Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 243: | Line 243: | ||
#*# Retract the SVT to its 1.5 mm stations, both top and bottom. | #*# Retract the SVT to its 1.5 mm stations, both top and bottom. | ||
#*# Tell MCC we are ready for beam. | #*# Tell MCC we are ready for beam. | ||
− | #*# Once beam is restored, confirm that both 2H02 beam positions x and y are as desired and halo counter rates are as expected. | + | #*# Once the beam is restored, confirm that both 2H02 beam positions x and y are as desired and halo counter rates are as expected. |
#*# Once beam is stable for ~1 minute, restore SVT HV and the SVT to its nominal position. | #*# Once beam is stable for ~1 minute, restore SVT HV and the SVT to its nominal position. | ||
#*# Resume data taking. | #*# Resume data taking. | ||
--> | --> | ||
+ | == Manual setup for chicane magnets == | ||
|- | |- |
Revision as of 16:47, 14 June 2019
[edit]
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingRun Spreadsheet 2019,2016, 2015HPS Upgrade ERR |
Procedures
|
Manuals |
JLab Logbooks
|
HPS 2019 run, June X to August Y'
Beam energy 4.5 GeV
Important: Document all your work in the logbook!
Bluejeans for Run Meetings on DAY and DAY at 2pm
RC: Stepan Stepanyan
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Valery Kubarovsky
- (757) 876-1789
- 9 876-1789 from Counting Room
Manual setup for chicane magnets
Run Plan for June 14 - 17, 2019Start close-up of the Hall on Friday, June 14, swing, when everyone is out and MCC is ready to sweep the Hall
!! Chicane magnets can be energized only when hall is in Beam Permit, [1]. Chicane nagnets must be off if the hall is in Restricted or in controlled access.Establish beam to the tagger dump
Bring beam to FC (for the first time this must be done with beamline expert):
Important Notes:
SVT RECOVERY PROCDURES |
General InstructionsDAQ RECOVERYIf DAQ crashed/broken:
Establishing Physics Quality Beam for HPS:
Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA.
Setting up the FSD threshold
hpsrun@clonpc11> /home/hpsrun/scripts/FSD/Calc_FSD_Threshold.exe
|
Every Shift:
|
Every Run:
|
---|
RC daily meetings at 2 pm in the counting-house 2nd-floor conference room.
BlueJeans Info:
URL: https://bluejeans.com/794825703
Meeting ID: 794825703
|
|
|
Webcams:
|
Accelerator: |
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 310-7198 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5126, 5244, 5246, 5247 |
Hall-B Gas Shed | 7115 |