaler_cS5byAxisLabel=&scaler_cS5byAxisMin=&scaler_cS5byAxisMax=&scaler_cS5byAxisLog=&scaler_cS5bscaler=&scaler_cS6blabel=scaler_cS6b&scaler_cS6bcolor=%2333a02c&scaler_cS6byAxisLabel=&scaler_cS6byAxisMin=&scaler_cS6byAxisMax=&scaler_cS6byAxisLog=&scaler_cS6bscaler=&scaler_cS7byAxisLabel=&scaler_cS7byAxisMin=&scaler_cS7byAxisMax=&scaler_cS7byAxisLog=&scaler_cS7bscaler=&scaler_cS12blabel=scaler_cS12b&scaler_cS12bcolor=%23e31a1c&scaler_cS12byAxisLabel=&scaler_cS12byAxisMin=&scaler_cS12byAxisMax=&scaler_cS12byAxisLog=&scaler_cS12bscaler=&scaler_cS13blabel=scaler_cS13b&scaler_cS13bcolor=%23fdbf6f&scaler_cS13byAxisLabel=&scaler_cS13byAxisMin=&scaler_cS13byAxisMax=&scaler_cS13byAxisLog=&scaler_cS13bscaler=&scaler_cS14blabel=scaler_cS14b&scaler_cS14bcolor=%23ff7f00&scaler_cS14byAxisLabel=&scaler_cS14byAxisMin=&scaler_cS14byAxisMax=&scaler_cS14byAxisLog=&scaler_cS14bscaler=&scaler_cS15blabel=scaler_cS15b&scaler_cS15bcolor=%23cab2d6&scaler_cS15byAxisLabel=&scaler_cS15byAxisMin=&scaler_cS15byAxisMax=&scaler_cS15byAxisLog=&scaler_cS15bscaler= Upstream/Midstream Halo Counters]
 +
* [https://epicsweb.jlab.org/wave/?myaDeployment=ops&myaLimit=100000&windowMinutes=30&title=Downstream+Halo+Counters&fullscreen=false&layoutMode=2&viewerMode=2&pv=scalerS8b&pv=scalerS9b&scalerS8blabel=scalerS8b&scalerS8bcolor=%23a6cee3&scalerS8byAxisLabel=Rate++%28Hz%29&scalerS8byAxisMin=&scalerS8byAxisMax=&scalerS8byAxisLog&scalerS8bscaler=&pv=scalerS10b&pv=scalerS11b&scalerS9blabel=scalerS9b&scalerS9bcolor=%231f78b4&scalerS9byAxisLabel=&scalerS9byAxisMin=&scalerS9byAxisMax=&scalerS9byAxisLog=&scalerS9bscaler=&scalerS10blabel=scalerS10b&scalerS10bcolor=%23b2df8a&scalerS10byAxisLabel=&scalerS10byAxisMin=&scalerS10byAxisMax=&scalerS10byAxisLog=&scalerS10bscaler=&scalerS11blabel=scalerS11b&scalerS11bcolor=%2333a02c&scalerS11byAxisLabel=&scalerS11byAxisMin=&scalerS11byAxisMax=&scalerS11byAxisLog=&scalerS11bscaler= Downstream Halo Counters]
 +
* [https://epicsweb.jlab.org/wave/?start=2020-07-08+16%3A50%3A02&end=2020-07-08+16%3A55%3A02&myaDeployment=ops&myaLimit=100000&windowMinutes=30&title=Beam+Currents&fullscreen=false&layoutMode=2&viewerMode=2&pv=IPM2C21A&pv=IPM2C24A&pv=scaler_calc1b&IPM2C21Alabel=IPM2C21A&IPM2C21Acolor=%23a6cee3&IPM2C21AyAxisLabel=Beam+Current+%28nA%29&IPM2C21AyAxisMin=0&IPM2C21AyAxisMax=300&IPM2C21AyAxisLog&IPM2C21Ascaler=&scaler_calc1blabel=Faraday+Cup&scaler_calc1bcolor=%23b2df8a&scaler_calc1byAxisLabel=&scaler_calc1byAxisMin=&scaler_calc1byAxisMax=&scaler_calc1byAxisLog&scaler_calc1bscaler= Beam Currents]
