Difference between revisions of "Run Group D"
Line 61: | Line 61: | ||
<!--####################################### PHONE NUMBERS #############################################--> | <!--####################################### PHONE NUMBERS #############################################--> | ||
{{PhoneNumbers}} | {{PhoneNumbers}} | ||
− | <!--- JUST MODIFY AND SAVE ANYTHING IN THIS COMMENT BLOCK TO FORCE A REFRESH OF THE PHONE NUMBERS | + | <!--- JUST MODIFY AND SAVE ANYTHING IN THIS COMMENT BLOCK TO FORCE A REFRESH OF THE PHONE NUMBERS TEMPLATE! --> |
= Short Term Schedule = | = Short Term Schedule = |
Revision as of 13:51, 21 September 2023
- General
- Phone Numbers
- Short Term Schedule
- Shift Expert
- Shift Worker
- Monitoring
- Important Operation Links
GeneralLogbookShift ScheduleRun Coordinator ScheduleESAD, COO, RSADShift ChecklistBeam Time AccountingHot Checkout |
ManualsSystemsDetectorsSoftware
|
Procedures
Logbooks
|
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click to Edit solely this tab. P.S.: You then have to click on the top Edit, next to Read, followed by "Save changes" to force the current page to refresh.
Run Coordinator: Lamiaa El Fassi (757) 575-7540
PDL: Nathan Baltzell (9-) 757 876-1789; Office: x5902
RG/Analysis Coordinator (AC): Lamiaa El Fassi (630) 605-4259
Daily RC/OA Meetings at 13:00 in CH Room 200C, and on ZOOM: URL Link (Meeting ID: 1611984219; Passcode: RGD-RC23), except on Wednesdays, which is on ZOOM ONLY @ 15:30 due to the conflict with the 13:30 MCC Scheduling/Planning meeting.
Important Notes
Do NOT change FSD settings without approval from RC or beamline expert!
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House and inform the Crew Chief and RC.
- In case of evacuation of the Counting Room (e.g., due to a fire alarm), grab the shift expert phone and leave the room through the "EXIT" door leading to the parking lot. Do not leave through the hallway! Call the RC once outside so the latter will call MCC to turn the beam OFF to Hall B and inform other Hall B staff members.
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.
- Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Shift Worker" tab, as you need some lead time to set up!
- Note to Shift Takers:
- ◊ Read the ESAD, COO, RSAD, and ERG documents found on the "Current RG-D Run Info" as well as the yellow folder in the counting room. Before you start your first shift on the current experiment, you must sign on the list in the yellow folder. Thereby, you confirm that you have read and understand their content.
- ◊ Read at least the previous 24 hours logbook entries to be aware of recent run details and changes;
- ◊ Arrive at least 10 minutes early for shift change;
- ◊ Refresh the runwiki page/tabs; look over it/them every shift:
- - Follow the Shift Expert/Worker tab's instructions.
- ◊ Do not spend more than 15-20 min trying to fix a problem. In case of any issue, contact the On-call Experts or the RC.
- ◊ Review these important links:
- - Recent Changes and Current Issues
- - General How-to for beam restoration procedures and Møller runs.
Run Plan, Thursday, Dec. 14th - Friday, Dec. 15th, 2023
P.S.: If the beam is widely fluctuating above 105 nA, constantly overshooting over 105 nA on 2C21A, please ask MCC to narrow down the fluctuation margin to keep it below 105 nA based on 2C21A reading. They could put the beam current monitor lock on 2C21A in case that may help with the wide fluctuation and/or adjust our laser phase as well as narrow down the slit width, see ELOG entries 4224300 and 4225220. |
General Instructions
|
|
|
Reference Values
FSD Thresholds from RG-D
- Upstream: 2 kHz
- Midstream: 2 kHz
- Downstream: 100 kHz
- BOM: 50 kHz
- 5 ms dwell time
Harp Scan References from RG-D
- 2H01 [3]; x= -1.4 mm; y= 0.0 mm
- Tagger (2C24A) [4]: x= -2.0 mm; y= +0.6 mm
- 2C21A [5]: x= -0.4 mm; y= +0.6 mm (less important; values form RG-C)
IA for Q Asymmetry
- HWP IN: https://logbooks.jlab.org/entry/4194811 and https://logbooks.jlab.org/entry/4195453
- HWP OUT: https://logbooks.jlab.org/entry/4195738 and https://logbooks.jlab.org/entry/4195733
Tasks
- Come to your shift in time for the shift change, 10-15 minutes before the start of your shift.
