Difference between revisions of "Run Group F"

From clas12-run
Jump to navigation Jump to search
 
(10 intermediate revisions by 3 users not shown)
Line 12: Line 12:
 
'''[https://accwiki.acc.jlab.org/pub/SWDocs/BeamTimeAccounting/Machine_Time_Accounting_User_Guide.pdf Beam Time Accounting User Guide]'''.
 
'''[https://accwiki.acc.jlab.org/pub/SWDocs/BeamTimeAccounting/Machine_Time_Accounting_User_Guide.pdf Beam Time Accounting User Guide]'''.
 
<!-- ===[https://clasweb.jlab.org/wiki/index.php/CLAS12_OPS_Doc#CLAS12_Operations_Documentation Operations Documentation]=== -->
 
<!-- ===[https://clasweb.jlab.org/wiki/index.php/CLAS12_OPS_Doc#CLAS12_Operations_Documentation Operations Documentation]=== -->
 +
===[https://www.jlab.org/Hall-B/run-web/rgf/ESAD_HallB-CLAS12_rgF.pdf ESAD], [https://www.jlab.org/Hall-B/run-web/rgf/COO_HallB-CLAS12_rgF.pdf COO], [https://www.jlab.org/Hall-B/run-web/rgf/RSAD_HallB-CLAS12_rgF.pdf RSAD], [https://www.jlab.org/div_dept/train/SAF111/Hall%20B%20worker%20Safety%20Training%20%28SAF111%29%20%2008%2001-12-1.pdf ERG] ===
 +
===[https://www.jlab.org/Hall-B/run-web/rgf/RTPC_OSP.pdf OSP for Radial Time Projection Chamber]===
 +
===[https://www.jlab.org/Hall-B/run-web/rgf/bonus12_gas_target_osp_97803.pdf OSP for BONUS12 gas target system]===
  
 
| valign=top |
 
| valign=top |
Line 185: Line 188:
 
============================================================================================================================================================
 
============================================================================================================================================================
 
== <font color=blue>'''B. Run Plan'''</font> (see also [https://userweb.jlab.org/~kuhn/BONuS12/Documents/RunPlan.pdf initial run plan]) ==
 
== <font color=blue>'''B. Run Plan'''</font> (see also [https://userweb.jlab.org/~kuhn/BONuS12/Documents/RunPlan.pdf initial run plan]) ==
General plan: Follow a sequence of 6 Days D2 (240 nA), 2 shifts H2 (240 nA), 1 2-hour run empty (250 nA) and 10M events on 4He (240 nA).
 
  
===* Short Term Plan ===
 
Updated, Sep 18th @ 08:00.
 
# Establish the beam on the tagger (all detectors off, all halo couter masked, collimator Blank, beam type is Photon) using 5 nA.
 
# take harp scans on 2c21 and 2c25 and comapre them to the references.
 
# if eveything is fine, call MCC to take the beam away and tell them that we will do a Moller run.
 
# Configure the Moller run and ask MCC to send 4 nA beam and start the Moller run.
 
# When you finish the Moller run end the run and submit the results.
 
# Ask MCC to take the beam away and exit the Moller configuration.
 
# Ask MCC to send 5 nA and do another harp scan on 2c24 to make sure nother changed during the Moller run.
 
# if everything is good, call MCC to take the beam away and tell them that we will send 5 nA to FCup, and ask them to de-gauss the tagger magnet.
 
# change beam type to Electron, Collimator 20 mm and change the FSD setting on the halo counters U/M/D/BOM 1M/1M/1M/masked and dwell time is 50 ms on all of them.
 
# ask for 5nA with the old positions and make sure that the beam goes through the target to the FCup camera.
 
# if everything is fine, ask MCC for 10 nA and do harp scans on 2H01 and 2C24.
 
# if everything is fine get ready to start production on D2.
 
  
 
+
* Collect 30M on H2
 
+
* Call Mohammad to set the target to empty
===* Continue taking data on D2 ===
+
* continue taking data on empty target setting till 7:00AM on Monday, Sep 21st.
  
 
<b>DAQ config:  PROD66 </b>,   
 
<b>DAQ config:  PROD66 </b>,   
 
<b>Trigger file: rgf_inbending_v4_2.trg (.cnf)</b>
 
<b>Trigger file: rgf_inbending_v4_2.trg (.cnf)</b>
# Continue taking data on Full D2 target (~ 67 psig) and 250 nA beam current (@2C24). '''NOTE:''' This is 260 nA on the SLM, which means we have to ask MCC for 250 nA on 2C24 (which is what they see).
+
# Continue taking data with 270 nA beam current (@2C24). '''NOTE:''' This is 280 nA on the SLM, which means we have to ask MCC for 270 nA on 2C24 (which is what they see).
 