 +
* [https://epicsweb.jlab.org/wave/?start=2020-08-03+12%3A30%3A57&end=2020-08-03+12%3A35%3A57&myaDeployment=ops&myaLimit=100000&windowMinutes=30&title=BPM+Positions+%28Y-Axis+is+mean+%2B%2F-+0.5+mm%29&fullscreen=false&layoutMode=3&viewerMode=2&pv=IPM2C24A.XPOS&pv=IPM2C24A.YPOS&pv=IPM2H01.XPOS&pv=IPM2H01.YPOS&IPM2C24A.XPOSlabel=IPM2C24A.XPOS&IPM2C24A.XPOScolor=%23e31a1c&IPM2C24A.XPOSyAxisLabel=&IPM2C24A.XPOSyAxisMin=-2.0&IPM2C24A.XPOSyAxisMax=+1.0&IPM2C24A.XPOSyAxisLog&IPM2C24A.XPOSscaler=&IPM2C24A.YPOSlabel=IPM2C24A.YPOS&IPM2C24A.YPOScolor=pink&IPM2C24A.YPOSyAxisLabel=&IPM2C24A.YPOSyAxisMin=-2.0&IPM2C24A.YPOSyAxisMax=1.0&IPM2C24A.YPOSyAxisLog&IPM2C24A.YPOSscaler=&IPM2H01.XPOSlabel=IPM2H01.XPOS&IPM2H01.XPOScolor=darkgreen&IPM2H01.XPOSyAxisLabel=&IPM2H01.XPOSyAxisMin=-2.0&IPM2H01.XPOSyAxisMax=1.0&IPM2H01.XPOSyAxisLog&IPM2H01.XPOSscaler=&IPM2H01.YPOSlabel=IPM2H01.YPOS&IPM2H01.YPOScolor=lightgreen&IPM2H01.YPOSyAxisLabel=&IPM2H01.YPOSyAxisMin=-2.0&IPM2H01.YPOSyAxisMax=1.0&IPM2H01.YPOSyAxisLog&IPM2H01.YPOSscaler=#a6cee3&IPM2C24A.XPOSyAxisLabel=2C24+X+(mm)&IPM2C24A.XPOSyAxisMin=-1.5&IPM2C24A.XPOSyAxisMax=-0.5&IPM2C24A.XPOSyAxisLog&IPM2C24A.XPOSscaler=&IPM2C24A.YPOSlabel=IPM2C24A.YPOS&IPM2C24A.YPOScolor=%231f78b4&IPM2C24A.YPOSyAxisLabel=2C24+Y+(mm)&IPM2C24A.YPOSyAxisMin=0.3&IPM2C24A.YPOSyAxisMax=1.3&IPM2C24A.YPOSyAxisLog&IPM2C24A.YPOSscaler=&IPM2H01.XPOSlabel=IPM2H01.XPOS&IPM2H01.XPOScolor=pink&IPM2H01.XPOSyAxisLabel=2H01+X+(mm)&IPM2H01.XPOSyAxisMin=-0.6&IPM2H01.XPOSyAxisMax=0.4&IPM2H01.XPOSyAxisLog&IPM2H01.XPOSscaler=&IPM2H01.YPOSlabel=IPM2H01.YPOS&IPM2H01.YPOScolor=darkred&IPM2H01.YPOSyAxisLabel=2H01+Y+(mm)&IPM2H01.YPOSyAxisMin=0.4&IPM2H01.YPOSyAxisMax=1.4&IPM2H01.YPOSyAxisLog&IPM2H01.YPOSscaler= BPM Positions]
 +
** Note: All BPM axes now go from -2.0 to +1.0 mm
 +
* [https://epicsweb.jlab.org/wave empty]
 +
=== Monitoring Histograms ===
 +
* Changing the reference run/logentry requires updating the URL by the Run Coordinator
 +
* [https://clas12mon.jlab.org/mon12/histograms/?reference=3826198 Reference, current, and 5 most recent runs] for runs WITHOUT the FT.
 +
* For runs WITH the FT (August 13 - August 18 7 a.m), please use the following link: [https://clas12mon.jlab.org/mon12/histograms/ FT ON]
  
