Difference between revisions of "Run Group K"

From clas12-run
Jump to navigation Jump to search
(Added link to run spreadsheet to RC duties)
Line 78: Line 78:
 
* Chek the upcoming shifts, and if necessary, coordinate with the PDL to contact shifters about their training and site access status.
 
* Chek the upcoming shifts, and if necessary, coordinate with the PDL to contact shifters about their training and site access status.
 
* Remote shifts are listed [[Upcoming-remote-shifts|here]].
 
* Remote shifts are listed [[Upcoming-remote-shifts|here]].
* Backup shift personnel is listed [https://jeffersonlab-my.sharepoint.com/:x:/r/personal/baltzell_jlab_org/Documents/Backup%20Shifters.xlsx?d=wf18dc5909cf84424840d73cc9bd8ce8e&csf=1&web=1&e=QwY1fs here]. <font color=fuchsia><i> Needs updating </i></font>
+
* Backup shift personnel is listed [https://jeffersonlab-my.sharepoint.com/:x:/r/personal/baltzell_jlab_org/Documents/Backup%20Shifters.xlsx?d=wf18dc5909cf84424840d73cc9bd8ce8e&csf=1&web=1&e=QwY1fs here].
  
 
=== Daily ===
 
=== Daily ===
Line 85: Line 85:
 
** See the ZOOM connection info under {{#switchtablink:Important_Links|Important Links}} tab.
 
** See the ZOOM connection info under {{#switchtablink:Important_Links|Important Links}} tab.
  
* Update the run plan in the {{#switchtablink:Short_Term_Schedule|Short Term Schedule}} tab in coordination with the RG-K experiment coordinators (i.e., Annalisa, Daniel, Latifa, Harut, etc.) and communicate it to the shift crew.  
+
* Update the run plan in the {{#switchtablink:Short_Term_Schedule|Short Term Schedule}} tab in coordination with the RG-K experiment coordinators (i.e., Annalisa, Daniel) and communicate it to the shift crew.  
  
 
* Log the RC summary in the HBLOG.  
 
* Log the RC summary in the HBLOG.  
Line 94: Line 94:
  
 
* Run the RC meetings at 13:00 in CH Room 200C and on ZOOM, except on Wednesdays.
 
* Run the RC meetings at 13:00 in CH Room 200C and on ZOOM, except on Wednesdays.
** On Wednesdays, the RC meeting is held on Zoom only at 15:30, due to the conflict with the 13:30 MCC meeting and the unavailability of the CH room afterwards.
+
** On Wednesdays, the RC meeting is held on Zoom only at 15:00, due to the conflict with the 13:30 MCC meeting and the unavailability of the CH room afterwards.
 
** To connect to Zoom in CH Room 200C, follow these steps:
 
** To connect to Zoom in CH Room 200C, follow these steps:
 
*** Turn on the projector with the white remote control, then log into your CUE account. If not listed yet, click "Not listed?" in the bottom left to add your account.  
 
*** Turn on the projector with the white remote control, then log into your CUE account. If not listed yet, click "Not listed?" in the bottom left to add your account.  
Line 109: Line 109:
 
*** [https://ace.jlab.org/btm/reports/physics-summary Beam Time Manager; Physics Time Accounting]
 
*** [https://ace.jlab.org/btm/reports/physics-summary Beam Time Manager; Physics Time Accounting]
 
** Refer to the <font color=fuchsia> <i> (is this corect?) </i> [https://docs.google.com/spreadsheets/d/1p_NaWUtR5q7lrO3np076EcClwUNqVzb2NymTndiqI8k/edit#gid=0 RC Timesheet]</font> to calculate the percentage of scheduled experiment hours to date.
 
