Line 111: | Line 111: | ||
# Log screenshots of the ECal and main HPS scaler screens for reference when beam is established at the tagger | # Log screenshots of the ECal and main HPS scaler screens for reference when beam is established at the tagger | ||
== Bring beam to FC: == | == Bring beam to FC: == | ||
− | # '''Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA. Before moving forward with 2H02A harp scans and beam profile tune, make sure orbit lock is engaged at positions on 2H00(X=0.00,Y=0.00) and on 2H02(X=-1. | + | # '''Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA. Before moving forward with 2H02A harp scans and beam profile tune, make sure orbit lock is engaged at positions on 2H00(X=0.00,Y=0.00) and on 2H02(X=-1.1,Y=-1.). ''' |
# '''<font color=red> Important Note: Before bringing beams to the FC, be sure that the SVT and ECal are off, the SVT fully retracted, the target out, and the 2.82 mm SVT collimator is in. All beam studies should be done in these conditions with beam currents of 30 nA.</font>''' | # '''<font color=red> Important Note: Before bringing beams to the FC, be sure that the SVT and ECal are off, the SVT fully retracted, the target out, and the 2.82 mm SVT collimator is in. All beam studies should be done in these conditions with beam currents of 30 nA.</font>''' | ||
# Establish beam to the Faraday cup following the "General Guidelines" on the right. The required beam profile at 2H02A harp is: X-width <~0.25 mm, Y-width <~ 0.050 mm, and the tilt angle <15 degrees. The spot on the Chromax viewer should be close to x=-2mm, y=-5mm. Also make sure that Harp scans reproduce recent mean values of Beam X and and Y [https://logbooks.jlab.org/entry/3388464]. Vertically should be within 50 um match, horizontally 300 um should be enough. | # Establish beam to the Faraday cup following the "General Guidelines" on the right. The required beam profile at 2H02A harp is: X-width <~0.25 mm, Y-width <~ 0.050 mm, and the tilt angle <15 degrees. The spot on the Chromax viewer should be close to x=-2mm, y=-5mm. Also make sure that Harp scans reproduce recent mean values of Beam X and and Y [https://logbooks.jlab.org/entry/3388464]. Vertically should be within 50 um match, horizontally 300 um should be enough. |
Revision as of 11:07, 10 April 2016
[edit]
Spring 2016 @ 2 GeV:
Spring 2015 Final @ 1 GeV:
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingRun Spreadsheet 2016, 2015 |
Procedures
|
Manuals |
JLab Logbooks
|
HPS 2016 run, February 4 to April 25, Weekends Only
Shifts are manned from Friday 2pm to Monday 7am
Beam energy 2.3 GeV (1 pass)
Important: Document all your work in the logbook!
RC: Rafayel Paremuzyan
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Harut Avakian
Run Plan for April 1 - 25, 2016 (every weekend):Start close-up of the Hall at 3pm on Friday, April 1
When hall is closed, and regular shifts began, turn on the chicaneEstablish beam to the tagger dump
Bring beam to FC:
Important Notes:
SVT RECOVERY PROCDURES |
General Instructions:DAQ RECOVERYIf DAQ crashed/broken:
Locking up the hall on Fridays
Establishing Acceptable Beam Conditions:
Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA.
|
Every Shift:
|
Every Run:
|
---|
.
|
|
|
.
Webcams:
|
Accelerator: |
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 541-7539 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5126, 5244, 5246, 5247 |
Hall-B Gas Shed | 7115 |