Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 126: | Line 126: | ||
<!--# '''Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA. Before moving forward with 2H02A harp scans and beam profile tune, make sure orbit lock is engaged at positions on 2H00(X=0.00,Y=0.00) and on 2H02(X=-1.1,Y=-1.). '''--> | <!--# '''Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA. Before moving forward with 2H02A harp scans and beam profile tune, make sure orbit lock is engaged at positions on 2H00(X=0.00,Y=0.00) and on 2H02(X=-1.1,Y=-1.). '''--> | ||
# Establish beam to the Faraday cup following the "General Guidelines" on the right. The required beam profile at 2H02A harp is X-width <~0.05 mm, Y-width <~ 0.050 mm, and the tilt angle <15 degrees. The spot on the Chromax viewer should be close to x=-2mm, y=-5mm. Also, make sure that Harp scans reproduce recent mean values of Beam X and Y [https://logbooks.jlab.org/entry/3388464]. Vertically should be within 50 um match, horizontally 300 um should be enough. | # Establish beam to the Faraday cup following the "General Guidelines" on the right. The required beam profile at 2H02A harp is X-width <~0.05 mm, Y-width <~ 0.050 mm, and the tilt angle <15 degrees. The spot on the Chromax viewer should be close to x=-2mm, y=-5mm. Also, make sure that Harp scans reproduce recent mean values of Beam X and Y [https://logbooks.jlab.org/entry/3388464]. Vertically should be within 50 um match, horizontally 300 um should be enough. | ||
− | # Restore ECal and | + | # Restore ECal and Hodoscope |
#* Turn on ECal | #* Turn on ECal | ||
− | #* Record FADC rates with and without the 4 um target at | + | #* Record FADC rates with and without the 4 um target at 50 nA. |
− | + | * Call ECal expert to perform pedestal run | |
− | + | #* Trigger/DAQ expert checks trigger rates, DAQ, and deadtime with 50 nA beam on 4 um target. Record: | |
− | #* Trigger/DAQ expert checks trigger rates, DAQ, and deadtime with | ||
#*# ''main scaler screen'' | #*# ''main scaler screen'' | ||
#*# ''ecal scaler gui'' | #*# ''ecal scaler gui'' | ||
Line 153: | Line 152: | ||
#* Quick no-collimator rate measurement</strike> | #* Quick no-collimator rate measurement</strike> | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
=== Important Notes: === | === Important Notes: === |
Revision as of 15:27, 14 June 2019
[edit]
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingRun Spreadsheet 2019,2016, 2015HPS Upgrade ERR |
Procedures
|
Manuals |
JLab Logbooks
|
HPS 2019 run, June X to August Y'
Beam energy 4.5 GeV
Important: Document all your work in the logbook!
Bluejeans for Run Meetings on DAY and DAY at 2pm
RC: Stepan Stepanyan
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Valery Kubarovsky
- (757) 876-1789
- 9 876-1789 from Counting Room
Run Plan for June 14 - 17, 2019Start close-up of the Hall on Friday, June 14, swing, when everyone is out and MCC is ready to sweep the Hall
Establish beam to the tagger dump
Bring beam to FC (for the first time this must be done with beamline expert):
Important Notes:
SVT RECOVERY PROCDURES |
General InstructionsDAQ RECOVERYIf DAQ crashed/broken:
Establishing Physics Quality Beam for HPS:
Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA.
Setting up the FSD threshold
hpsrun@clonpc11> /home/hpsrun/scripts/FSD/Calc_FSD_Threshold.exe
|
Every Shift:
|
Every Run:
|
---|
RC daily meetings at 2 pm in the counting-house 2nd-floor conference room.
BlueJeans Info:
URL: https://bluejeans.com/794825703
Meeting ID: 794825703
|
|
|
Webcams:
|
Accelerator: |
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 310-7198 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5126, 5244, 5246, 5247 |
Hall-B Gas Shed | 7115 |