** Refer to the <font color=fuchsia> <i> (is this corect?) </i> [https://docs.google.com/spreadsheets/d/1p_NaWUtR5q7lrO3np076EcClwUNqVzb2NymTndiqI8k/edit#gid=0 RC Timesheet]</font> to calculate the percentage of scheduled experiment hours to date.
** The total experiment data collected to date could be retrieved from the up-to-date "Accumulated Charge" depicted on the "Total Charge on Target Plot" in the {{#switchtablink:Monitoring|Monitoring}} tab. <font color=fuchsia><i> Currently not available </i></font>
+
** The total experiment data collected to date could be retrieved from the up-to-date "Accumulated Charge" depicted at [https://clas12mon.jlab.org/charge/]
  
 
* Attend the Hall B meeting on Mondays at 9 AM and present your summary slides that should be sent beforehand to the Hall B leader, Patrick Achenbach.  
 
* Attend the Hall B meeting on Mondays at 9 AM and present your summary slides that should be sent beforehand to the Hall B leader, Patrick Achenbach.  

Revision as of 12:03, 11 January 2024

[edit]
Role Phone Number
Hall B Run Coordinator (757) 575-7540 (cell)
Hall B Physics Division Liaison (757) 876-1789 (cell)
MCC 7048
Crew Chief 7045
Crew Chief (757) 876-3367 (cell)
Program Deputy (757) 876-7997 (cell)
RadCon (757) 876-1743 (cell)
Gate House Guard 5822
Location Phone Number
Hall B Floor 5165
Hall B Space Frame 5170 and 5171
Hall B Forward Carriage 5371
Hall B Gas Shed 7115
Hall B Counting House 5244 (Shift Expert)
Hall B Counting House (757) 329-4846 (Shift Expert cell)
Hall B Counting House 5245 or 5126 (Shift Worker)
Hall A Counting House 5501
Hall C Counting House 6000
Hall D Counting House 5504
Hall B System Phone Number On-Call Person
Engineering (757) 748-5048 (cell)
(757) 897-9060 (cell)
Engineering On-Call (primary)
Denny Insley (secondary)
Slow Controls (757) 748-6922 (cell) Nathan Baltzell
Beamline (757) 303-3996 (cell) Eugene Pasyuk
DC (757) 218-4372 (cell)
(757) 748-5048 (cell)
Florian Hauenstein (primary)
Engineering On-Call (secondary)
SVT/MVT/MM (757) 541-7539 (cell)
(757) 753-7769 (cell)
Yuri Gotra (primary)
Rafo Paremuzyan (secondary)
ECAL (757) 810-1489 (cell) Cole Smith
FTOF/CTOF/CND (757) 344-7204 (cell) Daniel Carman
ALERT (757) 329-4844 (cell) Raphael Dupré
HTCC/LTCC (757) 344-7174 (cell) Youri Sharabian
FT (757) 344-1848 (cell) Raffaella De Vita
BAND (757) 310-7198 (cell) Florian Hauenstein
RICH (757) 344-3235 (cell)
(757) 748-6922 (cell)
Christopher Dilks (primary)
Nathan Baltzell (secondary)
DAQ (757) 232-6221 (cell) Sergey Boiarinov
HYDRA (317) 550-9226 (cell) Torri Jeske
Authorized Hall B Solenoid/Torus Operators
Hall B Denny Insley, Morgan Cook, Eugene Pasyuk
Magnet Group Probir Ghosha, Renuka Rajput-Ghoshal
Detector Support Group Brian Eng, Pablo Campero, Tyler Lemon
DC Power Onish Kumar, Sarin Philip
  • Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
  • To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
  • Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.

Click to Edit solely this tab. P.S.: You must click on the top Edit, next to Read, followed by "Save changes" to force the current page to refresh.

Experiment Coordinator: Annalisa D'Angelo

Run Coordinator: Daniel Carman (757) 575-7540

PDL: Daniel Carman (757) 876-1789

Daily RC Meetings

Important Notes

Do NOT change FSD settings without approval from RC or beamline expert!

In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House and inform the Crew Chief and RC.

