Line 118: | Line 118: | ||
* If after the sweep MCC is not ready to send a beam to Hall-B, keep the hall in control access for people still doing work on detectors. | * If after the sweep MCC is not ready to send a beam to Hall-B, keep the hall in control access for people still doing work on detectors. | ||
=== <font color=red> * !! Chicane magnets can be energized only when the hall is in Beam Permit, [https://wiki.jlab.org/hps-run/images/c/cd/Chicane_controls.pdf]. Chicane magnets must be off if the hall is in Restricted or in Controlled access. === | === <font color=red> * !! Chicane magnets can be energized only when the hall is in Beam Permit, [https://wiki.jlab.org/hps-run/images/c/cd/Chicane_controls.pdf]. Chicane magnets must be off if the hall is in Restricted or in Controlled access. === | ||
− | === * The vacuum gauge used in SVT interlock (2H03) is broken. Watch the gauge 2H02, in case of a vacuum event valves will close and beam will be shut-off. If the event is at 2H02 (loss of vacuum near HPS chamber) call SVT expert | + | === * The vacuum gauge used in SVT interlock (2H03) is broken. Watch the gauge 2H02, in case of a vacuum event valves will close and the beam will be shut-off. If the event is at 2H02 (loss of vacuum near HPS chamber) call SVT expert immediately and follow his/her instruction. </font>=== |
== Establish beam to the tagger dump == | == Establish beam to the tagger dump == | ||
# See "General Instructions" on the right for details | # See "General Instructions" on the right for details | ||
# Log screenshots of the ECal and main HPS scaler screens for reference when the beam is established at the tagger | # Log screenshots of the ECal and main HPS scaler screens for reference when the beam is established at the tagger | ||
== Bring beam to FC (for the first time this must be done with beamline expert): == | == Bring beam to FC (for the first time this must be done with beamline expert): == | ||
− | # '''<font color=red> Important Note: Before bringing beams to FC, make sure that the SVT, Hodoscope, and ECal are off, SVT is fully retracted, the target is out. If this is a first time that beam goes to FC after machine settings have changed | + | # '''<font color=red> Important Note: Before bringing beams to FC, make sure that the SVT, Hodoscope, and ECal are off, SVT is fully retracted, the target is out. If this is a first time that beam goes to FC after machine settings have changed then the SVT protection collimator position relative to the beam trajectory is unknown and therefore HPS protection collimator must be retracted.</font>''' |
# '''Ask for 10 nA beam. When the beam sent to FC, it should be clearly visible on the downstream viewer. The halo counter rates downstream of the HPS, SHPS-SC, and HPS-T should be more than10s of kHz. All upstream halo counters must be in the range of <100Hz.''' | # '''Ask for 10 nA beam. When the beam sent to FC, it should be clearly visible on the downstream viewer. The halo counter rates downstream of the HPS, SHPS-SC, and HPS-T should be more than10s of kHz. All upstream halo counters must be in the range of <100Hz.''' | ||
#'''First find the position of the collimator by performing the collimator wire scan. The current position of the wire for beam center is 4.41 (labeled on the GUI), if the measurement finds beam center at a different position use the expert GUI to set the 3.94 mm SVT collimator to the right position (current position is 6.212, which means that the distance between the wire and the center of the 3.94 mm hole is 1.802). After collimator is in place all beam studies should be done in these conditions with beam currents of 30 nA.''' | #'''First find the position of the collimator by performing the collimator wire scan. The current position of the wire for beam center is 4.41 (labeled on the GUI), if the measurement finds beam center at a different position use the expert GUI to set the 3.94 mm SVT collimator to the right position (current position is 6.212, which means that the distance between the wire and the center of the 3.94 mm hole is 1.802). After collimator is in place all beam studies should be done in these conditions with beam currents of 30 nA.''' | ||
Line 130: | Line 130: | ||
# Restore ECal and Hodoscope | # Restore ECal and Hodoscope | ||
#* Turn on HVs on ECal and Hodoscope | #* Turn on HVs on ECal and Hodoscope | ||
