Difference between revisions of "KPP Run"
Jump to navigation
Jump to search
Line 106: | Line 106: | ||
=== Important Notes: === | === Important Notes: === | ||
# '''Do not run more than 60 minutes above 30 nA without the beam blocker in front of Faraday cup. Put beam blocker in for long running at high currents.''' | # '''Do not run more than 60 minutes above 30 nA without the beam blocker in front of Faraday cup. Put beam blocker in for long running at high currents.''' | ||
+ | |||
+ | # '''If DAQ crashed/broken: call DAQ on-call cell phone.''' | ||
+ | |||
+ | # '''With any issue contact On-Call Experts or RC''' - do not spend more than 15-20 min trying to fix the problem. | ||
+ | |||
| valign=top | | | valign=top | | ||
Line 111: | Line 116: | ||
==<font color=blue><b>General Instructions:</b></font>== | ==<font color=blue><b>General Instructions:</b></font>== | ||
− | + | ||
− | |||
<!-- | <!-- | ||
# For every daq crash login into clondaq3 as a clasrun then run the following command | # For every daq crash login into clondaq3 as a clasrun then run the following command | ||
Line 177: | Line 181: | ||
#* Fill and submit the [https://logbooks.jlab.org/checklists/151 shift checklist in the logbook] | #* Fill and submit the [https://logbooks.jlab.org/checklists/151 shift checklist in the logbook] | ||
# Perform 2H01A harp scan once per shift or when beam conditions have changed, based on beam monitors (BPMs, halo rates, beam-viewer). During harp scans the HV for DC and HTCC should be OFF. | # Perform 2H01A harp scan once per shift or when beam conditions have changed, based on beam monitors (BPMs, halo rates, beam-viewer). During harp scans the HV for DC and HTCC should be OFF. | ||
− | |||
| valign=top style="background:#eeeeee;"| | | valign=top style="background:#eeeeee;"| |
Revision as of 21:57, 2 February 2017
[edit]
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 KPP run, February 3 to March 3
Beam energy 6.4 GeV (3 pass)
Important: Document all your work in the logbook!
RC: Stepan Stepanyan
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Eugene Pasyuk
- (757) 876-1789
- 9 876-1789 from Counting Room
Run Plan for February 2 - 3, 2017 :The Hall was closed and brought to controlled access at 8pm on Thursday, February 2While no beam, cosmic calibration run is in progress with all CLAS12 detectors ON. When ready to get beam, Turn all beamline devices ON, turn all CLAS12 detectors OFF (including SVT)
Establish beam to the tagger yoke dump
Bring beam to FC:
At this point call DAQ, EC, DC, and FTOF experts, notify them that beam is ready for data taking
Important Notes:
|
General Instructions:Locking up the hall
Establishing Acceptable Beam Conditions:
Setting up the FSD threshold
hpsrun@clonpc11> /home/hpsrun/scripts/FSD/Calc_FSD_Threshold.exe
|
Every Shift:
|
Every Run:
|
---|