Difference between revisions of "Run Group B"

From clas12-run
Jump to navigation Jump to search
Line 117: Line 117:
 
<b> Compare the monitoring histograms </b> from [https://clas12mon.jlab.org/mon12/histograms/?reference=3746641 clas12mon] to the reference and troubleshoot as needed.
 
<b> Compare the monitoring histograms </b> from [https://clas12mon.jlab.org/mon12/histograms/?reference=3746641 clas12mon] to the reference and troubleshoot as needed.
  
Make sure comments field  -- label   
+
When stopping a run, check the current entered in the pop-up window and put comments when relevant -- <b> please label junk runs </b>.  
 +
 
 
------
 
------
  
Line 217: Line 218:
 
* [https://bta.acc.jlab.org Fill out BTA] hourly.  Click "Load from EPICS" to automatically fill the left side. Run the script <font color=red>btaGet.py</font> to print for you the correct BTA info for this hour -- edit the values on the BTA page if they are wrong!
 
* [https://bta.acc.jlab.org Fill out BTA] hourly.  Click "Load from EPICS" to automatically fill the left side. Run the script <font color=red>btaGet.py</font> to print for you the correct BTA info for this hour -- edit the values on the BTA page if they are wrong!
 
* Upload spectra from clas12mon at begin and end of shift and cross-check with reference spectra
 
* Upload spectra from clas12mon at begin and end of shift and cross-check with reference spectra
** Reset clas12mon every ~2 hours and inspect spectra. <i>If CLAS12MON is restarted change MAX scale to 10 (default is 5) for DC normalized occupancy histograms. This would prevent them from saturation. See log entry [https://logbooks.jlab.org/entry/3667416] </i>
+
** Reset clas12mon every ~2 hours and inspect spectra.
 
* Fill and submit the [https://logbooks.jlab.org/checklists/151 shift checklist in the logbook]
 
* Fill and submit the [https://logbooks.jlab.org/checklists/151 shift checklist in the logbook]
 
* Monitor the SVT Slow Controls status, post plot of current stability in the HBSVT elog once per shift.
 
* Monitor the SVT Slow Controls status, post plot of current stability in the HBSVT elog once per shift.

Revision as of 17:15, 5 December 2019

[edit]

Shift Schedule

Shift Checklist

Hot Checkout

Beam Time Accounting

Manuals

Procedures

JLab Logbooks

RC schedule

  • Nov 20 - Nov 27: S. Stepanyan
  • Nov 27 - Dec 4: M. Contalbrigo
  • Dec 4 - Dec 11: D. Sokhan
  • Dec 11 - Dec 19: S. Niccolai
  • Jan 7 - Jan 15: J. Gilfoyle
  • Jan 15 - Jan 22: V. Kubarovsky
  • Jan 22 - Jan 29: B. McKinnon