Difference between revisions of "Run Group F"

From clas12-run
Jump to navigation Jump to search
Line 107: Line 107:
  
 
<b>DAQ config: ; Trigger file:rgf_inbending_v1_1.trg </b> (same for inbending and outbending)
 
<b>DAQ config: ; Trigger file:rgf_inbending_v1_1.trg </b> (same for inbending and outbending)
# At the beginning of the shift: Call Daniel Carmen (PDL: (757) 876-1789) to start energizing the solenoid at full field (2420 A) [https://clasweb.jlab.org/wiki/images/d/dc/Hall_B_Solenoid_Power-Up_and_Power-Down_Procedure.pdf] and start energizing Torus at 1/2 maximum field (-1880 A) in out-bending polarity [https://clasweb.jlab.org/wiki/images/d/d6/Hall_B_Torus_Power-Up_and_Power-Down_Procedure.pdf].
+
# At the beginning of the shift: Call Daniel Carmen (PDL: (757) 876-1789) to start energizing the solenoid at full field (2420 A) [https://clasweb.jlab.org/wiki/images/d/dc/Hall_B_Solenoid_Power-Up_and_Power-Down_Procedure.pdf] and start energizing Torus at 1/2 maximum field (-1880 A) in out-bending polarity [https://clasweb.jlab.org/wiki/images/d/d6/Hall_B_Torus_Power-Up_and_Power-Down_Procedure.pdf]. Once the magnets at the requested fields, please sumbit screenshots to logbook. clascss->Soleoind/Torus->Magnet Power Supply. 
 
# In parallel to 1, call RTPC expert to set target to “empty” (= 1 atm H2).
 
# In parallel to 1, call RTPC expert to set target to “empty” (= 1 atm H2).
 
# In parallel to 1 and 2, Restore beam to the hall, first to the tagger dump, following the procedures described in [https://wiki.jlab.org/clas12-run/images/e/e3/Estab_beam.pdf].  
 
# In parallel to 1 and 2, Restore beam to the hall, first to the tagger dump, following the procedures described in [https://wiki.jlab.org/clas12-run/images/e/e3/Estab_beam.pdf].  
Line 115: Line 115:
 
# Engage orbit locks and ascertain that they are stable.
 
# Engage orbit locks and ascertain that they are stable.
 
# Set alarms and interlocks.
 
# Set alarms and interlocks.
 +
# Call the MCC and tell them that the beam is good and must keep the beam current at 5 nA. 
 +
# TURN HV ON for all the detectors. 
 
# Collect data with standard trigger at low beam current and check occupancy, rates, and trigger rates.
 
# Collect data with standard trigger at low beam current and check occupancy, rates, and trigger rates.
# Ramp up current to desired value (about 200 nA for production running, up to 250 nA for “empty” target; lower for 2.2 GeV and outbending configurations), while recording trigger rates, DC and RTPC occupancies, dead times and overall data rate.
+
# Ramp up current to desired value (5, 10, 25, 50, 75, 100, 150, 175, 200, 225, 250 nA), while recording trigger rates, DC and RTPC occupancies, dead times and overall data rate.For every beam current, please submit a logbook entry with a screenshot of the beamline overview from clascss->Beamline->overview. 
# Re-check alarms and interlocks, rates and occupancies and make adjustments as necessary
+
# Re-check alarms and interlocks, rates and occupancies and make adjustments as necessary.
  
  

Revision as of 13:50, 6 February 2020

[edit]

Shift Schedule

Shift Checklist

Hot Checkout

Beam Time Accounting

  • See guidance for BTA in

Beam Time Accounting User Guide.

Manuals

Procedures

JLab Logbooks


RC schedule

  • Feb 12 - Feb 18: Mohammad Hattawy
  • Feb 19 - Feb 25: Florian Hauenstien
  • Feb 26 - Mar 3: Eric Christy
  • Mar 4 - Mar 17: Sebastian Kuhn
  • Mar 18 - Mar 24: Mohammad Hattawy
  • Mar 25 - Mar 31: Raphael Dupre
  • Apr 1 - Apr 7 : Carlos Ayerbe
  • Apr 8 - Apr 14: Narbe Kalantarians
  • Apr 15 - Apr 21:
  • Apr 22 - May 6 : Stephen Bultmann


Clas12design.png