Difference between revisions of "Run Group K"

From clas12-run
Jump to navigation Jump to search
Line 141: Line 141:
 
<i>(Updated: Nov. 28, 2018 at 9:43 a.m.)</i>
 
<i>(Updated: Nov. 28, 2018 at 9:43 a.m.)</i>
 
* Before beam delivery ramp torus to -3770 A (100% field - negatives outbending) and solenoid to 2416 A (100% field); empty target and turn all detectors off except Micro Megas
 
* Before beam delivery ramp torus to -3770 A (100% field - negatives outbending) and solenoid to 2416 A (100% field); empty target and turn all detectors off except Micro Megas
* When MCC tels that beam is available call RC at (757)575-7540
+
* When MCC tells that beam is going to be available call RC at (757)575-7540
 
* Tune beam in upstream beamline following nominal procedures [https://wiki.jlab.org/clas12-run/images/e/e3/Estab_beam.pdf Establish Physics Quality Beam]
 
* Tune beam in upstream beamline following nominal procedures [https://wiki.jlab.org/clas12-run/images/e/e3/Estab_beam.pdf Establish Physics Quality Beam]
 
* Take Moller run [[Media:clas12moller.pdf|Performing M&oslash;ller Runs]] - ensure that beam polarization is high (>85%) - otherwise consult with RC to decide if spin dance is needed
 
* Take Moller run [[Media:clas12moller.pdf|Performing M&oslash;ller Runs]] - ensure that beam polarization is high (>85%) - otherwise consult with RC to decide if spin dance is needed

Revision as of 15:54, 28 November 2018

[edit]


Clas12design.png