Line 128: | Line 128: | ||
# '''Ask for 10 nA beam. When the beam sent to FC, it should be clearly visible on the downstream viewer. The halo counter rates downstream of the HPS, HPS-SC, and HPS-T should not be more than 10s of kHz. All upstream halo counters must be in the range of <100Hz.''' | # '''Ask for 10 nA beam. When the beam sent to FC, it should be clearly visible on the downstream viewer. The halo counter rates downstream of the HPS, HPS-SC, and HPS-T should not be more than 10s of kHz. All upstream halo counters must be in the range of <100Hz.''' | ||
#'''First find the position of the collimator by performing the collimator wire scan. The current position of the wire for beam center is 4.41 (labeled on the GUI), if the measurement finds beam center at a different position use the expert GUI to set the 3.94 mm SVT collimator to the right position (current position is 6.212, which means that the distance between the wire and the center of the 3.94 mm hole is 1.802). After collimator is in place all beam studies should be done in these conditions with beam currents of 30 nA.''' --> | #'''First find the position of the collimator by performing the collimator wire scan. The current position of the wire for beam center is 4.41 (labeled on the GUI), if the measurement finds beam center at a different position use the expert GUI to set the 3.94 mm SVT collimator to the right position (current position is 6.212, which means that the distance between the wire and the center of the 3.94 mm hole is 1.802). After collimator is in place all beam studies should be done in these conditions with beam currents of 30 nA.''' --> | ||
− | |||
# <strike>Establish beam to the Faraday cup following the "General Guidelines" and Beamline Procedures. The required beam profile at 2H02A harp is X-width <~0.05 mm, Y-width <~ 0.050 mm</strike> | # <strike>Establish beam to the Faraday cup following the "General Guidelines" and Beamline Procedures. The required beam profile at 2H02A harp is X-width <~0.05 mm, Y-width <~ 0.050 mm</strike> | ||
# Restore ECal and Hodoscope | # Restore ECal and Hodoscope | ||
Line 207: | Line 206: | ||
<b> Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA.</b> | <b> Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA.</b> | ||
#* Ask MCC to establish 30 nA beam with <font color=red>HPS</font> orbit locks on (We need '''HallBHPSOrb''' not '''HallBOrb''' configuration). <b>For orbit lock positions on <font color=red>2H00(X=0.00,Y=0.00) and on 2H02(X=-1.00,Y=-0.85). Use the 2.82 mm SVT collimator. </font></b>. | #* Ask MCC to establish 30 nA beam with <font color=red>HPS</font> orbit locks on (We need '''HallBHPSOrb''' not '''HallBOrb''' configuration). <b>For orbit lock positions on <font color=red>2H00(X=0.00,Y=0.00) and on 2H02(X=-1.00,Y=-0.85). Use the 2.82 mm SVT collimator. </font></b>. | ||
− | #* Tune beam profile at HPS using measured widths on 2H01A and 2H02A harps. The required beam profile at 2H02A harp is: X-width <~0.05 mm, Y-width <~ 0.05 mm. | + | #* Tune beam profile at HPS using measured widths on 2H01A and 2H02A harps. The required beam profile at 2H02A harp is: X-width <~0.05 mm, Y-width <~ 0.05 mm. Beam profile using 2H01A and 2H02A harps with previous scans ([https://logbooks.jlab.org/entry/3689164],[https://logbooks.jlab.org/entry/3689165]) to compare. |
#* Check and log the beam spot on chromax viewer | #* Check and log the beam spot on chromax viewer | ||
#* The halo counter rates before HPS must be low: | #* The halo counter rates before HPS must be low: | ||
Line 214: | Line 213: | ||
#*# The halo counter rates on HPS, HPS-L/R/T/SC, depends on the collimator and HPS chicane settings, but should not be more than 100 Hz/nA [https://logbooks.jlab.org/entry/3689166] | #*# The halo counter rates on HPS, HPS-L/R/T/SC, depends on the collimator and HPS chicane settings, but should not be more than 100 Hz/nA [https://logbooks.jlab.org/entry/3689166] | ||
#* Positions on BPMs must be close to what they were before [https://logbooks.jlab.org/entry/3689166] | #* Positions on BPMs must be close to what they were before [https://logbooks.jlab.org/entry/3689166] | ||
− | |||
#* Once all the above is achieved, turn ECAL and Hodoscope HV '''ON''' to monitor and log ECal rates | #* Once all the above is achieved, turn ECAL and Hodoscope HV '''ON''' to monitor and log ECal rates | ||
#* Insert the 4um W target without turning off the beam. | #* Insert the 4um W target without turning off the beam. |
Revision as of 04:05, 17 June 2019
[edit]
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingRun Spreadsheet 2019,2016, 2015HPS Upgrade ERR |
Procedures
|
Manuals |
JLab Logbooks
|
HPS 2019 run, June X to August Y'
Beam energy 4.5 GeV
Important: Document all your work in the logbook!
Bluejeans for Run Meetings on DAY and DAY at 2pm
RC: Stepan Stepanyan
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Valery Kubarovsky
- (757) 876-1789
- 9 876-1789 from Counting Room
* !! Chicane magnets can be energized only when the hall is in Beam Permit, [1]. Chicane magnets must be off if the hall is in Restricted or in Controlled access.
* The vacuum gauge used in SVT interlock (2H03) is broken. Watch the gauge 2H02, in case of a vacuum event valves will close and the beam will be shut-off. If the event is at 2H02 (loss of vacuum near HPS chamber) call SVT expert immediately and follow his/her instruction.
Run Plan June 15 - 17, 2019
Important Notes:
|
General InstructionsDAQ RECOVERYIf DAQ crashed/broken:
Establishing Physics Quality Beam for HPS:
Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA.
Setting up the FSD threshold
hpsrun@clonpc11> /home/hpsrun/scripts/FSD/Calc_FSD_Threshold.exe
|
Every Shift:
|
Every Run:
|
---|
RC daily meetings at 2 pm in the counting-house 2nd-floor conference room.
BlueJeans Info:
URL: https://bluejeans.com/794825703
Meeting ID: 794825703
|
|
|
Webcams:
|
Accelerator: |
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 310-7198 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5126, 5244, 5246, 5247 |
Hall-B Gas Shed | 7115 |