SRO RTDP Nov. 13, 2023
The current weekly meeting time is every other Monday at 10:00 US/Eastern
Connection Info:
You can connect using ZOOM Video conferencing (ID: 160 248 4178). (Click "Expand" to the right for details -->):
One tap mobile: US: +16692545252,,1602484178# or +16468287666,,1602484178#
Meeting URL: https://jlab-org.zoomgov.com/j/1602484178?pwd=UFViZUpyODYrZmsxdkVNbWZTMUR1Zz09&from=addon
Meeting ID: 160 248 4178
Passcode: 104412
Join by Telephone
For higher quality, dial a number based on your current location.
Dial: +1 669 254 5252 US (San Jose)
+1 646 828 7666 US (New York)
+1 646 964 1167 US (US Spanish Line)
+1 551 285 1373 US (New Jersey)
+1 669 216 1590 US (San Jose)
+1 415 449 4000 US (US Spanish Line)
833 568 8864 US Toll-free
Meeting ID: 160 248 4178
International numbers
Join from an H.323/SIP room system
H.323: 161.199.138.10 (US West)
161.199.136.10 (US East)
Meeting ID: 160 248 4178
Passcode: 104412
SIP: 1602484178@sip.zoomgov.com
Passcode: 104412
One tap mobile: US: +16692545252,,1601987443# or +16468287666,,1601987443#
Meeting URL: https://jlab-org.zoomgov.com/j/1601987443?pwd=bUVPV3puTHJPU0Fub2Q2Z1dsV0JjQT09&from=addon
Meeting ID: 160 198 7443
Passcode: 607906
Agenda:
- Previous Meeting
- Announcements:
- No more meetings until Dec. 11
- FTE shifting
- BDX Experiment
- Milestone Progress: (Github Project)
- M01: Create prototype ERSAP configurations for INDRA and CLAS12 test systems (Ayan)
- M02: Identify or capture SRO formatted data from CLAS12 and INDRA test systems with data tag/filtering capability (output data ready for further offline processing) (Discussion w/ Sergey)
- M03: Evaluate existing solutions for configuring and launching remote distributed processes (Jeng, Cissie)
- M04: Establish code repository(s), project site, and method of documentation (Jeng, Ayan)
- M01: Create prototype ERSAP configurations for INDRA and CLAS12 test systems (Ayan)
- AOT
Minutes
Attendees: David L., Vardan G., Ayan R., Jeng T., Cissie M., Marco B., Mariangela B.
- Charge times:
- Ayan and Jeng's nominal charge times for the project were changed from 75%/25% to 100%/0% for the time being until a congressional appropriation is made that will supply funds to the AIOP project. David/Vardan/Cissie will remain at 10%/25%/25%
- BDX: Marco gave an overview on some planning items for the BDX experiment
- Patrick (Hall-B leader) says PRAD electronics can be loaned to BDX for testing purposes. This includes 5 VXS crates that will have 256 readout channels each. Each will be used for a different BDX "module" which consists of 200 CsI blocks and 56 channels for plastic scintillator.
- These are expected next Fall (~1 year from now)
- Initial plan is to use single crate to stream data from prototype.
- Ayan update:
- Code now exists that can be used with ERSAP to move binary file(s) around.
- An ERSAP actor written in Java already exists that serves as an example of accessing config. parameters that ERSAP read from the YAMAL file.
- This currently is on a branch in the ERSAP repository but we decided it would be better to move it to the SRO-RTDP repository. Ayan will take care of that.
- Some work has started on the C++ actor. Some issues came up and Ayan is in communication with Vardan about fixing them.
- Cissie update:
- Added rtdp.py to repository. Did round of review with David and is now merged into main.
- Did some preliminary work on generating documentation with Sphinx. This is on a branch in the SRO-RTDP repository at the moment.
- Started looking at visualizations for ERSAP configurations in YAML form. This will include drawing a flowchart. She will need to understand ERSAP better to do this though.
- Jeng update:
- Looked into the SuperFacility API and realtime QoS at NERSC
- Discussion on Github (#17)
- David update:
- Spoke with Chris Cuevas, Fast Electronics Group Lead, about firmware update for DCRB boards to support streaming. He will speak with Ben Raydo to determine schedule constraints.
- Discussed getting exploratory allocation on NERSC for RTDP
- Vardan noted that EJFAT testing has special arrangement with collaborators there to use Debbie Bard's project which we could potentially also use.
- Cissie will look into submitting allocation request.
Action Items
- Submit exploratory allocation request at NERSC - Cissie, David
(from 11/6)Investigate use of realtime queue at NERSC- Jeng(from 11/6)Investigate the Superfacility API at NERSC- Cissie(from 10/26) Understand how to retrieve ERSAP config. parameters from within actor- Ayan(from 10/26) Ask Chris/Ben about schedule for SRO capable DCRB firmware- DavidUpdate test plan schedule to reflect new accelerator pass change schedule- FabioReview [document on distributed process launching technologies- All