Difference between revisions of "Run Group D"

From clas12-run
Jump to navigation Jump to search
Line 59: Line 59:
 
[https://wiki.jlab.org/clas12-run/index.php?title=Template:PhoneNumbers&action=edit Click Here] to edit Phone Numbers.  Note, you then also have to edit the current page to force a refresh.
 
[https://wiki.jlab.org/clas12-run/index.php?title=Template:PhoneNumbers&action=edit Click Here] to edit Phone Numbers.  Note, you then also have to edit the current page to force a refresh.
  
<!--- JUST MODIFY AND SAVE ANYTHING IN THIS COMMENT BLOCK TO FORCE A REFRESH OF THE PHONE NUMBERS TEMPLATE -->
+
<!--- JUST MODIFY AND SAVE ANYTHING IN THIS COMMENT BLOCK TO FORCE A REFRESH OF THE PHONE NUMBERS TEMPLATE -->
  
 
= Short Term Schedule =
 
= Short Term Schedule =

Revision as of 17:37, 27 February 2023

[edit]

NOTE: All NON-JLab numbers MUST be dialed with (757) area code. When calling from a CH landline, dial "9" first. To call from outside, all 4-digit numbers must be preceded by 757-269

Role Phone Number
Hall B Run Coordinator (757) 575-7540 (cell)
Hall B Physics Division Liaison (757) 876-1789 (cell)
MCC 7048
Crew Chief 7045
Crew Chief (757) 876-3367 (cell)
Program Deputy (757) 876-7997 (cell)
RadCon (757) 876-1743 (cell)
Gate House Guard 5822
Location Phone Number
Hall B Floor 5165
Hall B Space Frame 5170 and 5171
Hall B Forward Carriage 5371
Hall B Gas Shed 7115
Hall B Counting House 5244 (Shift Expert)
Hall B Counting House (757) 329-4846 (Shift Expert cell)
Hall B Counting House 5245 or 5126 (Shift Worker)
Hall A Counting House 5501
Hall C Counting House 6000
Hall D Counting House 5504
Hall B System Phone Number On-Call Person
Engineering (757) 748-5048 (cell)
(757) 897-9060 (cell)
Engineering On-Call (primary)
Denny Insley (secondary)
Slow Controls (757) 748-6922 (cell) Nathan Baltzell
Beamline (757) 303-3996 (cell) Eugene Pasyuk
DC (757) 218-4372 (cell)
(757) 748-5048 (cell)
Florian Hauenstein (primary)
Engineering On-Call (secondary)
SVT/MVT/MM (757) 541-7539 (cell)
(757) 753-7769 (cell)
Yuri Gotra (primary)
Rafo Paremuzyan (secondary)
ECAL (757) 810-1489 (cell) Cole Smith
FTOF/CTOF (757) 344-7204 (cell) Brandon Tumeo
CND (757) 329-4844 (cell) Pierre Chatagnon
HTCC/LTCC (757) 344-7174 (cell) Youri Sharabian
FT (757) 344-1848 (cell) Raffaella De Vita
BAND (757) 310-7198 (cell) Florian Hauenstein
RICH (757) 344-3235 (cell)
(757) 748-6922 (cell)
Christopher Dilks (primary)
Nathan Baltzell (secondary)
DAQ (757) 232-6221 (cell) Sergey Boiarinov
HYDRA (317) 550-9226 (cell) Torri Jeske
Cryotarget (757) 218-2266 (cell)
(757) 871-5374 (cell)
(757) 897-1415 (cell)
(757) 746-9277 (cell)
Xiangdong Wei (first)
James Brock (second)
James Maxwell (third)
Chris Keith (fourth)
RG-E Solid Target (757) 344-1848 (cell) Milan Ungerer
Authorized Hall B Solenoid/Torus Operators
Hall B Denny Insley, Morgan Cook, Eugene Pasyuk
Magnet Group Probir Ghosha, Renuka Rajput-Ghoshal
Detector Support Group Brian Eng, Pablo Campero, Tyler Lemon
DC Power Onish Kumar, Sarin Philip
  • Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
  • To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
  • Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.

Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.


CLAS12 Run Group D

Run Coordinator: Lamiaa El Fassi 757 575-7540

PDL: Nathan Baltzell (9-)757 876-1789 , x5902 office

Daily RC Meetings at 14:00: CH Room 200C, and on Zoom: Link, Meeting ID: 1608674253, Passcode: 786506

Run Coordinator Schedule

Important Shift Notes

  • In case of medical or fire emergency, call 9-911 from a LANDLINE phone in the Counting House
  • If you have symptoms or a positive COVID test, do NOT come to your shift - instead, inform the PDL and the RC and JLab medical services immediately so that replacements can be arranged.
  • Read the logbook and be aware of previous 24 hours
  • Arrive at least 10 minutes early for shift change
  • Refresh the run wiki pages, look over them every shift.
  • Follow the expert/worker shift instructions at the tabs above.
  • Communicate with your co-shift person!
    • The shift expert should know about and refer to logbook entries in their shift summary
    • The shift worker should discuss an issue with the shift expert before making extra logbook entries

Short Term Schedule for the Week from Burgsday, July 17, 2023 -

  • Inbending torus field, 5-pass beam on ND3.
  • Beam Current: 666 nA
  • Run duration: 100M events or 4 hours, whichever comes first.
  • CODA Configuration: PROD66
  • Trigger file: rgd_300MeV_v1.0.trg
  • If HWP is changed, start a new run

Reference Values

FSD Thresholds

  • Upstream: 2k Hz
  • Midstream: 2 kHz
  • Downstream: 10 kHz
  • BOM: 1 MHz
  • 5 ms dwell time

Harp Scan References from RG-C


  • Come to your shift in time for the shift change, 10-15 minutes before the start of your shift.
  • Follow the Short Term Schedule as outlined by RC
  • Keep shift summary up to date in HBLOG. Record all that happens.
  • Ensure that all monitoring plots are logged correctly and checked against the reference plots for every single run, see the "Useful Links" tab above
  • Do a RICH recovery once daily during day shift, between runs. Please log in shift summary.
  • Fill out BTA hourly.
    • Promptly send "Info for MCC" at 7:00, 15:00, and 23:00, and sign it at the end of your shift.

'In case of other questions or uncertainties of what to do, call the RC or PDL

Shift Worker Tasks

  • Check the information in the Short Term Schedule and GENERAL INFORMATION, for every shift
  • Come to your shift in time for the shift change, 10-15 minutes before the start of your shift.
  • Use the HBRUN logbook for automated and run-specific entries and screenshots, see https://logbooks.jlab.org/entry/4048698


Make the following log entries ONCE per run

  • Screenshots: submit to logbook only if you capture the information with beam ON
    • Beamline Overview, in VNC or Web Browser
    • CLAS12 Trigger rates and DAQ status
  • Upload monitoring plots to logbook
    • Standard spectra (mon12): inspect all monitoring histograms ' and carefully compare them to the corresponding reference histograms: reference, current, and 5 most recent runs, see link under tab Useful Links
      • You can choose a different reference run if you are confident what you are doing, the reference numbers refer to logbook entries.

Once per shift:

  • Fill the shift checklist
  • Log screen shots of RICH temperature and scaler maps. Log in RICH logbook.

Regularly:

  • reset & check spectra frequently (every 30 - 60 minutes)
    • Some plots in the online mon12 have a choice of histogram sets per sector, select buttons at the bottom of the plot. That means you have to look at all sectors for these histograms.
    • The logbook entry shows all histograms.
  • Log the strip charts in time intervals according to the x-axis time span, via right-click on the screen and selecting "Make Elog Entry". Make sure NOT to submit to ELOG.
    • Beam current and position strip-charts (CS-Studio -> Beamline -> Strip Charts)

For REMOTE Shifts (offsite):

ATTENTION: If you plan to take (a) remote shift(s), you MUST test your setup (including VNC connection) at least 24 hours before your first shift!

Webcams

Manuals

EPICS on the web

Live Monitoring Links



Clas12design.png