EPSCI Group Meeting Apr. 19, 2021
Jump to navigation
Jump to search
The meeting time is 10:00am.
Connection Info:
You can connect using BlueJeans Video conferencing (ID: 253 300 597). (Click "Expand" to the right for details -->):
Meeting URL https://bluejeans.com/253300597?src=join_info Meeting ID 253 300 597 Want to dial in from a phone? Dial one of the following numbers: +1.888.240.2560 (US Toll Free) (see all numbers - https://www.bluejeans.com/premium-numbers) Enter the meeting ID and passcode followed by # Connecting from a room system? Dial: bjn.vc or 199.48.152.152 and enter your meeting ID & passcode
Agenda:
- Previous meeting
- Announcements
- Theory Seminar @1pm: Simulating and unfolding LHC events with generative networks (bluejeans)
- Fortnight paper for May. 1st: HEP-Frame: Improving the efficiency of pipelined data transformation & filtering for scientific analyses
- Review expectations
- Conferences and Workshops
- Autonomous Discovery in Science and Engineering workshop (April 20-22)
- vCHEP2021 (May 17-21)
- Thomas, Kishan: Hydra
- Vardan, Nathan, David (+Hall-B, Fast Electronics, and TriDAS groups): TriDAS + JANA2 SRO
- David: HOSS!
- ACAT2021 (Nov. 29 - Dec. 3)
- Ongoing Activities
- Scientific Software support
- JLab Common Environment (CE) + SPACK
- ServiceNow (mapmanager, fputil, fpack, bos, bankdef)
- EIC
- Offline frameworks (CLARA, JANA2)
- JLab Common Environment (CE) + SPACK
- EJFAT (ESnet/JLab + FPGA +Accelerated Transport)
- Status of proposal
- DAQ systems
- SRO
- SAMPA + ERSAP + JANA2 + INDRA-ASTRA = ?
- CODA (CODA3 support, EVIO-6)
- SRO
- A.I.
- Experimental Controls
- Multiple FOAs + JLab LDRD
- Collaboration with Theory on MCGen project DE-FOA-0002493
- Collaboration with BNL on AI scheduling DE-FOA-0002482
- Collaboration with INDRA-ASTRA
- Collaboration with Sergey F. on AI + FPGA
- Surrogate Models proposal (NP, ASCR, LDRD?)
- Amplitude Analysis Inverse Problem (LDRD)
- Jupyterhub + GPU
- Offsite Computing
- NERSC, PSC, IU
- XSEDE application for PSC bridges-2 resubmitted
- OSG
- NERSC, PSC, IU
- Scientific Software support
- AOT
Minutes:
Attendees: David L., Nathan B., Kishan R., Vardan G., Thomas B., Mike G., Torri J., Graham H.
- Licenses
- CLion licenses expired. Quote for renewal received and is in the works.
- GitKraken licenses recently auto-renewed. It seems only 2 people may use GitKraken occasionally. (David will check on adjusting licenses)
- Overleaf licenses are expiring. Will like go to purchasing individual licenses since it does not look like enough use to justify a site license.
- EIC
- Nathan has been working with Sylvester and Whit at ANL to understand their GAUDI-based software in order to gauge how difficult it will be to port it into JANA2
- Fairly complex CI system using Docker to build their software
- Most of their Docker images not accessible outside ANL. One image copied to dockerhub for Nathan to work with
- GAUDI uses a "gaudi cmake" that deviates from standard cmake so some effort is required to move to a standard cmake build system
- One goal is to get a document on migrating from GAUDI to JANA2 that we can post on the JANA2 website.
- Communication from Pukai's mentor listing several issues with eJANA. These mostly appear to be things on Dmitry's side.
- Nathan has been working with Sylvester and Whit at ANL to understand their GAUDI-based software in order to gauge how difficult it will be to port it into JANA2
- CLARA
- New version released for use by CLAS12
- Includes fix for bug that caused rare occurrences where a file was only partially processed
- New version released for use by CLAS12
- JANA2
- Nathan working to integrate JANA2 and CLARA (i.e. ERSAP).
- EJFAT
- Met several times with ESnet for low-level design discussions
- ESnet presented us with what looks to be a complete design for phase-I
- A single U280 is needed for phase-I with some load balancing handled by that which is already integrated into the switches
- Mike will look into putting a PR in for the U280 (will need to learn the JLab procurement system)
- Existing switches at JLab may not support protocols needed by ESnet software. Dave A. is looking into what we need to purchase.
- ESnet cannot start work on FPGA software development until May 15th so delivery not expected until maybe July.
- SRO
- Contacted Ed J. about SAMPA setup in INDRA lab
- Gas bottle for GEM changed last week. Needed to flow for a couple of days before turning on HV
- Ed will go in Thurs. or Fri. to power system up. Vardan volunteered to help if needed.
- VTP testing now includes Data Lakes
- Increased resident memory usage to 22GB
- Slight decrease in CPU usage to around 13 cores
- Vardan working on JAVA bindings in ERSAP
- Contacted Ed J. about SAMPA setup in INDRA lab
- CODA
- Dave A. is working on presenting data read from the VTP as a ROC to the standard CODA system
- This requires updates to jcedit which Vardan is working on
- This will be deployed as part of CODA 3.11
- Will be for triggered mode only (SRO support will not be included yet)
- Dave A. is working on presenting data read from the VTP as a ROC to the standard CODA system
- AI Experimental Controls
- Torri able to run GlueX CDC calibration codes on farm
- Naomi suggested several tasks involving GARFIELD to allow calculation related to pressure changes
- Suggestion was made to build GARFIELD in central location on the CUE (with spack)
- FOAs + LDRD
- 3 ASR, 1 NP, and 1 LDRD
- Graham listed our involvement in several of these:
- Accelerator operations: Chris T. and Malachi S.
- Modeling computation and predicting data flows (smart data center): BNL + JLab
- MCGen : Nobuo + ANL
- Data reduction/Filtering: JLab + ORNL + GA Tech
- EJFAT (different funding channel): JLab + ESnet
- LDRD proposals
- Thomas noted pre-proposal template is short and due May 5th. Full proposals due at end of May.
- Amplitude Analysis: Thomas
- Surrogate Models: Kishan, David ,...
- Offsite Computing
- GlueX proposal to XSEDE for time on PSC Bridges-2 submitted
- OSG
- Operations improved after unmounting lustre and home from scosg16
- scosg20 up, but not in production use yet
- MCWrapper: Thomas working on bundling similar jobs which has the potential of speeding up the submit times by factors of 20-40.