Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 93: | Line 93: | ||
<font size=3>[https://bluejeans.com/573852742 Bluejeans for Run Meetings on Thursdays and Fridays at 2pm]</font></center> | <font size=3>[https://bluejeans.com/573852742 Bluejeans for Run Meetings on Thursdays and Fridays at 2pm]</font></center> | ||
− | == RC: | + | == RC: Rafayel Paremuzyan == |
* (757) 575-7540 | * (757) 575-7540 | ||
* 9 575 7540 from Counting Room | * 9 575 7540 from Counting Room | ||
Line 202: | Line 202: | ||
#* Pay attention into following corrector values: 2C22H, 2C23V, 2H00H, 2H00V, Compare them to ones that are in [https://logbooks.jlab.org/entry/3394957]. Make sure their values doesn't differ more than 100%. If there is a such difference, tell MCC about this. | #* Pay attention into following corrector values: 2C22H, 2C23V, 2H00H, 2H00V, Compare them to ones that are in [https://logbooks.jlab.org/entry/3394957]. Make sure their values doesn't differ more than 100%. If there is a such difference, tell MCC about this. | ||
# ''' Send beam to the Faraday cup ''' | # ''' Send beam to the Faraday cup ''' | ||
+ | #* If the beam optics is correct, then you should immediately see the beam spot on the Downstream Viewer and beam position and on 2H00 and 2H02 BPMS. | ||
+ | #* If you don't see it immediately, and rates on halo counters are more than 100 Khz, then ask MCC, to change to pulsed (tune mode) beam, and ask to put corrector values. At this point don't accept any CW beam, until beam spot is visible on Downstream Viewer. | ||
<!-- #* Follow the instructions under "Procedures" on the documentation tab for "Beamline"[https://wiki.jlab.org/hps-run/images/e/e6/HPS_beamline_comm.pdf] to establish beam to the electron dump. --> | <!-- #* Follow the instructions under "Procedures" on the documentation tab for "Beamline"[https://wiki.jlab.org/hps-run/images/e/e6/HPS_beamline_comm.pdf] to establish beam to the electron dump. --> | ||
<b> Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA.</b> | <b> Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA.</b> |
Revision as of 15:55, 8 April 2016
[edit]
Spring 2016 @ 2 GeV:
Spring 2015 Final @ 1 GeV:
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingRun Spreadsheet 2016, 2015 |
Procedures
|
Manuals |
JLab Logbooks
|
HPS 2016 run, February 4 to April 25, Weekends Only
Shifts are manned from Friday 2pm to Monday 7am
Beam energy 2.3 GeV (1 pass)
Important: Document all your work in the logbook!
RC: Rafayel Paremuzyan
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Harut Avakian
Run Plan for April 1 - 25, 2016 (every weekend):Start close-up of the Hall at 3pm on Friday, April 1
When hall is closed, and regular shifts began, turn on the chicaneEstablish beam to the tagger dump
Bring beam to FC:
Important Notes:
SVT RECOVERY PROCDURES |
General Instructions:DAQ RECOVERYIf DAQ crashed/broken:
Locking up the hall on Fridays
Establishing Acceptable Beam Conditions:
Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA.
|
Every Shift:
|
Every Run:
|
---|
.
|
|
|
.
Webcams:
|
Accelerator: |
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 541-7539 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5126, 5244, 5246, 5247 |
Hall-B Gas Shed | 7115 |