 +
=== For Shift Expert ===
 +
* Bluejeans is running on clonpc14 - DO NOT CLOSE THE SESSION
 +
* The bluejeans session should always share the screen, it is the lower monitor of clonpc14. The alarm handler must be displayed on that monitor to allow remote shifter to keep eye on it.
 +
* Audio for the bluejeans session goes through the phone, 269-5247. This is the phone attached on the second row of tables (former RC station), behind the shift expert station.
 +
** DO NOT HANG UP or MUTE the phone, if you have to mute then do not forget to unmute. 
 +
** CHECK AT THE BEGINNING OF EACH SHIFT: About every 6 hours the bluejeans will disconnect the phone if this happens, use the microphone tab in the bluejeans window and choose "Switch to phone audio" then select "Call me" and give the phone number, 757 269 5247. Once you are connected, you have to press "'''*4'''" on the phone to unmute yourself.
  
 
<headertabs/>
 
<headertabs/>

Latest revision as of 13:49, 25 July 2024

[edit]

Shift Schedule

Shift Checklist

Hot Checkout

Beam Time Accounting

  • See guidance for BTA in

Beam Time Accounting User Guide.

ESAD, COO, RSAD, ERG

OSP for Radial Time Projection Chamber

OSP for BONUS12 gas target system

Manuals

Procedures

JLab Logbooks


RC schedule Weekly form

  • Feb 12 - Feb 18: Mohammad Hattawy
  • Feb 19 - Feb 25: Florian Hauenstein
  • Feb 26 - Mar 3: Eric Christy
  • Mar 4 - Mar 19: Sebastian Kuhn
  • Mar 18 - Mar 23: Carlos Ayerbe

  • RC & RTPC expert list [1]
  • 07/31 - 08/04 : Narbe Kalantarian
  • 08/05 - 08/11 : Stephen Bueltmann
  • 08/12 - 08/18 : Carlos Ayerbe Gayoso
  • 08/20 - 08/21 : Mohammad Hattawy
  • 08/22 - 08/25 : Sebastian Kuhn
  • 08/26 - 09/01 : Mohammad Hattawy
  • 09/02 - 09/08 : Sebastian Kuhn
  • 09/09 - 09/15 : Mohammad Hattawy
  • 09/16 - 09/21 : (Mohammad Hattawy)


Daily Run Group F Coordination Meetings Daily at 12:00 pm. Bluejeans = 757 683 5804


Daily Ops Meeting (working days 7:45):
BlueJeans = 569 476 853

If calling local numbers (with area code prefix 757) from the counting room dial 9+[last 7 digits]. To call other area codes dial 91+[10 digit number]