In case of evacuation of the Counting Room (e.g., due to a fire alarm), grab the shift expert phone and leave the room through the "EXIT" door leading to the parking lot. Do not leave through the hallway! Call the RC once outside so the latter will call MCC to turn the beam OFF to Hall B and inform other Hall B staff members.

If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately to arrange replacements.

Remote shift: If needed, worker shifts can be taken from off-site. Inform the PDL and RC. Also, make sure that you follow the instructions under the "Shift Worker" tab, as you need some lead time to set up!

Note to Shift Takers:

  • Read the ESAD, COO, RSAD, and ERG documents found on the "Current RG-K Run Info" as well as the yellow folder in the counting room. Before you start your first shift on the current experiment, you must sign on the list in the yellow folder. Thereby, you confirm that you have read and understand their content.
  • Read at least the previous 24 hours logbook entries to be aware of recent run details and changes
  • Arrive at least 10 minutes early for shift change
    • If it is your first shift or a shift after a long pause, do shadow an earlier shift for at least 4 hours to familiarize yourself with all shift duties and technicalities of the ongoing experiment.
  • Refresh the run wiki page/tabs; look over it/them every shift
  • Follow the Shift Expert/Worker tab's instructions
  • Do not spend more than 15-20 min trying to fix a problem. In case of any issue, contact the On-call Experts or the RC.

See tab GENERAL INFORMATION for

  • Recent Changes
  • Current Issues
  • Beam Restoration (for beam restoration procedures and Møller runs)

Run Plan: Mar. 10 - Mar. 11, 2024

Production Running ... to the end!!

- DAQ configuration: PROD67, Trigger: rgk_noDC_v1.1_300MeV.trg
- Beam current request: 75 nA
- Run duration: 3 hrs

Note: RG-K run ends on Mar. 11 at 7 a.m.

- Turn all detectors off and put BMT HV in safe mode
- Ramp torus and solenoid to zero field (contact Eugene to do this)
- Call to put Hall B in Restricted Access

Related Information

Find detailed information at tab "GENERAL INFORMATION".

  • The main lights in the Hall (dome lights) and the Forward Carriage lights must be OFF during run time.
  • Orbit locks are on BPMs 2C24A and 2H01 and the locks should generally be on ("Running").
    • Beam positions at 2C24A and 2H01 have to be kept, within ±0.1mm, at the nominal beam positions listed below ("Reference Values").
  • The beam position at 2C21A is not important for production runs but should be stable. Here, significantly drifting positions can indicate instabilities in beam energy.
    • The beam position at 2C21A is important for initial beam tuning (on tagger dump).
  • If HWP is changed, start a new run. The absolute values of the SLM and FCUP charge asymmetry (Q-Asym (%)) should be less than 0.1%.
  • Beam tuning and Møller runs
    • Generally, Detector HV OFF but
    • SVT: LV ON; HV OFF, and MVT: LV ON; HV ON - Safe Voltage
    • Turn DC HV off only for beam tuning

Access to the Hall

  • If you need to enter Hall B, alert Denny Insley (757-897-9060, cell/text: 757-810-9576) and the Run Coordinator (757-575-7540).
  • Check in with the shift personnel before entering the hall.

DAQ Operation & Related Information

NEW STANDARD end and start of the run:

- "End run"
- "Cancel"
- "Reset"
- "Download"
- "Prestart"
- "Go"

This will ensure proper compression of the FADCs and therefore a smaller data rate and perform a RICH recovery.

