Difference between revisions of "Run Group C"

From clas12-run
Jump to navigation Jump to search
Line 171: Line 171:
 
### Call Yuri to restore MVT HV to normal operation.   
 
### Call Yuri to restore MVT HV to normal operation.   
 
### Increase beam current as occupancy / trigger rate / currents allow.  If you can increase beam past 15 nA, then put in the beam blocker and call Rafo for calibration constants.
 
### Increase beam current as occupancy / trigger rate / currents allow.  If you can increase beam past 15 nA, then put in the beam blocker and call Rafo for calibration constants.
### Take a two hour beam position calibration run (change trigger to standard DAQ) WITHOUT LHe and WITHOUT raster (ask MCC to mask raster FSD).
+
### Take a two hour beam position calibration run (change trigger to standard DAQ configuration [see below]) WITHOUT LHe and WITHOUT raster (ask MCC to mask raster FSD).
 
## Items for later:
 
## Items for later:
 
### Re-establish raster from before (ask MCC to remove raster FSD mask) and take a 2 hour run with standard running condition (still no LHe).
 
### Re-establish raster from before (ask MCC to remove raster FSD mask) and take a 2 hour run with standard running condition (still no LHe).

Revision as of 07:41, 5 September 2022

[edit]


Clas12design.png