Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 123: | Line 123: | ||
# '''<font color=red> Important Note: Before bringing beams to the FC, make sure that the SVT, Hodoscope, and ECal are off, SVT is fully retracted, the target is out. If it is the very first time, collimator position is unknown and should be retracted.</font>''' | # '''<font color=red> Important Note: Before bringing beams to the FC, make sure that the SVT, Hodoscope, and ECal are off, SVT is fully retracted, the target is out. If it is the very first time, collimator position is unknown and should be retracted.</font>''' | ||
# '''Ask for 10 nA beam. When the beam sent to FC, it should be clearly visible on the downstream viewer. The halo counter rates downstream of the HPS, SHPS-SC and HPS-T should be more than10s of kHz. All upstream halo counters must be in the range of <100Hz.''' | # '''Ask for 10 nA beam. When the beam sent to FC, it should be clearly visible on the downstream viewer. The halo counter rates downstream of the HPS, SHPS-SC and HPS-T should be more than10s of kHz. All upstream halo counters must be in the range of <100Hz.''' | ||
− | #'''the | + | #'''First find position of the collimator. To do so run collimator wire scan. The current position of the wire at the center of the beam is 4.41, if measurement shows different number use the expert GUI to set the 3.94 mm SVT collimator (current position is 6.212). After collimator is in place all beam studies should be done in these conditions with beam currents of 30 nA.''' |
<!--# '''Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA. Before moving forward with 2H02A harp scans and beam profile tune, make sure orbit lock is engaged at positions on 2H00(X=0.00,Y=0.00) and on 2H02(X=-1.1,Y=-1.). '''--> | <!--# '''Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA. Before moving forward with 2H02A harp scans and beam profile tune, make sure orbit lock is engaged at positions on 2H00(X=0.00,Y=0.00) and on 2H02(X=-1.1,Y=-1.). '''--> | ||
− | # Establish beam to the Faraday cup following the "General Guidelines" on the right. The required beam profile at 2H02A harp is | + | # Establish beam to the Faraday cup following the "General Guidelines" on the right. The required beam profile at 2H02A harp is X-width <~0.05 mm, Y-width <~ 0.050 mm, and the tilt angle <15 degrees. The spot on the Chromax viewer should be close to x=-2mm, y=-5mm. Also, make sure that Harp scans reproduce recent mean values of Beam X and Y [https://logbooks.jlab.org/entry/3388464]. Vertically should be within 50 um match, horizontally 300 um should be enough. |
# Restore ECal and Trigger | # Restore ECal and Trigger | ||
#* Turn on ECal | #* Turn on ECal |
Revision as of 15:26, 14 June 2019
[edit]
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingRun Spreadsheet 2019,2016, 2015HPS Upgrade ERR |
Procedures
|
Manuals |
JLab Logbooks
|
HPS 2019 run, June X to August Y'
Beam energy 4.5 GeV
Important: Document all your work in the logbook!
Bluejeans for Run Meetings on DAY and DAY at 2pm
RC: Stepan Stepanyan
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Valery Kubarovsky
- (757) 876-1789
- 9 876-1789 from Counting Room
Run Plan for June 14 - 17, 2019Start close-up of the Hall on Friday, June 14, swing, when everyone is out and MCC is ready to sweep the Hall
Establish beam to the tagger dump
Bring beam to FC (for the first time this must be done with beamline expert):
Monday at 6:am
Important Notes:
SVT RECOVERY PROCDURES |
General InstructionsDAQ RECOVERYIf DAQ crashed/broken:
Establishing Physics Quality Beam for HPS:
Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA.
Setting up the FSD threshold
hpsrun@clonpc11> /home/hpsrun/scripts/FSD/Calc_FSD_Threshold.exe
|
Every Shift:
|
Every Run:
|
---|
RC daily meetings at 2 pm in the counting-house 2nd-floor conference room.
BlueJeans Info:
URL: https://bluejeans.com/794825703
Meeting ID: 794825703
|
|
|
Webcams:
|
Accelerator: |
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 310-7198 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5126, 5244, 5246, 5247 |
Hall-B Gas Shed | 7115 |