== Start close-up of the Hall on Friday, June 14, swing, when everyone is out and MCC is ready to sweep the Hall == | == Start close-up of the Hall on Friday, June 14, swing, when everyone is out and MCC is ready to sweep the Hall == | ||
− | * If MCC is not ready to send beam to Hall-B, keep the hall in control access for people still doing work on detectors. | + | * If MCC is not ready to send a beam to Hall-B, keep the hall in control access for people still doing work on detectors. |
<!-- == When hall enters Beam Permit, [https://wiki.jlab.org/hps-run/images/c/cd/Chicane_controls.pdf turn on the chicane]== --> | <!-- == When hall enters Beam Permit, [https://wiki.jlab.org/hps-run/images/c/cd/Chicane_controls.pdf turn on the chicane]== --> | ||
== Establish beam to the tagger dump == | == Establish beam to the tagger dump == | ||
# See "General Instructions" on the right for details | # See "General Instructions" on the right for details | ||
− | # Log screenshots of the ECal and main HPS scaler screens for reference when beam is established at the tagger | + | # Log screenshots of the ECal and main HPS scaler screens for reference when the beam is established at the tagger |
− | == Bring beam to FC: == | + | == Bring beam to FC (for the first time this must be done with beamline expert): == |
− | # '''<font color=red> Important Note: Before bringing beams to the FC, make sure that the SVT, Hodoscope and ECal are off, SVT is fully retracted, the target is out. </font>''' | + | # '''<font color=red> Important Note: Before bringing beams to the FC, make sure that the SVT, Hodoscope, and ECal are off, SVT is fully retracted, the target is out. If it is the very first time, collimator position is unknown and should be retracted.</font>''' |
− | #''' | + | # '''Ask for 10 nA beam. When the beam sent to FC, it should be clearly visible on the downstream viewer. The halo counter rates downstream of the HPS, SHPS-SC and HPS-T should be more than10s of kHz. All upstream halo counters must be in the range of <100Hz.''' |
− | # '''Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA. Before moving forward with 2H02A harp scans and beam profile tune, make sure orbit lock is engaged at positions on 2H00(X=0.00,Y=0.00) and on 2H02(X=-1.1,Y=-1.). ''' | + | #'''the 2.82 mm SVT collimator is in. All beam studies should be done in these conditions with beam currents of 30 nA.''' |
+ | <!--# '''Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA. Before moving forward with 2H02A harp scans and beam profile tune, make sure orbit lock is engaged at positions on 2H00(X=0.00,Y=0.00) and on 2H02(X=-1.1,Y=-1.). '''--> | ||
# Establish beam to the Faraday cup following the "General Guidelines" on the right. The required beam profile at 2H02A harp is: X-width <~0.25 mm, Y-width <~ 0.050 mm, and the tilt angle <15 degrees. The spot on the Chromax viewer should be close to x=-2mm, y=-5mm. Also make sure that Harp scans reproduce recent mean values of Beam X and and Y [https://logbooks.jlab.org/entry/3388464]. Vertically should be within 50 um match, horizontally 300 um should be enough. | # Establish beam to the Faraday cup following the "General Guidelines" on the right. The required beam profile at 2H02A harp is: X-width <~0.25 mm, Y-width <~ 0.050 mm, and the tilt angle <15 degrees. The spot on the Chromax viewer should be close to x=-2mm, y=-5mm. Also make sure that Harp scans reproduce recent mean values of Beam X and and Y [https://logbooks.jlab.org/entry/3388464]. Vertically should be within 50 um match, horizontally 300 um should be enough. | ||
# Restore ECal and Trigger | # Restore ECal and Trigger |
Revision as of 15:21, 14 June 2019
[edit]
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingRun Spreadsheet 2019,2016, 2015HPS Upgrade ERR |
Procedures
|
Manuals |
JLab Logbooks
|
HPS 2019 run, June X to August Y'
Beam energy 4.5 GeV
Important: Document all your work in the logbook!
Bluejeans for Run Meetings on DAY and DAY at 2pm
RC: Stepan Stepanyan
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Valery Kubarovsky
- (757) 876-1789
- 9 876-1789 from Counting Room
Run Plan for June 14 - 17, 2019Start close-up of the Hall on Friday, June 14, swing, when everyone is out and MCC is ready to sweep the Hall
Establish beam to the tagger dump
Bring beam to FC (for the first time this must be done with beamline expert):
Monday at 6:am
Important Notes:
SVT RECOVERY PROCDURES |
General InstructionsDAQ RECOVERYIf DAQ crashed/broken:
Establishing Physics Quality Beam for HPS:
Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA.
Setting up the FSD threshold
hpsrun@clonpc11> /home/hpsrun/scripts/FSD/Calc_FSD_Threshold.exe
|
Every Shift:
|
Every Run:
|
---|
RC daily meetings at 2 pm in the counting-house 2nd-floor conference room.
BlueJeans Info:
URL: https://bluejeans.com/794825703
Meeting ID: 794825703
|
|
|
Webcams:
|
Accelerator: |
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 310-7198 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5126, 5244, 5246, 5247 |
Hall-B Gas Shed | 7115 |