− | #* Record FADC rates without the target, make a snapshot of the sacaler GUIs for both detectors and send to the logbook with notes on position of the highest rates in ECal that show beam | + | #* Record FADC rates without the target, make a snapshot of the sacaler GUIs for both detectors and send to the logbook with notes on the position of the highest rates in ECal that show beam position at ECal |
# Turn on the chicane, use "Chicane" GUI to set correct currents on the magnet (see instructions) | # Turn on the chicane, use "Chicane" GUI to set correct currents on the magnet (see instructions) | ||
− | #* Check the ECal and hodoscope rates without the target at 50 nA, make a snapshot of the sacaler GUIs for both detectors and send to the logbook. Make note the | + | #* Check the ECal and hodoscope rates without the target at 50 nA, make a snapshot of the sacaler GUIs for both detectors and send to the logbook. Make note the highest rate position on ECal. |
#* Insert the 4 um target and check ECal and hodoscope rates at 50 nA. Make a snapshot of the sacaler GUIs for both detectors and send to the logbook. | #* Insert the 4 um target and check ECal and hodoscope rates at 50 nA. Make a snapshot of the sacaler GUIs for both detectors and send to the logbook. | ||
* Call ECal expert to perform pedestal run | * Call ECal expert to perform pedestal run | ||
Line 148: | Line 148: | ||
#* 150 Million events per run | #* 150 Million events per run | ||
#* Be sure to follow General Guidelines, especially instructions for '''Every Shift''' and '''Every Run''' below. | #* Be sure to follow General Guidelines, especially instructions for '''Every Shift''' and '''Every Run''' below. | ||
− | #* Monitor and record BPM 2H02 history carefully to | + | #* Monitor and record BPM 2H02 history carefully to ensure stable beams. |
#** If beams are not stable, get MCC to fix it! | #** If beams are not stable, get MCC to fix it! | ||
#* Document any beam condition change and send scaler GUIs to HBLOG--> | #* Document any beam condition change and send scaler GUIs to HBLOG--> | ||
Line 189: | Line 189: | ||
<!-- # <b> While MCC degausses the tagger magnet, verify that chicane is ON</b> | <!-- # <b> While MCC degausses the tagger magnet, verify that chicane is ON</b> | ||
#* If not, turn it on. Strictly follow the procedure in the beam line manual!--> | #* If not, turn it on. Strictly follow the procedure in the beam line manual!--> | ||
− | # ''' Before sending beam to the Faraday cup ''' | + | # ''' Before sending a beam to the Faraday cup ''' |
#* Check that chicane GUI says "Chicane Ready" | #* Check that chicane GUI says "Chicane Ready" | ||
#* ''' Check that SVT protection collimator is ON ''' | #* ''' Check that SVT protection collimator is ON ''' | ||
Line 195: | Line 195: | ||
#* SVT is OUT (position=0.000 mm in main hps scaler screen) and HV is off (all red/green indicators RED in SVT bias GUI) | #* SVT is OUT (position=0.000 mm in main hps scaler screen) and HV is off (all red/green indicators RED in SVT bias GUI) | ||
#* If any uncertainty, page the experts | #* If any uncertainty, page the experts | ||
− | #* The first time sending beam to the Faraday cup after the hall is closed, page the SVT expert. | + | #* The first time sending a beam to the Faraday cup after the hall is closed, page the SVT expert. |
− | #* Pay attention into following corrector values: 2C22H, 2C23V, 2H00H, 2H00V, Compare them to ones that are in [https://logbooks.jlab.org/entry/3394957]. Make sure their values doesn't differ more than 100%. If there is | + | #* Pay attention into following corrector values: 2C22H, 2C23V, 2H00H, 2H00V, Compare them to ones that are in [https://logbooks.jlab.org/entry/3394957]. Make sure their values doesn't differ more than 100%. If there is such difference, tell MCC about this. |
# ''' Send beam to the Faraday cup ''' | # ''' Send beam to the Faraday cup ''' | ||
#* If the beam optics is correct, then you should immediately see the beam spot on the Downstream Viewer and beam position and on 2H00 and 2H02 BPMS. | #* If the beam optics is correct, then you should immediately see the beam spot on the Downstream Viewer and beam position and on 2H00 and 2H02 BPMS. | ||
Line 217: | Line 217: | ||
=== Setting up the FSD threshold === | === Setting up the FSD threshold === | ||
*When you are about to calculate FSD limit, it means the beam is already established, and the target is in. | *When you are about to calculate FSD limit, it means the beam is already established, and the target is in. | ||
− | * To calculate the FSD threshold run the | + | * To calculate the FSD threshold run the following executable |
hpsrun@clonpc11> /home/hpsrun/scripts/FSD/Calc_FSD_Threshold.exe | hpsrun@clonpc11> /home/hpsrun/scripts/FSD/Calc_FSD_Threshold.exe | ||