# <font color=red> Please write the target pressure and comments in the dialogue box when starting/stopping a run </font>
 
# <font color=red> Please write the target pressure and comments in the dialogue box when starting/stopping a run </font>
 
# Start a run and check that live time is above 85%. If not decrease current and log it.
 
# Start a run and check that live time is above 85%. If not decrease current and log it.
Line 222: Line 210:
 
# b. if the run did not end correctly or if any ROCs had to be rebooted:-> "configure", "download", "prestart", "go"<br>
 
# b. if the run did not end correctly or if any ROCs had to be rebooted:-> "configure", "download", "prestart", "go"<br>
  
 +
=== Plan for Monday Morning, Sep 21st ===
 +
# 07:00 : The beam will be taken away for some MCC studies. Gagik, will confirm with MCC that the Hall goes to Controlled Access.
 +
# 07:00 to 8:00: Gagik will call Eugene to ramp down the torus and ramp the solenoid to 1.5T.
 +
# 07:00- 08:00: Gagik can turn off HV on the following detectors ONLY (LTCC, HTCC, DC, RICH, FMT, FTC, FTH)
 +
# 08:00: Gagik leaves the counting house and the BONuS team (Jiwan and Sebastian) will join to do final cosmic tests.
 +
# Before 12:00: the solenoid be totally ramped down. the bonus team will be in contact with Eugene.
 +
# 12:00: The bonus team will turn off HV on ECAL, PCAL, and CND.
 +
# FTOF and CTOF must be left turned ON.
 
==================================================================================================================================
 
==================================================================================================================================
  
Line 228: Line 224:
  
 
===* Establish beam in the Hall ( CALL RC )===
 
===* Establish beam in the Hall ( CALL RC )===
<font color=green>
 
 
# ALL the detectors must be off. Don't forget the FT and RTPC HV (separate GUIs).
 
# ALL the detectors must be off. Don't forget the FT and RTPC HV (separate GUIs).
 
# Ask MCC to energize the tagger magnet.  
 
# Ask MCC to energize the tagger magnet.  
Line 244: Line 239:
 
''(last update Sep 10th, 2020 @ 23:50 PM)''
 
''(last update Sep 10th, 2020 @ 23:50 PM)''
 
*2H01, X: +0.7 mm, Y: -1.6 mm
 
*2H01, X: +0.7 mm, Y: -1.6 mm
*2C24, X: -1.6 mm, Y: -0.5 mm
+
*2C24, X: -2.0 mm, Y: -1.0 mm
 
*2C21, X: -0.4 mm, Y: 0.3 mm
 
*2C21, X: -0.4 mm, Y: 0.3 mm
  

Latest revision as of 14:49, 25 July 2024

[edit]

Shift Schedule

Shift Checklist

Hot Checkout

Beam Time Accounting

  • See guidance for BTA in

Beam Time Accounting User Guide.

ESAD, COO, RSAD, ERG

OSP for Radial Time Projection Chamber

OSP for BONUS12 gas target system

Manuals

Procedures

JLab Logbooks


RC schedule Weekly form

  • Feb 12 - Feb 18: Mohammad Hattawy
  • Feb 19 - Feb 25: Florian Hauenstein
  • Feb 26 - Mar 3: Eric Christy
  • Mar 4 - Mar 19: Sebastian Kuhn
  • Mar 18 - Mar 23: Carlos Ayerbe

  • RC & RTPC expert list [1]
  • 07/31 - 08/04 : Narbe Kalantarian
  • 08/05 - 08/11 : Stephen Bueltmann
  • 08/12 - 08/18 : Carlos Ayerbe Gayoso
  • 08/20 - 08/21 : Mohammad Hattawy
  • 08/22 - 08/25 : Sebastian Kuhn
  • 08/26 - 09/01 : Mohammad Hattawy
  • 09/02 - 09/08 : Sebastian Kuhn
  • 09/09 - 09/15 : Mohammad Hattawy
  • 09/16 - 09/21 : (Mohammad Hattawy)


Daily Run Group F Coordination Meetings Daily at 12:00 pm. Bluejeans = 757 683 5804


Daily Ops Meeting (working days 7:45):
BlueJeans = 569 476 853


Clas12design.png