Role Phone Number
Hall B Run Coordinator (757) 575-7540 (cell)
Hall B Physics Division Liaison (757) 876-1789 (cell)
MCC 7048
Crew Chief 7045
Crew Chief (757) 876-3367 (cell)
Program Deputy (757) 876-7997 (cell)
RadCon (757) 876-1743 (cell)
Gate House Guard 5822
Location Phone Number
Hall B Floor 5165
Hall B Space Frame 5170 and 5171
Hall B Forward Carriage 5371
Hall B Gas Shed 7115
Hall B Counting House 5244 (Shift Expert)
Hall B Counting House (757) 329-4846 (Shift Expert cell)
Hall B Counting House 5245 or 5126 (Shift Worker)
Hall A Counting House 5501
Hall C Counting House 6000
Hall D Counting House 5504
Hall B System Phone Number On-Call Person
Engineering (757) 748-5048 (cell)
(757) 897-9060 (cell)
Engineering On-Call (primary)
Denny Insley (secondary)
Slow Controls (757) 748-6922 (cell) Nathan Baltzell
Beamline (757) 303-3996 (cell) Eugene Pasyuk
DC (757) 218-4372 (cell)
(757) 748-5048 (cell)
Florian Hauenstein (primary)
Engineering On-Call (secondary)
SVT/MVT/MM (757) 541-7539 (cell)
(757) 753-7769 (cell)
Yuri Gotra (primary)
Rafo Paremuzyan (secondary)
ECAL (757) 810-1489 (cell) Cole Smith
FTOF/CTOF/CND (757) 344-7204 (cell) Daniel Carman
ALERT (757) 329-4844 (cell) Raphael Dupré
HTCC/LTCC (757) 344-7174 (cell) Youri Sharabian
FT (757) 344-1848 (cell) Raffaella De Vita
BAND (757) 310-7198 (cell) Florian Hauenstein
RICH (757) 344-3235 (cell)
(757) 748-6922 (cell)
Christopher Dilks (primary)
Nathan Baltzell (secondary)
DAQ (757) 232-6221 (cell) Sergey Boiarinov
HYDRA (317) 550-9226 (cell) Torri Jeske
Authorized Hall B Solenoid/Torus Operators
Hall B Denny Insley, Morgan Cook, Eugene Pasyuk
Magnet Group Probir Ghosha, Renuka Rajput-Ghoshal
Detector Support Group Brian Eng, Pablo Campero, Tyler Lemon
DC Power Onish Kumar, Sarin Philip
  • Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
  • To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
  • Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.

Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.


In case you need to call in any electronics help, call in the following order

Person Phone Number
Chris Cuevas (757) 865-0461
Mark Taylor (757) 846-7322
Armen Stepayan (757) 814-5622



CLAS12 Run Group F
Part I (Spring 2020): Beam energy 2.18 GeV (1 pass) and10.38 GeV (5 pass)
Part II (Summer 2020): Beam energy 2.18 GeV (1 pass) and10.38 GeV (5 pass)

Important: Document all your work in the logbook! For every run, make comment at run start and run end (including "ignore" if warranted), enter RELEVANT screen shots *), reset monitoring plots and accumulate monitoring data for about 10-20 min with good beam (on!), then post monitoring plots (reset if beam is bad and wait another 10-20 min). Also take screenshot of RTPC in CED at least once per run with beam


RC: Mohammad Hattawy

RC phone:

  • 757-575-7540
  • 9 757-575-7540 from Counting Room.
  • If you can't reach the RC on the RC phone, use the personal phone numbers (Mohammad: (423) 596-8352, Sebastian: (757) 639-6640)
  • RC meeting held at 12 pm online. Bluejeans 757 683 5804
  • Get the number of events from SQL --> RCDB


PDL: Stepan Stepanyan

  • (757) 876-1789
  • 9 876-1789 from Counting Room

NEW SHIFT INFORMATION - PLEASE READ

Due to travel restrictions, only local people will be able to come to Jefferson Lab for their shifts. To deal with this situation, Jefferson Lab leadership has developed a new POLICY that requires only an expert shift taker during Day and Swing shifts (Owl shifts will still be covered by 2 people). There will be remote backup ("Ghost Shifts") for some of the worker shifts during Day/Swing - please read the instructions under the "Remote Shifts" tab and make sure that Bluejeans is properly connected (Screen share and audio). All counting houses have been equipped with a direct camera feed so that shift takers for ANY hall can monitor the counting houses of Hall B and Hall D when only 1 person is present. Shift Experts will carry a cell phone that can be used to call in help. IF YOU ARE ALONE ON SHIFT, you may not go into the Hall - call the relevant experts instead. Shift experts during Day and Swing are expected, in addition to their regular duties, to also check monitoring histograms and CED and log them (as well as standard screen shots) to the logbook, and to respond to any alarms, as well as fill out shift checklists. These new rules take effect on Tuesday, March 24.

Starting immediately, please follow these rules: Keep a distance of 6 ft from all other people AT ALL TIMES. In particular, expert and worker (when both present) should sit 6 feet apart, facing in different directions. In addition, only the RC OR an RTPC expert should be inside the counting house B at any time - a maximum room occupancy of THREE has to be obeyed at all times. The RC, PDL and shift expert have the authority to ask non-essential people to leave if overcrowding occurs. Any work that requires 2 people to work in closer proximity than 6' must be first approved.