Restart DAQ

-- when changing configuration or trigger files, when the run did not end correctly, when ROCs are rebooted, or after RICH recovery:
- "Cancel"
- "Reset"
- "Configure"
- "Download"
- "Prestart"
- "Go"
  • Restart DAQ: ensure that each step is completed in the Run Control message window. During "Configure", look for error messages in the ROC terminals.
  • Some ROCs keep printing error messages while functioning properly, see logbook entry # 4215299 .
  • If a ROC is disconnected, the message will appear in the run control message window.
  • If a ROC has crashed.
    • Find out which one (look for busy ROCs)
    • End the current run
    • Issue a roc_reboot command on just that ROC
    • PING the ROC to check that it is back up (some take longer than others)
    • Restart DAQ
  • Pop-up window: Enter the beam current and the type of run in the "Comment" field.
  • At the start and end of a run, check that the data in the Run Condition Data Base (RCDB) is correct, especially the manually filled fields.
  • Check and reset monitoring histograms every hour. Sometimes, it is the only way to know that a specific ROC needs to be rebooted.
  • In case of DAQ Disk space alarm, call the DAQ expert.
  • Contact the DAQ expert if you have any questions or doubts about how to proceed.

Triggers files

rgk_noDC_v1.0_300MeV.trg DC roads are not in the trigger. Hold off time is 3 us.
rgk_noDC_v1.1_300MeV.trg DC roads are not in the trigger. Hold off time is 2 us.
rgk_noDC_v1.2_300MeV.trg DC roads are not in the trigger. Hold off time is 1 us.
rgk_out_v1.1_300MeV.trg Outbending DC roads, Hold off time is 2 us.

Reference Values

FSD Thresholds

  • Upstream: 2 kHz
  • Midstream: 2 kHz
  • Downstream: 100 kHz
  • BOM: 50 kHz
  • 5 ms dwell time

Nominal Beam Positions

2C21A (not important for production)

  • x = -0.4 mm
  • y = +0.7 mm

2C24A

  • x = -1.7 mm
  • y = +0.5 mm

2H01

  • x = -0.7 mm
  • y = +0.6 mm

8.5 GeV Harp Scan References (Feb. 14, 2024)

2C21A: https://logbooks.jlab.org/entry/4252495

Tagger (2C24A): https://logbooks.jlab.org/entry/4252496

2H01: https://logbooks.jlab.org/entry/4252514

6.4 GeV Harp Scan References (Jan. 18, 2024)

2C21A: https://logbooks.jlab.org/entry/4240375

Tagger (2C24A): https://logbooks.jlab.org/entry/4240378

2H01: https://logbooks.jlab.org/entry/4240397

Responsibilities

  • The RC duties are detailed in the COO.
  • Chek the upcoming shifts, and if necessary, coordinate with the PDL to contact shifters about their training and site access status.
  • Remote shifts are listed here.
  • Backup shift personnel is listed here.

Daily

  • Attend the in-person PD/RC and MCC/OPS meetings (7:45 AM and 8 AM Daily). The PD will communicate when and how meetings happen on the weekend.
  • Update the run plan in the Short Term Schedule tab in coordination with the RG-K experiment coordinators (i.e., Annalisa, Daniel) and communicate it to the shift crew.
  • Log the RC summary in the HBLOG.
  • Send a daily invitation for the RC meeting to hallb and clas12_rgk mailing lists.
  • Run the RC meetings at 13:00 in CH Room 200C and on ZOOM, except on Wednesdays.
    • On Wednesdays, the RC meeting is held on Zoom only at 15:00, due to the conflict with the 13:30 MCC meeting and the unavailability of the CH room afterwards.
    • To connect to Zoom in CH Room 200C, follow these steps:
      • Turn on the projector with the white remote control, then log into your CUE account. If not listed yet, click "Not listed?" in the bottom left to add your account.
      • Once logged in, use the recommended Google Chrome to join the ZOOM meeting on the browser or use the ZOOM application.
      • Since the room doesn't have audio, don't connect with the computer audio, but choose "Call Me," then enter the number in the small Cisco answering device. Once it rings, answer the call, and you will be prompted to join the meeting.
      • The room has a camera, which can be turned on via ZOOM.

