Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 130: | Line 130: | ||
#* Turn on HVs on ECal and Hodoscope | #* Turn on HVs on ECal and Hodoscope | ||
#* Record FADC rates without the target, make a snapshot of the sacaler GUIs for both detectors and send to the logbook with notes on position of the highest rates in ECal that show beam positon at ECal | #* Record FADC rates without the target, make a snapshot of the sacaler GUIs for both detectors and send to the logbook with notes on position of the highest rates in ECal that show beam positon at ECal | ||
− | # Turn on chicane, use | + | # Turn on the chicane, use "Chicane" GUI to set correct currents on the magnet (see instructions) |
#* Check Ecal and hodoscope rates without and with the 4 um target at 50 nA. | #* Check Ecal and hodoscope rates without and with the 4 um target at 50 nA. | ||
* Call ECal expert to perform pedestal run | * Call ECal expert to perform pedestal run |
Revision as of 19:01, 15 June 2019
[edit]
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingRun Spreadsheet 2019,2016, 2015HPS Upgrade ERR |
Procedures
|
Manuals |
JLab Logbooks
|
HPS 2019 run, June X to August Y'
Beam energy 4.5 GeV
Important: Document all your work in the logbook!
Bluejeans for Run Meetings on DAY and DAY at 2pm
RC: Stepan Stepanyan
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Valery Kubarovsky
- (757) 876-1789
- 9 876-1789 from Counting Room
Run Plan June 15 - 17, 2019Close the Hall at the beginning of the swing shift after everyone is out and MCC is ready to sweep
!! Chicane magnets can be energized only when the hall is in Beam Permit, [1]. Chicane magnets must be off if the hall is in Restricted or in Controlled access.Establish beam to the tagger dump
Bring beam to FC (for the first time this must be done with beamline expert):
Important Notes:
SVT RECOVERY PROCDURES |
General InstructionsDAQ RECOVERYIf DAQ crashed/broken:
Establishing Physics Quality Beam for HPS:
Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA.
Setting up the FSD threshold
hpsrun@clonpc11> /home/hpsrun/scripts/FSD/Calc_FSD_Threshold.exe
|
Every Shift:
|
Every Run:
|
---|
RC daily meetings at 2 pm in the counting-house 2nd-floor conference room.
BlueJeans Info:
URL: https://bluejeans.com/794825703
Meeting ID: 794825703
|
|
|
Webcams:
|
Accelerator: |
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 310-7198 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5126, 5244, 5246, 5247 |
Hall-B Gas Shed | 7115 |