Run Group D
Jump to navigation
Jump to search
[edit]
- Shift Documentation
- Phone Numbers
- Short Term Schedule
- Shift Expert
- Shift Worker
- Monitoring
- Useful Links
Shift ScheduleHall B LogbookESAD, COO, RSADShift ChecklistHot CheckoutBeam Time Accounting
|
Manuals |
Procedures |
JLab Logbooks
|
NOTE: All NON-JLab numbers MUST be dialed with (757) area code. When calling from a CH landline, dial "9" first. To call from outside, all 4-digit numbers must be preceded by 757-269
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
CLAS12 Run Group D
Run Coordinator: Lamiaa El Fassi 757 575-7540
PDL: Nathan Baltzell (9-)757 876-1789 , x5902 office
Daily RC Meetings at 14:00: CH Room 200C, and on Zoom: Link, Meeting ID: 1608674253, Passcode: 786506
Important Shift Notes
- In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House
- If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately so that replacements can be arranged.
- Read the logbook and be aware of previous 24 hours
- Arrive at least 10 minutes early for shift change
- Refresh the run wiki pages, look over them every shift.
- Follow the expert/worker shift instructions at the tabs above.
- Communicate with your co-shift person!
- The shift expert should know about and refer to logbook entries in their shift summary
- The shift worker should discuss an issue with the shift expert before making extra logbook entries
Short Term Schedule for the Week from Burgsday, July 17, 2023 -
- Inbending torus field, 5-pass beam on ND3.
- Beam Current: 666 nA
- Run duration: 100M events or 4 hours, whichever comes first.
- CODA Configuration: PROD66
- Trigger file: rgd_300MeV_v1.0.trg
- If HWP is changed, start a new run
Reference Values
FSD Thresholds
- Upstream: 2k Hz
- Midstream: 2 kHz
- Downstream: 10 kHz
- BOM: 1 MHz
- 5 ms dwell time
Harp Scan References from RG-C
- Come to your shift in time for the shift change, 10-15 minutes before the start of your shift.
- Follow the Short Term Schedule as outlined by RC
- Keep shift summary up to date in HBLOG. Record all that happens.
- Ensure that all monitoring plots are logged correctly and checked against the reference plots for every single run, see the "Useful Links" tab above
- Do a RICH recovery once daily during day shift, between runs. Please log in shift summary.
- Fill out BTA hourly.
- Promptly send "Info for MCC" at 7:00, 15:00, and 23:00, and sign it at the end of your shift.
'In case of other questions or uncertainties of what to do, call the RC or PDL
Shift Worker Tasks
- Check the information in the Short Term Schedule and GENERAL INFORMATION, for every shift
- Come to your shift in time for the shift change, 10-15 minutes before the start of your shift.
- Use the HBRUN logbook for automated and run-specific entries and screenshots, see https://logbooks.jlab.org/entry/4048698
Make the following log entries ONCE per run
- Screenshots: submit to logbook only if you capture the information with beam ON
- Beamline Overview, in VNC or Web Browser
- CLAS12 Trigger rates and DAQ status
- Upload monitoring plots to logbook
- Standard spectra (mon12): inspect all monitoring histograms ' and carefully compare them to the corresponding reference histograms: reference, current, and 5 most recent runs, see link under tab Useful Links
- You can choose a different reference run if you are confident what you are doing, the reference numbers refer to logbook entries.
- Standard spectra (mon12): inspect all monitoring histograms ' and carefully compare them to the corresponding reference histograms: reference, current, and 5 most recent runs, see link under tab Useful Links
Once per shift:
- Fill the shift checklist
- Log screen shots of RICH temperature and scaler maps. Log in RICH logbook.
Regularly:
- reset & check spectra frequently (every 30 - 60 minutes)
- Some plots in the online mon12 have a choice of histogram sets per sector, select buttons at the bottom of the plot. That means you have to look at all sectors for these histograms.
- The logbook entry shows all histograms.
- Log the strip charts in time intervals according to the x-axis time span, via right-click on the screen and selecting "Make Elog Entry". Make sure NOT to submit to ELOG.
- Beam current and position strip-charts (CS-Studio -> Beamline -> Strip Charts)
- You can also see beam charts in the Web Browser: Upstream/Midstream Halo Counters, Downstream Halo Counters, Beam Currents, BPM Positions
For REMOTE Shifts (offsite):
- Zoom for 24-7 communication with counting house: https://jlab-org.zoomgov.com/j/1619881100
- Passcode REQUIRED: 927417
- Remind the expert in the counting house to restart their zoom, if necessary
- Remote VNC connection instructions: https://logbooks.jlab.org/entry/3906039
- All necessary applications should be avaible from the desktop menu (left/right click on the desktop)
- EPICS GUIs should be accessed ONLY via the desktop menu or by running clascss-remote.
- Remote Demonstration Video (150 MB)
ATTENTION: If you plan to take (a) remote shift(s), you MUST test your setup (including VNC connection) at least 24 hours before your first shift!
Webcams
|
Manuals |
EPICS on the web
|
Live Monitoring Links
|
Hall-B |
Accelerator |
ZOOM meetings
|