== Bring beam to FC: == | == Bring beam to FC: == | ||
# '''Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA. Before moving forward with 2H02A harp scans and beam profile tune, make sure orbit lock is engaged at positions on 2H00(X=0.00,Y=0.00) and on 2H02(X=-1.00,Y=-0.85). ''' | # '''Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA. Before moving forward with 2H02A harp scans and beam profile tune, make sure orbit lock is engaged at positions on 2H00(X=0.00,Y=0.00) and on 2H02(X=-1.00,Y=-0.85). ''' | ||
− | # '''<font color=red> Important Note: Before bringing beams to the FC, be sure that the SVT and ECal are off, the SVT fully retracted, the target out, and the 2.82 mm SVT collimator is in. All beam studies should be done in these conditions with beam currents of | + | # '''<font color=red> Important Note: Before bringing beams to the FC, be sure that the SVT and ECal are off, the SVT fully retracted, the target out, and the 2.82 mm SVT collimator is in. All beam studies should be done in these conditions with beam currents of 30 nA.</font>''' |
# Establish beam to the Faraday cup following the "General Guidelines" on the right. The required beam profile at 2H02A harp is: X-width <~0.25 mm, Y-width <~ 0.050 mm, and the tilt angle <15 degrees. The spot on the Chromax viewer should be close to x=-2mm, y=-5mm. | # Establish beam to the Faraday cup following the "General Guidelines" on the right. The required beam profile at 2H02A harp is: X-width <~0.25 mm, Y-width <~ 0.050 mm, and the tilt angle <15 degrees. The spot on the Chromax viewer should be close to x=-2mm, y=-5mm. | ||
# Restore ECal and Trigger | # Restore ECal and Trigger | ||
Line 122: | Line 122: | ||
#*# ''main scaler screen'' | #*# ''main scaler screen'' | ||
#*# ''ecal scaler gui'' | #*# ''ecal scaler gui'' | ||
− | #*# ''trigger rate gui'' (requires DAQ Prestarted with <tt> | + | #*# ''trigger rate gui'' (requires DAQ Prestarted with <tt>v8_200nA.trg</tt>) |
− | #*#* Dead time should be ~ | + | #*#* Dead time should be >~90% |
− | #*#* Total Trigger rate should be ~ | + | #*#* Total Trigger rate should be ~20 kHz. |
# SVT Setting (call SVT expert in) | # SVT Setting (call SVT expert in) | ||
#* If beams are stable, SVT expert moves SVT to 1.0 and then 0.5 mm | #* If beams are stable, SVT expert moves SVT to 1.0 and then 0.5 mm | ||
Line 190: | Line 190: | ||
#** Width on 2C21 should be <~0.1+/-0.05 mm | #** Width on 2C21 should be <~0.1+/-0.05 mm | ||
#** Width on tagger harp (2C24) <~0.35 +/- 0.1mm | #** Width on tagger harp (2C24) <~0.35 +/- 0.1mm | ||
− | |||
#* Halo counters UPS-L/R and TAG-L/T/T2 should be ~few Hz/nA [https://logbooks.jlab.org/entry/3376736] | #* Halo counters UPS-L/R and TAG-L/T/T2 should be ~few Hz/nA [https://logbooks.jlab.org/entry/3376736] | ||
<!-- # <b> While MCC degausses the tagger magnet, verify that chicane is ON</b> | <!-- # <b> While MCC degausses the tagger magnet, verify that chicane is ON</b> | ||
Line 202: | Line 201: | ||
#* The first time sending beam to the Faraday cup after the hall is closed, page the SVT expert. | #* The first time sending beam to the Faraday cup after the hall is closed, page the SVT expert. | ||
# ''' Send beam to the Faraday cup ''' | # ''' Send beam to the Faraday cup ''' | ||
− | #* Follow the instructions under "Procedures" on the documentation tab for "Beamline"[https://wiki.jlab.org/hps-run/images/e/e6/HPS_beamline_comm.pdf] to establish beam to the electron dump. <b> Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be | + | <!-- #* Follow the instructions under "Procedures" on the documentation tab for "Beamline"[https://wiki.jlab.org/hps-run/images/e/e6/HPS_beamline_comm.pdf] to establish beam to the electron dump. --> |
+ | #<b> Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA.</b> | ||
#* Ask MCC to establish 50 nA beam with <font color=red>HPS</font> orbit locks on (We need '''HallBHPSOrb''' not '''HallBOrb''' configuration). <b>For orbit lock positions on <font color=red>2H00(X=0.00,Y=0.00) and on 2H02(X=-1.00,Y=-0.85). Use the 2.82 mm SVT collimator. </font></b>. | #* Ask MCC to establish 50 nA beam with <font color=red>HPS</font> orbit locks on (We need '''HallBHPSOrb''' not '''HallBOrb''' configuration). <b>For orbit lock positions on <font color=red>2H00(X=0.00,Y=0.00) and on 2H02(X=-1.00,Y=-0.85). Use the 2.82 mm SVT collimator. </font></b>. | ||
#* Tune beam profile at HPS using measured widths on 2H02A harp. The required beam profile at 2H02A harp is: X-width <~0.25 mm, Y-width <~ 0.10 mm for commissioning, and Y-width ~0.05 for physics running, and the tilt angle <15 degrees. | #* Tune beam profile at HPS using measured widths on 2H02A harp. The required beam profile at 2H02A harp is: X-width <~0.25 mm, Y-width <~ 0.10 mm for commissioning, and Y-width ~0.05 for physics running, and the tilt angle <15 degrees. |
Revision as of 14:14, 1 April 2016
[edit]
Spring 2016 @ 2 GeV:
Spring 2015 Final @ 1 GeV:
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingRun Spreadsheet 2016, 2015 |
Procedures
|
Manuals |
JLab Logbooks
|
HPS 2016 run, February 4 to April 25, Weekends Only
Shifts are manned from Friday 2pm to Monday 7am
Beam energy 2.3 GeV (1 pass)
Important: Document all your work in the logbook!
RC: Stepan Stepanyan
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Harut Avakian
Run Plan for April 1 - 25, 2016 (every weekend):Start close-up of the Hall at 3pm on Friday, April 1
When hall is closed, and regular shifts began, turn on the chicaneEstablish beam to the tagger dump
Bring beam to FC:
Important Notes:
SVT RECOVERY PROCDURES |
General Instructions:DAQ RECOVERYIf DAQ crashed/broken:
Locking up the hall on Fridays
Establishing Acceptable Beam Conditions:
|
Every Shift:
|
Every Run:
|
---|
.
|
|
|
.
Webcams:
|
Accelerator: |
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 541-7539 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5126, 5244, 5246, 5247 |
Hall-B Gas Shed | 7115 |