Difference between revisions of "Magnet"
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
== Sweeper assembly and Preparation Plan == | == Sweeper assembly and Preparation Plan == | ||
+ | * [https://wiki.jlab.org/cuawiki/images/2/23/Preparation_plan.txt Draft of the magnet preparation plan/Field mapping concept] | ||
* [https://wiki.jlab.org/cuawiki/images/e/ec/67508-00002_S1_R-_SWEEPER_ASSY.pdf Sweeping magnet assembly view] | * [https://wiki.jlab.org/cuawiki/images/e/ec/67508-00002_S1_R-_SWEEPER_ASSY.pdf Sweeping magnet assembly view] | ||
− | * [https://wiki.jlab.org/cuawiki/images/ | + | * [https://wiki.jlab.org/cuawiki/images/5/55/Sweeper-dimensions.pdf top view, dimensions as required for NPS experiments] |
== Main Coil == | == Main Coil == | ||
Line 23: | Line 24: | ||
* TOSCA source file | * TOSCA source file | ||
− | |||
* TOSCA field results. Grid X -1cm, Y -3cm, Z -3cm. With Z=0 at 157 cm downstream of target, X=0 at small angle side of the magnet gap as shown in figure SAM_coordinates.png | * TOSCA field results. Grid X -1cm, Y -3cm, Z -3cm. With Z=0 at 157 cm downstream of target, X=0 at small angle side of the magnet gap as shown in figure SAM_coordinates.png | ||
::* [https://wiki.jlab.org/cuawiki/images/3/36/SAM_model_coordinates.png top view of the TOSCA model (along Y)] | ::* [https://wiki.jlab.org/cuawiki/images/3/36/SAM_model_coordinates.png top view of the TOSCA model (along Y)] | ||
− | |||
− | |||
− | |||
* [https://wiki.jlab.org/cuawiki/images/5/5b/SAM_6.3deg.png top view for beam line] | * [https://wiki.jlab.org/cuawiki/images/5/5b/SAM_6.3deg.png top view for beam line] | ||
− | |||
* [https://wiki.jlab.org/cuawiki/images/f/fb/Field_beam_6.3deg.png field on the beam line for 6.3 degree NPS position] | * [https://wiki.jlab.org/cuawiki/images/f/fb/Field_beam_6.3deg.png field on the beam line for 6.3 degree NPS position] | ||
− | |||
* [https://wiki.jlab.org/cuawiki/images/0/0a/Field_gap_6.3deg.png field in the main gap for 6.3 degree NPS position] | * [https://wiki.jlab.org/cuawiki/images/0/0a/Field_gap_6.3deg.png field in the main gap for 6.3 degree NPS position] | ||
Revision as of 19:06, 12 April 2017
Sweeper assembly and Preparation Plan
- Draft of the magnet preparation plan/Field mapping concept
- Sweeping magnet assembly view
- top view, dimensions as required for NPS experiments
Main Coil
Corrector Coil
Yoke
Field calculcations
- TOSCA source file
- TOSCA field results. Grid X -1cm, Y -3cm, Z -3cm. With Z=0 at 157 cm downstream of target, X=0 at small angle side of the magnet gap as shown in figure SAM_coordinates.png
- top view for beam line
- field on the beam line for 6.3 degree NPS position
- field in the main gap for 6.3 degree NPS position
Other Updates
- README instructions for using the code (Gabi)
- Compared to the original version slide #14 has been corrected: The beam deflection angle is much smaller than was shown before and also added a comment about the downstream shielding of the beam line. The original version from 30 July 2015 can be found here
- The coordinate system is based on the magnet, so the target center has the coordinates x = 15 cm, y = 0 cm, z = 157 cm. The beam going to the negative z, positive x at the angle -2.2 degree. The center of the calorimeter is in the direction +4.1 degree from the target.