Line 117: | Line 117: | ||
==<font color=blue><b>General Instructions:</b></font>== | ==<font color=blue><b>General Instructions:</b></font>== | ||
+ | |||
+ | ===<font color=magenta><b>DAQ RECOVERY</b></font>=== | ||
+ | If DAQ crashed/broken: call DAQ on-call cell phone. | ||
<!-- | <!-- | ||
− | |||
− | |||
# For every daq crash login into clondaq3 as a clasrun then run the following command | # For every daq crash login into clondaq3 as a clasrun then run the following command | ||
#* clasrun@clondaq3:clasrun> <font color='blue'> save_DAQ_logs.pl</font> (See [https://logbooks.jlab.org/files/2016/04/3397123/DAQ_DPM_Crash_0.png]) | #* clasrun@clondaq3:clasrun> <font color='blue'> save_DAQ_logs.pl</font> (See [https://logbooks.jlab.org/files/2016/04/3397123/DAQ_DPM_Crash_0.png]) | ||
Line 135: | Line 136: | ||
#** Positions on both harps should be within 1mm | #** Positions on both harps should be within 1mm | ||
#** Width on 2C21 should be <~0.1+/-0.05 mm | #** Width on 2C21 should be <~0.1+/-0.05 mm | ||
− | #** Width on tagger harp (2C24) <~0. | + | #** Width on tagger harp (2C24) <~0.5 +/- 0.1mm |
#* Halo counters UPS-L/R and TAG-L/T/T2 should be ~few Hz/nA [https://logbooks.jlab.org/entry/3376736] | #* Halo counters UPS-L/R and TAG-L/T/T2 should be ~few Hz/nA [https://logbooks.jlab.org/entry/3376736] | ||
<!-- # <b> While MCC degausses the tagger magnet, verify that chicane is ON</b> | <!-- # <b> While MCC degausses the tagger magnet, verify that chicane is ON</b> | ||
Line 143: | Line 144: | ||
#* If you don't see it immediately, and rates on halo counters are more than 100 Khz, then ask MCC, to change to pulsed (tune mode) beam, and ask to put corrector values. At this point don't accept any CW beam, until beam spot is visible on Downstream Viewer. | #* If you don't see it immediately, and rates on halo counters are more than 100 Khz, then ask MCC, to change to pulsed (tune mode) beam, and ask to put corrector values. At this point don't accept any CW beam, until beam spot is visible on Downstream Viewer. | ||
#* If MCC operator is not able to tune the beam more than 30 minutes, then please notify RC | #* If MCC operator is not able to tune the beam more than 30 minutes, then please notify RC | ||
− | #* Tune beam profile at CLAS12 target using 2H01A harp. The required beam profile at 2H01A harp is: X-width <~0. | + | #* Tune beam profile at CLAS12 target using 2H01A harp. The required beam profile at 2H01A harp is: X-width <~0.3 mm, Y-width <~ 0.3 mm |
#* Check and log the beam spot on chromax viewer | #* Check and log the beam spot on chromax viewer | ||
#* Check rates on halo counters | #* Check rates on halo counters | ||
#*# UPS-L and UPS-R few Hz/nA, | #*# UPS-L and UPS-R few Hz/nA, | ||
− | #*# The tagger counters should count less than Hz/nA and downstream counters should count ~Hz/nA | + | #*# The tagger counters should count less than Hz/nA and downstream counters should count ~Hz/nA, |
− | #* Once all the above is achieved, turn first CLAS12 ECal HV '''ON''' and monitor and log ECal rates | + | #*# Midstream counters few Hz/nA |
+ | #* Once all the above is achieved, turn first CLAS12 ECal HV '''ON''' and monitor and log ECal rates before bringing rest of the detector UP | ||
=== Setting up the FSD threshold === | === Setting up the FSD threshold === |
Revision as of 19:24, 2 February 2017
[edit]
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 KPP run, February 3 to March 3
Beam energy 6.4 GeV (3 pass)
Important: Document all your work in the logbook!
RC: Stepan Stepanyan
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Eugene Pasyuk
- (757) 876-1789
- 9 876-1789 from Counting Room
Run Plan for February 2 - 3, 2017 :Start close-up of the Hall at 5pm on Thursday, February 2Locking up the hall on Fridays
Establish beam to the tagger yoke dump
Bring beam to FC:
At this point call DAQ, EC, DC, and FTOF experts, notify them that beam is ready for data taking
Important Notes:
|
General Instructions:DAQ RECOVERYIf DAQ crashed/broken: call DAQ on-call cell phone. Establishing Acceptable Beam Conditions:
Setting up the FSD threshold
hpsrun@clonpc11> /home/hpsrun/scripts/FSD/Calc_FSD_Threshold.exe
|
Every Shift:
|
Every Run:
|
---|
Webcams |
Manuals |