Difference between revisions of "Run Group F"

From clas12-run
Jump to navigation Jump to search
 
(7 intermediate revisions by 3 users not shown)
Line 12: Line 12:
 
'''[https://accwiki.acc.jlab.org/pub/SWDocs/BeamTimeAccounting/Machine_Time_Accounting_User_Guide.pdf Beam Time Accounting User Guide]'''.
 
'''[https://accwiki.acc.jlab.org/pub/SWDocs/BeamTimeAccounting/Machine_Time_Accounting_User_Guide.pdf Beam Time Accounting User Guide]'''.
 
<!-- ===[https://clasweb.jlab.org/wiki/index.php/CLAS12_OPS_Doc#CLAS12_Operations_Documentation Operations Documentation]=== -->
 
<!-- ===[https://clasweb.jlab.org/wiki/index.php/CLAS12_OPS_Doc#CLAS12_Operations_Documentation Operations Documentation]=== -->
 +
===[https://www.jlab.org/Hall-B/run-web/rgf/ESAD_HallB-CLAS12_rgF.pdf ESAD], [https://www.jlab.org/Hall-B/run-web/rgf/COO_HallB-CLAS12_rgF.pdf COO], [https://www.jlab.org/Hall-B/run-web/rgf/RSAD_HallB-CLAS12_rgF.pdf RSAD], [https://www.jlab.org/div_dept/train/SAF111/Hall%20B%20worker%20Safety%20Training%20%28SAF111%29%20%2008%2001-12-1.pdf ERG] ===
 +
===[https://www.jlab.org/Hall-B/run-web/rgf/RTPC_OSP.pdf OSP for Radial Time Projection Chamber]===
 +
===[https://www.jlab.org/Hall-B/run-web/rgf/bonus12_gas_target_osp_97803.pdf OSP for BONUS12 gas target system]===
  
 
| valign=top |
 
| valign=top |
Line 187: Line 190:
  
  
===* Continue taking data on H2 ===
+
* Collect 30M on H2
 +
* Call Mohammad to set the target to empty
 +
* continue taking data on empty target setting till 7:00AM on Monday, Sep 21st.
  
 
<b>DAQ config:  PROD66 </b>,   
 
<b>DAQ config:  PROD66 </b>,   
 
<b>Trigger file: rgf_inbending_v4_2.trg (.cnf)</b>
 
<b>Trigger file: rgf_inbending_v4_2.trg (.cnf)</b>
# Continue taking data on Full D2 target (~ 67 psig) and 270 nA beam current (@2C24). '''NOTE:''' This is 280 nA on the SLM, which means we have to ask MCC for 270 nA on 2C24 (which is what they see).
+
# Continue taking data with 270 nA beam current (@2C24). '''NOTE:''' This is 280 nA on the SLM, which means we have to ask MCC for 270 nA on 2C24 (which is what they see).
 
# <font color=red> Please write the target pressure and comments in the dialogue box when starting/stopping a run </font>
 
# <font color=red> Please write the target pressure and comments in the dialogue box when starting/stopping a run </font>
 
# Start a run and check that live time is above 85%. If not decrease current and log it.
 
# Start a run and check that live time is above 85%. If not decrease current and log it.
Line 205: Line 210:
 
# b. if the run did not end correctly or if any ROCs had to be rebooted:-> "configure", "download", "prestart", "go"<br>
 
# b. if the run did not end correctly or if any ROCs had to be rebooted:-> "configure", "download", "prestart", "go"<br>
  
 +
=== Plan for Monday Morning, Sep 21st ===
 +
# 07:00 : The beam will be taken away for some MCC studies. Gagik, will confirm with MCC that the Hall goes to Controlled Access.
 +
# 07:00 to 8:00: Gagik will call Eugene to ramp down the torus and ramp the solenoid to 1.5T.
 +
# 07:00- 08:00: Gagik can turn off HV on the following detectors ONLY (LTCC, HTCC, DC, RICH, FMT, FTC, FTH)
 +
# 08:00: Gagik leaves the counting house and the BONuS team (Jiwan and Sebastian) will join to do final cosmic tests.
 +
# Before 12:00: the solenoid be totally ramped down. the bonus team will be in contact with Eugene.
 +
# 12:00: The bonus team will turn off HV on ECAL, PCAL, and CND.
 +
# FTOF and CTOF must be left turned ON.
 
==================================================================================================================================
 
==================================================================================================================================
  
Line 211: Line 224:
  
 
===* Establish beam in the Hall ( CALL RC )===
 
===* Establish beam in the Hall ( CALL RC )===
<font color=green>
 
 
# ALL the detectors must be off. Don't forget the FT and RTPC HV (separate GUIs).
 
# ALL the detectors must be off. Don't forget the FT and RTPC HV (separate GUIs).
 
# Ask MCC to energize the tagger magnet.  
 
# Ask MCC to energize the tagger magnet.  

Latest revision as of 14:49, 25 July 2024

[edit]

Shift Schedule

Shift Checklist

Hot Checkout

Beam Time Accounting

  • See guidance for BTA in

Beam Time Accounting User Guide.

ESAD, COO, RSAD, ERG

OSP for Radial Time Projection Chamber

OSP for BONUS12 gas target system

Manuals

Procedures

JLab Logbooks


RC schedule Weekly form

  • Feb 12 - Feb 18: Mohammad Hattawy
  • Feb 19 - Feb 25: Florian Hauenstein
  • Feb 26 - Mar 3: Eric Christy
  • Mar 4 - Mar 19: Sebastian Kuhn
  • Mar 18 - Mar 23: Carlos Ayerbe

  • RC & RTPC expert list [1]
  • 07/31 - 08/04 : Narbe Kalantarian
  • 08/05 - 08/11 : Stephen Bueltmann
  • 08/12 - 08/18 : Carlos Ayerbe Gayoso
  • 08/20 - 08/21 : Mohammad Hattawy
  • 08/22 - 08/25 : Sebastian Kuhn
  • 08/26 - 09/01 : Mohammad Hattawy
  • 09/02 - 09/08 : Sebastian Kuhn
  • 09/09 - 09/15 : Mohammad Hattawy
  • 09/16 - 09/21 : (Mohammad Hattawy)


Daily Run Group F Coordination Meetings Daily at 12:00 pm. Bluejeans = 757 683 5804


Daily Ops Meeting (working days 7:45):
BlueJeans = 569 476 853


Clas12design.png