At present, we expect the experimental run to continue until September 21, 2020. Obviously, this puts extra burden on many people, and we are grateful especially for those local volunteers who have signed up for shifts.Please also read the relevant information on COVID-19 and MEDCON5 operations at Jefferson Lab: [2]

======================================================================================================================

A. Requests

1. Please end a run whenever the status of the 1/2 waveplate changes

MCC should announce any changes, but sometimes they won't do that. The Hall requesting the 1/2 waveplate change should contact us first with a time estimate - at that point, please watch the status of the 1/2 waveplate on the Beam Overview screen and stop the run as soon as it changes.

There will be an audible Beamline alarm when the half-wave plate (HWP) state changes. Please end the ongoing run and start a new run.

2. For every run (~15-20 M events)

  1. In the begin run dialog, enter the requested beam current, the state of the half-wave plate (IN or OUT) and any conditions changed since the last run (target, B-fields, HVs, DAQ config, trigger, ...). In the end run dialog, check boxes ("junk" etc.) and add to the dialog any significant changes during the run.
  2. *) Near the beginning of the run, submit the following screenshots (can be all in one elog entry) while beam is on. Sample plots for reference:
    1. Beamline overview,
    2. DAQvnc (select "statistics" tab) - [3] (NOT the default window with all the green ROC terminals),
    3. CLAS12 VTP Trigger GUI - [4] - NOT the Trigger Alarm GUI! -,
    4. ROC Busies [5],
    5. RTPC overview [6],
    6. BONuS HV [7].
  3. Run clas12mon over at most 10-20 min with good beam(!) (reset first) and submit the occupancy plots (at least once per run, early in the run). Whenever you restart clas12mon (and if you haven't checked it yet), go to the TriggerBits menu and select "ElectronOr". Compare with previous monitoring plots and the reference WITHOUT FT and make a log entry about any changes you observe. Do NOT worry about trigger bits 22 and 31 - those will be missing. Make sure to reset monitoring plots regularly.
  4. Take at least one screen shot of RTPC CED with beam per run and post in logbook. De-select "Auto-event" and use Cntrl-N to browse for an event with tracks in it.

If you change the current, make sure that...

  1. The total trigger rate remains below 2 kHz
  2. The MVT1 and MVT2 ROCs stay below 5-6% busy
  3. The deadtime stays below 10%
  4. The DC occupancy for RI in all 6 sectors stays below 4% (detailed monitoring plots)
  5. RTPC HV remains stable (no trips).

3. Serious note about setting the trigger rates alarm limits

When the data taking conditions are changing (going from one target to another, H2,D2,4He, empty, or changing the beam current or something else) the shift has to adjust the trigger rates limits that wile be used during new data taking. The procedure is shown at the pictures:

  1. Press MENU buttom at the trigger GUI
  2. Choose ALARMS SETTINGS - Expert
  3. When the beam is stable press SET ALL NORMALIZED RATE LIMITS

... You are done. Detailed procedures with pictures can be found here [8]

4. PLEASE DO NOT IGNORE ANY ALARM and follow the guidance for each alarm notification.

Exception: Alarms on trigger bits > 14 can be ignored (or the alarm threshold set lower)

================================================================================================================================================

B. Run Plan (see also initial run plan)

  • Collect 30M on H2
  • Call Mohammad to set the target to empty
  • continue taking data on empty target setting till 7:00AM on Monday, Sep 21st.

DAQ config: PROD66 , Trigger file: rgf_inbending_v4_2.trg (.cnf)

  1. Continue taking data with 270 nA beam current (@2C24). NOTE: This is 280 nA on the SLM, which means we have to ask MCC for 270 nA on 2C24 (which is what they see).
  2. Please write the target pressure and comments in the dialogue box when starting/stopping a run
  3. Start a run and check that live time is above 85%. If not decrease current and log it.
  4. Restart a new run every (15-20)M events (wait till beam trips). END A RUN if beam will be off > 20 min, RTPC HV trip, or whenever half-wave plate is changed!
  5. Submit the list of screenshots + clas12mon +ced at the beginning and at after the first 10M events in every run.
  6. Keep BTA (beam time accounting) up to date, including reasons for any entries with experiment not ready.
  7. When checking the ECAL response, make sure to look at the histograms for each sector by using the sector buttons at the bottom of the clas12mon window - if adcecal* or/and adcpcal* ROC crashes, there will be no alarm and the histograms are the way to notice this issue.
  8. For trigger alarms check Note 14 first!

