Difference between revisions of "KPP Run"
Jump to navigation
Jump to search
Line 107: | Line 107: | ||
# Follow beam position and current strip charts for 2C21 and 2C24 nA BPMs, make log entry of strip charts | # Follow beam position and current strip charts for 2C21 and 2C24 nA BPMs, make log entry of strip charts | ||
# Setup FSD if it is day time and beamline expert is present, 2(l) and 2(m), otherwise skip them | # Setup FSD if it is day time and beamline expert is present, 2(l) and 2(m), otherwise skip them | ||
− | # Start bringing the CLAS12 detectors ON and do rate studies , 2(n) and 2(o) | + | # Start bringing the CLAS12 detectors ON and do rate studies , 2(n) and 2(o). When moving target in, consult [[Media: Harp_TargetStick.pdf| 2H01 harp stick drawing]] to define how far you should move the motor to get carbon target on the beam, first bullet of 2(o). |
<b> At this point call DAQ, EC, DC, and FTOF experts, notify them that beam is ready for data taking</b> | <b> At this point call DAQ, EC, DC, and FTOF experts, notify them that beam is ready for data taking</b> | ||
Revision as of 18:54, 2 February 2017
[edit]
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 KPP run, February 3 to March 3
Beam energy 6.4 GeV (3 pass)
Important: Document all your work in the logbook!
RC: Stepan Stepanyan
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Eugene Pasyuk
- (757) 876-1789
- 9 876-1789 from Counting Room
Run Plan for February 2 - 3, 2017 :Start close-up of the Hall at 5pm on Thursday, February 2Locking up the hall on Fridays
Establish beam to the tagger yoke dump
Bring beam to FC:
At this point call DAQ, EC, DC, and FTOF experts, notify them that beam is ready for data taking
Important Notes:
|
General Instructions:Establishing Acceptable Beam Conditions:
Setting up the FSD threshold
hpsrun@clonpc11> /home/hpsrun/scripts/FSD/Calc_FSD_Threshold.exe
|
Every Shift:
|
Every Run:
|
---|
Webcams |
Manuals |