Weekly

  • Attend the in-person MCC/OPS planning meeting on Wednesdays at 13:30 PM and report the run status via the submitted Run Coordinator Weekly Summary.
    • The report summarizes the data taking status (available beam used (ABU), any beam losses (BANU), CW on target (ABU+ABNU), etc.) from 7 AM on the previous Wednesday to 7 AM on the current Wednesday, in addition to any standing and critical issues, plans for upcoming week, and general comments/requests.
    • The beam time accounting can be retrieved from:
    • Refer to the (is this corect?) RC Timesheet to calculate the percentage of scheduled experiment hours to date.
    • The total experiment data collected to date could be retrieved from the up-to-date "Accumulated Charge" depicted at [1]
  • Attend the Hall B meeting on Mondays at 9 AM and present your summary slides that should be sent beforehand to the Hall B leader, Patrick Achenbach.


Tasks

  • Come to your shift in time for the shift change, 10-15 minutes before the start of your shift.
    • If it is your first shift or a shift after a long pause, please shadow an earlier shift for at least 4 hours to familiarize yourself with all shift duties and technicalities of the ongoing experiment.
  • Follow the Short Term Schedule
    • The RC must be notified before changing run conditions
  • Operate the Data Acquisition
  • Take action on and log alarms
  • Communicate with your co-shift person:
    • Remind them to read the tab 'Shift Worker'.
    • Discuss any issues with the shift worker before making extra logbook entries.
    • Remind the shift worker of the end-of-shift Checklist.
  • Check for and read any comments to log-book entries made during your shift.
  • Keep your shift summary up to date in HBLOG. Record all significant happenings.
    • Refer to relevant logbook entries in the shift summary.
    • Include a run list for the shift with relevant run information.
  • Ensure that all monitoring plots are logged and checked against the reference plots for every single run.
    • Both, you and the shift worker should run MON12 and reset & check spectra frequently.
  • If you have any other questions or uncertainties about what to do, call the RC.


  • If this is still true it should go into the manual: New RICH recovery protocol
    • See https://logbooks.jlab.org/entry/4201728 for important details.
    • There can be issues with missing tiles or the occupancy as seen in MON12. Put screenshots of scalers and temperatures or the occupancy spectra in the RICH logbook. Do not stop an ongoing run, but do the fast recovery between runs.
    • If the issue is seen in the scaler but not in the temperature map of the tiles, then you should do a full recovery; see https://logbooks.jlab.org/entry/4214184. This might preempt the daily full recovery.
    • Daily full RICH recovery remains part of the protocol, preferably done during the daytime and only between runs; do not stop an ongoing run. State in your shift summary that you did the recovery (or why you did not).
    • Avoid unnecessary recoveries, see https://logbooks.jlab.org/entry/4208477. The RICH overview GUI shows how many seconds have passed since the last full recovery. Also, there is a minor alarm when 24 hours have passed since the last full recovery. Acknowledge the alarm and wait for the end of the run before running the recovery.
    • Note that you have to restart the DAQ (cancel-->reset-->configure-->download-->Prestart-->Go); see DAQ Operation under Short Term Schedule, after any RICH recovery.
    • If the beam is ON, and any RICH recovery takes more than 5 min, please call the RICH Expert.


  • If this is still true it should go into the manual: New MVT LV Reboot Procedure
    • See https://logbooks.jlab.org/entry/4217011 for detailed information on rebooting the MVT LV when observing a drop in BMT strip occupancies. In brief, it requires a reboot of LV as follows:
    • Turn LV OFF from MVT Overview->Low Voltage->MVT-All. LV status indicators should change from green to black;
    • Wait 20 seconds, then turn LV back from the same menu;
    • In the alarm handler, with a 2-minute alarm delay, there can be alarm NActiveCrates, status also reported on the MVT Overview GUI. This alarm will be cleared 2 min after LV is turned back ON;
    • At this point, mvt1, mvt2, and mvt3 ROCS can be rebooted;
    • Start a run (Cancel-->Reset-->Configure-->Download-->Prestart-->Go).
    • If the beam is ON, and a reboot process takes more than 5 min, please call the DAQ and/or SVT/MVT/MM expert.