* At the end of each run, follow the standard DAQ restart sequence:

  1. -> "end run", "cancel", "reset"
  2. a. if the run ended correctly: -> "download", "prestart", "go"
  3. b. if the run did not end correctly or if any ROCs had to be rebooted:-> "configure", "download", "prestart", "go"

Plan for Monday Morning, Sep 21st

  1. 07:00 : The beam will be taken away for some MCC studies. Gagik, will confirm with MCC that the Hall goes to Controlled Access.
  2. 07:00 to 8:00: Gagik will call Eugene to ramp down the torus and ramp the solenoid to 1.5T.
  3. 07:00- 08:00: Gagik can turn off HV on the following detectors ONLY (LTCC, HTCC, DC, RICH, FMT, FTC, FTH)
  4. 08:00: Gagik leaves the counting house and the BONuS team (Jiwan and Sebastian) will join to do final cosmic tests.
  5. Before 12:00: the solenoid be totally ramped down. the bonus team will be in contact with Eugene.
  6. 12:00: The bonus team will turn off HV on ECAL, PCAL, and CND.
  7. FTOF and CTOF must be left turned ON.
======================================================================================================================

C. References and Standards:

* Establish beam in the Hall ( CALL RC )

  1. ALL the detectors must be off. Don't forget the FT and RTPC HV (separate GUIs).
  2. Ask MCC to energize the tagger magnet.
  3. Ask MCC for 5-9 nA and check the beam quality using harp scans 2C21 and 2C24, following the procedures described in [9]
  4. When the beam quality is acceptable, Call MCC and ask for a low-intensity (~5-9 nA) beam to FC, complete harp scans. Procedures described in [10]. We require less than 0.3 mm (1σ) beam widths in x and y (As measured by 2H01A harp) and halo below 10^−4 (As measured by 2H01A harp). See references below.
  5. ONLY if instructed by RC: -> Center beam on target, using rates in BOM and downstream beam monitors. Establish range where beam starts directly interacting with target walls and take middle.
  6. Engage orbit locks and ascertain that they are stable.
  7. Set alarms and interlocks.
  8. Call the MCC and tell them that the beam is good and must keep the beam current at 5 nA.


Default solenoid current and B field 1800 A (~3.78 T)

Nominal Beam Positions (last update Sep 10th, 2020 @ 23:50 PM)

  • 2H01, X: +0.7 mm, Y: -1.6 mm
  • 2C24, X: -2.0 mm, Y: -1.0 mm
  • 2C21, X: -0.4 mm, Y: 0.3 mm


FSD Thresholds

  • Upstream: 2,600 Hz
  • Midstream: 2,000 Hz
  • Downstream: 500,000 Hz
  • BOM: 7,000 Hz

FSD Dwell (Integration) Time

  • Upstream: 5 ms
  • Midstream: 5 ms
  • Downstream: 5 ms
  • BOM: 5 ms

BONuS HV setting

  • Reference Harp Scans for Beam on Tagger Dump: 2C21 [11], 2C24 [12]
  • Reference Harp Scans for Beam on Faraday Cup: 2C21 [13], 2C24 [14][15], 2H01 [16].