- Follow the Short Term Schedule as outlined by RC
- Run Plan, DAQ Configuration, and References and Standards
- Keep shift summary up to date in HBLOG. Record all that happens.
- Do a RICH recovery (press the RICH Recovery button on the GUI) once daily during the day shift, between runs. Please log in shift summary.
- Note the automated "RICH Recovery" sequence already confirms RICH4 is up and accepting SSH connections before claiming success.
- You have to "Cancel->Reset->Configure->Download->Prestart" before starting the next run.
- Fill out BTA hourly. Click "Load from EPICS" to fill the left side automatically, then correct as needed.
- Accelerator beam time:
- ABU: acceptable beam used (e.g. harp scans, calibrations, trigger settings, running)
- The info from EPICS is not always correct; e.g. when taking data with low beam current, you should change the ABU to the proper (estimated) time by hand instead of simply accepting "0" if you are actually taking data.
- BANU: beam acceptable but not used (e.g. target change or our problems)
- BNA: beam not acceptable (e.g. tuning, drifting, not focused)
- ABU: acceptable beam used (e.g. harp scans, calibrations, trigger settings, running)
- Experiment beam time
- ER: experiment ready
- PCC: planned configuration change (when the beam is masked while radiators are moved, DAQ (stopping/starting runs, tests, ...) are PCC.
- UED: unplanned experiment down, is used for hardware failure
- Enter fields at the tab "Shift Information"
- Promptly send "Info for MCC" at 7:00, 15:00, and 23:00
- Sign, viz log completed 8-hour sheet
- Accelerator beam time:
- If the worker shift is remote, maintain communications with them in Zoom: https://jlab-org.zoomgov.com/j/1619881100
In case of other questions or uncertainties of what to do, call the RC or PDL
Tasks
- Come to your shift in time for the shift change, 10-15 minutes before the start of your shift.
Hourly
- Reset and check mon12 histograms
- Note, some plots have radio buttons at the bottom to choose the sector, in which case you should cycle through and check all sectors.
Once per run
- Submit EPICS screenshots to the HBRUN logbook with beam ON!
- Beamline overview, in VNC or Web Browser
- CLAS12 trigger rates and DAQ status
- Upload mon12 monitoring plots to HBLOG logbook with sufficient statistics
- Afterwards, compare them to the reference and recent runs, see the top-right link at Monitoring tab above.
- Submit strip charts to the HBRUN logbook
- Beam current and position strip-charts (CS-Studio → Beamline → Strip Charts)
- Also accessible in a web browser: Upstream/Midstream Halo Counters, Downstream Halo Counters, Beam Currents, BPM Positions
Once per shift
- Fill the shift checklist
For Remote Shifts
You must test your setup, including Zoom and VNC connections, at least 24 hours before your first shift!
- Zoom for 24-7 communication with counting house: https://jlab-org.zoomgov.com/j/1618614939
- The passcode is required and contained in this log entry
- Remind the expert in the counting house to restart their zoom, if necessary
- Remote VNC connection instructions: https://logbooks.jlab.org/entry/3906039
- All necessary applications should be avaible from the desktop menu (left/right click on the desktop)
- EPICS GUIs should be accessed ONLY via the desktop menu or by running clascss-remote.
Webcams
|
EPICS
|
Data Quality
|
Hall-B |
Accelerator |
ZOOM meetings
|