Line 136: | Line 136: | ||
#*#* Live time should be >~90% | #*#* Live time should be >~90% | ||
#*#* Total Trigger rate should be ~17 kHz. | #*#* Total Trigger rate should be ~17 kHz. | ||
− | # SVT Setting (call SVT expert in) | + | <!--# SVT Setting (call SVT expert in) |
#* If beams are stable, SVT expert moves SVT to 1.0 and then 0.5 mm | #* If beams are stable, SVT expert moves SVT to 1.0 and then 0.5 mm | ||
#* record occupancy, latency, data size, and deadtimes | #* record occupancy, latency, data size, and deadtimes | ||
Line 145: | Line 145: | ||
#* Monitor and record BPM 2H02 history carefully to insure stable beams. | #* Monitor and record BPM 2H02 history carefully to insure stable beams. | ||
#** If beams are not stable, get MCC to fix it! | #** If beams are not stable, get MCC to fix it! | ||
− | #* Document any beam condition change and send scaler GUIs to HBLOG | + | #* Document any beam condition change and send scaler GUIs to HBLOG--> |
− | # Special (to be scheduled by RC) | + | <!-- # Special (to be scheduled by RC) |
#* <strike>3.93 mm collimator | #* <strike>3.93 mm collimator | ||
#** Scan to center it (update epics records) | #** Scan to center it (update epics records) | ||
#** Empty target run to compare rates with 2.82 mm collimator | #** Empty target run to compare rates with 2.82 mm collimator | ||
#* Quick no-collimator rate measurement</strike> | #* Quick no-collimator rate measurement</strike> | ||
− | + | --> | |
=== Important Notes: === | === Important Notes: === |
Revision as of 15:28, 14 June 2019
[edit]
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingRun Spreadsheet 2019,2016, 2015HPS Upgrade ERR |
Procedures
|
Manuals |
JLab Logbooks
|
HPS 2019 run, June X to August Y'
Beam energy 4.5 GeV
Important: Document all your work in the logbook!
Bluejeans for Run Meetings on DAY and DAY at 2pm
RC: Stepan Stepanyan
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Valery Kubarovsky
- (757) 876-1789
- 9 876-1789 from Counting Room
Run Plan for June 14 - 17, 2019Start close-up of the Hall on Friday, June 14, swing, when everyone is out and MCC is ready to sweep the Hall
Establish beam to the tagger dump
Bring beam to FC (for the first time this must be done with beamline expert):
Important Notes:
SVT RECOVERY PROCDURES |
General InstructionsDAQ RECOVERYIf DAQ crashed/broken:
Establishing Physics Quality Beam for HPS:
Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA.
Setting up the FSD threshold
hpsrun@clonpc11> /home/hpsrun/scripts/FSD/Calc_FSD_Threshold.exe
|
Every Shift:
|
Every Run:
|
---|
RC daily meetings at 2 pm in the counting-house 2nd-floor conference room.
BlueJeans Info:
URL: https://bluejeans.com/794825703
Meeting ID: 794825703
|
|
|
Webcams:
|
Accelerator: |
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 310-7198 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5126, 5244, 5246, 5247 |
Hall-B Gas Shed | 7115 |