Reference Monitoring Histograms 5 nA production trigger [17]

Reference Scalers and Halo-Counter Rates:

  • Well-tuned CW beam on FC, Full LD2 and 4He target, CLAS12 ON: 5 nA [18], 50 nA [19], 240nA [20]
  • Well-tuned CW beam on FC, Empty Target, CLAS12 OFF: 5 nA [21]
  • Well-tuned beam during Moller run [22]
  • Well-tuned beam on Tagger Dump at 5 nA during harp scans: [23]


======================================================================================================================

D. Beam Restoration after major retuning

Updated Manual is at [24]


======================================================================================================================

F. General Instructions:

  • The main lights in the Hall (dome lights) and the Forward Carriage lights are being kept off because of light leaks affecting some of the detectors. If these lights are switched on during an access, they should be switched off when leaving the Hall. Note that the dome lights when switched off cannot be turned back on immediately because they require 10-15 min to cooldown.
  • Get familiar with the shift crew responsibilities for the RTPC (see manual [25]). Especially on how to switch on the HV after a trip.
  • Do not run more than 30 minutes above 30 nA with 5-pass beam without the beam blocker in front of Faraday cup. Put beam blocker in for long running at high currents for 5 pass operations
  • Turn DC HV off only for beam tuning; if no beam is available or when beam is stable, keep them on even if you are not taking data.
  • With any issue contact On-Call Experts or RC - do not spend more than 15-20 min trying to fix the problem.
  • Check for and read any comments to log-book entries made during your shift.
  • During Day shift, check once per day with RC or RTPC expert whether they have purged the target.

Once Per Day (At 13:00):

  • Complete RICH recovery procedure - see Note: 11 below

Every Shift:

  • Follow run plan as outlined by RC
  • If any concern about beam stability, ask MCC if orbit locks are on (they should be).
  • Keep shift summary up to date in HBLOG. Record all that happens.
  • Document any beam condition change and send scaler GUIs to HBLOG
  • Fill out BTA hourly. Click "Load from EPICS" to automatically fill the left side.
  • Upload spectra from clas12mon at beginning of each run and cross-check with reference spectra
    • Reset clas12mon every ~2 hours or after extensive beam down and inspect spectra
  • Fill and submit the shift checklist in the logbook


  • Note 1: FTOF HVs: The goal is to minimize the number of power cycles of the dividers.
    • should be turned off during the initial beam tuning down to the Faraday Cup after CLAS12 has been off for a long shutdown, when doing a Moller run, when doing harp scans, or if there is tuned/pulsed beam in the upstream beamline.
    • should be left on after an initial beam tune has been established and if there are only minor steering adjustments and “tweaks” being made.
    • if shift workers have doubts what to do with the HVs, they can always contact the TOF on-call expert for advice.
  • Note 2: In case of a Torus and/or Solenoid Fast Dump do the following:
    1. Notify MCC to request beam OFF and to drop Hall B status to Power Permit
    2. Call Engineering on-call
    3. Make separate log entry with copies to HBTORUS and HBSOLENOID logbooks. In the "Notify" field add Ruben Fair, Probir Goshal, Dave Kashy and esr-users@jlab.org
    4. Notify Run Coordinator
    5. Turn off all detectors
  • Note 3: When beam is being delivered to the Faraday Cup:
    1. the Fast Shut Down elements: Upstream, Midstream, Downstream, BOM, and Solenoid should always be in the state UNMASKED
    2. No changes to the FSD threshold should be made without RC or beamline expert approval
  • Note 4: Any request for a special run or change of configuration has to be approved by the RC & documented
  • Note 5: Carefully check the BTA every hour and run the script btaGet.py to print for you what HAS TO BE in BTA for this hour. Edit BTA if it is incorrect.
  • Note 6: Reset CLAS12MON frequently to avoid histogram saturation. If CLAS12MON is restarted change MAX scale to 10 (default is 5) for DC normalized occupncy histograms. This would prevent them from saturation. See log entry [26]
  • Note 8: Check the vacuum periodically, make sure vacuum is not higher than 5e-5
  • Note 9: Always reset the CFD threshold after all power off/on on the CND CAMAC crate

After the CAMAC crate (camac1) holding the CND CFD boards is switched off for any reason, it is mandatory to reset the associated thresholds typing the following command from any clon machine terminal: $CODA/src/rol/Linux_x86_64/bin/cnd_cfd_thresh -w 0 If this command is failing and the crate is not responding, reboot it as follows: roc_reboot camac1

