Difference between revisions of "Run Group K"

From clas12-run
Jump to navigation Jump to search
Line 145: Line 145:
  
 
* Production running using trigger '''rgk_v4.trg''' (electron trigger pre-scaler by a factor 2) at '''45 nA'''
 
* Production running using trigger '''rgk_v4.trg''' (electron trigger pre-scaler by a factor 2) at '''45 nA'''
 +
* At 6 a.m. Dec. 10 MCC will terminate beam delivery for the LINAC energy change. At that time do the following:
 +
** Call the PDL Eugene Pasyuk to ramp the torus and solenoid magnets to zero
 +
** Note that Bob Miller will warm the target up when he arrives for work at 7 a.m.
  
 
<br><hr><br>
 
<br><hr><br>

Revision as of 20:39, 7 December 2018

[edit]


Clas12design.png