− | * Note we use 1 ms integration time | + | * Note we use 1 ms integration time and want 5.5 sigma away from the average rates |
* Allowed tolerable rate increase default is 15%, if that causes many trips, then contact RC, he might suggest to increase that number | * Allowed tolerable rate increase default is 15%, if that causes many trips, then contact RC, he might suggest to increase that number | ||
* <font color='red'> Make sure if MCC operator set the FSD limit and integration time correctly </font> | * <font color='red'> Make sure if MCC operator set the FSD limit and integration time correctly </font> | ||
Line 227: | Line 227: | ||
===SVT Instructions:=== | ===SVT Instructions:=== | ||
#<font color='red'>Turn SVT completely OFF (Bias, FEB, Flange) when entering Beam Permit.</font> | #<font color='red'>Turn SVT completely OFF (Bias, FEB, Flange) when entering Beam Permit.</font> | ||
− | # Before sending beam to Faraday cup, verify (and page SVT expert if otherwise): | + | # Before sending a beam to Faraday cup, verify (and page SVT expert if otherwise): |
#* SVT should be open: "Position" at 0.000 mm in the main scaler_hps GUI | #* SVT should be open: "Position" at 0.000 mm in the main scaler_hps GUI | ||
#* SVT HV is off: all red/green indicators RED in SVT bias GUI | #* SVT HV is off: all red/green indicators RED in SVT bias GUI | ||
− | # The first time sending beam to the Faraday cup after the hall is closed, page the SVT expert. | + | # The first time sending a beam to the Faraday cup after the hall is closed, page the SVT expert. |
--> | --> | ||
<!-- | <!-- | ||
Line 248: | Line 248: | ||
#* If it was an HPS halo counter trip, MCC will not restore the beam until we request it. Inform MCC that we will get back to them when we are ready for beam. | #* If it was an HPS halo counter trip, MCC will not restore the beam until we request it. Inform MCC that we will get back to them when we are ready for beam. | ||
#*# Retract the SVT to its 1.5 mm stations, both top and bottom. | #*# Retract the SVT to its 1.5 mm stations, both top and bottom. | ||
− | #*# Tell MCC we are ready for beam. | + | #*# Tell MCC we are ready for the beam. |
#*# Once the beam is restored, confirm that both 2H02 beam positions x and y are as desired and halo counter rates are as expected. | #*# Once the beam is restored, confirm that both 2H02 beam positions x and y are as desired and halo counter rates are as expected. | ||
− | #*# Once beam is stable for ~1 minute, restore SVT HV and the SVT to its nominal position. | + | #*# Once the beam is stable for ~1 minute, restore SVT HV and the SVT to its nominal position. |
#*# Resume data taking. | #*# Resume data taking. | ||
--> | --> |
Revision as of 19:21, 15 June 2019
[edit]
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingRun Spreadsheet 2019,2016, 2015HPS Upgrade ERR |
Procedures
|
Manuals |
JLab Logbooks
|
HPS 2019 run, June X to August Y'
Beam energy 4.5 GeV
Important: Document all your work in the logbook!
Bluejeans for Run Meetings on DAY and DAY at 2pm
RC: Stepan Stepanyan
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Valery Kubarovsky
- (757) 876-1789
- 9 876-1789 from Counting Room
Run Plan June 15 - 17, 2019Close the Hall at the beginning of the swing shift after everyone is out and MCC is ready to sweep
* !! Chicane magnets can be energized only when the hall is in Beam Permit, [1]. Chicane magnets must be off if the hall is in Restricted or in Controlled access.* The vacuum gauge used in SVT interlock (2H03) is broken. Watch the gauge 2H02, in case of a vacuum event valves will close and the beam will be shut-off. If the event is at 2H02 (loss of vacuum near HPS chamber) call SVT expert immediately and follow his/her instruction.Establish beam to the tagger dump
Bring beam to FC (for the first time this must be done with beamline expert):
Important Notes:
SVT RECOVERY PROCDURES |
General InstructionsDAQ RECOVERYIf DAQ crashed/broken:
Establishing Physics Quality Beam for HPS:
Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA.
Setting up the FSD threshold
hpsrun@clonpc11> /home/hpsrun/scripts/FSD/Calc_FSD_Threshold.exe
|
Every Shift:
|
Every Run:
|
---|
RC daily meetings at 2 pm in the counting-house 2nd-floor conference room.
BlueJeans Info:
URL: https://bluejeans.com/794825703
Meeting ID: 794825703
|
|
|
Webcams:
|
Accelerator: |
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 310-7198 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5126, 5244, 5246, 5247 |
Hall-B Gas Shed | 7115 |