  • Note 10: Shift workers should anyway check routinely scalers to verify they update correctly and make a logbook entry if anomalies are observed after starting a new run.
  • Note 11:

For RICH recovery procedures, please see Log entry https://logbooks.jlab.org/entry/3562273. This would apply in the cases of 1. DAQ crash: rich4 is not responding or 2. RICH alarms (LV,missing tile, temperature etc). If it does not work or you are uncertain about what to do, contact the RICH expert on call. Please, note that missing tiles typically occur due to lost communication. Keep in mind that the recovery procedure will kill DAQ. If DAQ is running for other purpose, rather than data taking (for which the RICH acceptance would be important) do not initiate the recovery procedure.

  • The most critical parameter for RICH is the temperature of the photosensors. If the temperature rises above limits, an interlock will automatically turn the RICH HV and LV. If this happens, notify the expert on call and keep taking data without RICH.
  • Note 12: If ROCs mvt1 and/or mvt2 are 100% busy: stop the run, power cycle FMT/BONUS FEU LV (accessible from RTPC Overview or FMT Overview, FMT/BONUS - All LV OFF, FMT/BONUS - All LV ON, HV stays ON), then roc_reboot mvt1, roc_reboot mvt2, wait until it reboots ('ssh mvt1' and 'ssh mvt2' to verify), press 'cancel', 'reset', in the run control GUI, proceed with a new run from 'configure'. If the first LV recycle / roc_reboot doesn’t work call RTPC/BONUS expert.
  • Note 13: If ROC mmft1 is 100% busy: power cycle FTT LV (FT->FTT Overview, HV stays ON), roc_reboot mmft1, wait until it reboots (ssh mmft1 to verify). If the first LV recycle/mmft1 reboot doesn’t work call FT expert
  • Note 14: Trigger Troubleshooting: If you get trigger alarms check first if the trigger bit of a sector alarms both, for the DC roads and non DC roads, in the trigger expert screen (DAQ --> CLAS1 Trigger --> Menu --> Table - Expert). If this is the case (i.e. sector 3 and bits 3 and 10), there might be a problem with HTCC, PCAL or ECAL rocs and you should check the rocs in the runcontrol. If the non DC trigger bit is working and only the one with DC alarms, you would need to check the DC trigger rocs (possibly the one from the alarming sector). If you are not sure, call RC or trigger expert.

Webcams

Hall Webcams

(the first time you open any camera in any browser, accept the security exception)

Manuals

Epics on the web

Fall 2018 Run

fall2018_charge.jpg

Moller rg a fall.jpeg

Spring 2018 Run

chart.jpeg

Moller measurement rg-a.jpg

Remote Shift Schedule and Signup

Bluejeans

  • Permanent connection for communication and screen sharing between remote and local shift workers.
  • https://bluejeans.com/950041022
  • Or, on a clonpc## as user=clasrun, in a terminal run "bluejeans"
  • For audio in the counting house, for now we can use one of the rarely-used phones.

WebOPI

Strip Charts

Monitoring Histograms

  • Changing the reference run/logentry requires updating the URL by the Run Coordinator
  • Reference, current, and 5 most recent runs for runs WITHOUT the FT.
  • For runs WITH the FT (August 13 - August 18 7 a.m), please use the following link: FT ON

For Shift Expert

  • Bluejeans is running on clonpc14 - DO NOT CLOSE THE SESSION
  • The bluejeans session should always share the screen, it is the lower monitor of clonpc14. The alarm handler must be displayed on that monitor to allow remote shifter to keep eye on it.
  • Audio for the bluejeans session goes through the phone, 269-5247. This is the phone attached on the second row of tables (former RC station), behind the shift expert station.
    • DO NOT HANG UP or MUTE the phone, if you have to mute then do not forget to unmute.
    • CHECK AT THE BEGINNING OF EACH SHIFT: About every 6 hours the bluejeans will disconnect the phone if this happens, use the microphone tab in the bluejeans window and choose "Switch to phone audio" then select "Call me" and give the phone number, 757 269 5247. Once you are connected, you have to press "*4" on the phone to unmute yourself.


Clas12design.png