  • Fill out BTA hourly;
    • Accelerator beam time (do not change these values):
      • ABU: acceptable beam used
      • BANU: beam acceptable but not used (should be reflected in our PCC and UED)
      • BNA: beam not acceptable (e.g., tuning, drifting, not focused)
      • ACC: Accelerator Configuration Change (e.g., pass change)
      • OFF: Accelerator is down
    • Experiment beam time (do change these values):
      • ER: Experiment ready (should be 60 minutes - PCC - UED)
      • PCC: Planned configuration change (when the beam is masked while radiators are moved, target change, DAQ (stopping/starting runs, tests, etc.)
      • UED: Unplanned experiment down (hardware failure, DAQ crashes, our problems, ...)
      • Exception: BANU, due to time spent on beam tuning and BPM checks after beam down, should be counted as ER on our side.
    • Enter fields at the "Shift Information" tab.
    • You must save at 7:00, 15:00, and 23:00, to send info to MCC. To see the save button, click 'edit all' or 'edit cc hours.' You can check, https://ace.jlab.org/btm/reports/activity-audit, whether you saved successfully. Not sure this is true?
    • Acknowledge the popup error message about the last hour not being completed by clicking OK.
    • Sign, viz log completed 8-hour sheet.
    • Note: we can change the time sheet up to 48 hours after completion. Still true?

Tasks

  • Come to your shift in time for the shift change, 10-15 minutes before the start of your shift;
    • If it is your first shift or a shift after a long pause, please shadow a previous shift for at least 4 hours to familiarize yourself with all shift duties and technicalities of the ongoing experiment.
  • Discuss any issue with the shift expert before making extra logbook entries; ask the shift expert to note the ongoing issue in the shift summary.

Frequently

  • Reset and check MON12 histograms frequently, preferably each 1/2h
    • Note that some plots have radio buttons at the bottom to choose the sector. Remember to cycle through and check all sectors.

Once per run

  • Submit EPICS screenshots to the HBRUN logbook with beam ON
    • Beamline overview, in VNC or Web Browser
    • CLAS12 trigger rates and DAQ status
  • Upload MON12 monitoring plots to the logbook with sufficient statistics and compare them to the reference and recent uploads (see Monitoring tab).
  • Submit Beam current and position strip charts to the logbook at the end of the run
    • If they are not up already: (CS-Studio → Beamline → Strip Charts)
    • Choose the 'time-span width' to be compatible with the run duration (right-click below x-axis).
    • To make the logbook entry:
- In the blank area within the dotted lines in any chart, right-click, choose "Make Logbook Entry"
- The title of the logbook entry can be changed
- Un-click ELOG, select HBLOG, and click on "Make Entry" to submit

Once per shift

  • Fill the shift checklist;
    • During production, get relevant values from the epics screens Beamline Overview, CLAS12 DAQ Status and CLAS12 Trigger;
    • During extended downtime, get relevant values from the latest EPICS screenshots that you made during production
  • Does this need to be updated?: Upload by the end of the shift while data is being collected clas12online tabs plots to the HBLOG logbook, with sufficient statistics
    • Please refresh the clas12online program at the beginning of your shift in case the previous shift does not do it after uploading the snapshots. Also, do that while the DAQ is running!
    • Note that the program must also be restarted after each DAQ crash!

For Remote Shifts

Please inform the PDL that your shifts will be remote. Remote shifts are listed here

You must test your setup, including Zoom and VNC connections, at least 24 hours before your first shift!


Webcams

EPICS

Accelerator Status
Strip Charts

Data Quality

New; displaying real-time reconstructed vertices & various event topologies



Clas12design.png