Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 122: | Line 122: | ||
=== When beam is back === | === When beam is back === | ||
− | |||
− | |||
− | |||
− | |||
− | |||
# Establish beam to the Faraday cup following the "General Guidelines" and Beamline Procedures. The required beam profile at 2H02A harp is X-width <~0.10 mm, Y-width <~ 0.060 mm | # Establish beam to the Faraday cup following the "General Guidelines" and Beamline Procedures. The required beam profile at 2H02A harp is X-width <~0.10 mm, Y-width <~ 0.060 mm | ||
See "General Instructions" on the right for details | See "General Instructions" on the right for details | ||
Line 136: | Line 131: | ||
# Restore ECal and Hodoscope | # Restore ECal and Hodoscope | ||
#* Turn on HVs on ECal and Hodoscope | #* Turn on HVs on ECal and Hodoscope | ||
− | |||
− | |||
#* Check the ECal and hodoscope rates without a target at 50 nA, make a snapshot of the sacaler GUIs for both detectors and send to the logbook. Make note of the highest rate position on ECal. | #* Check the ECal and hodoscope rates without a target at 50 nA, make a snapshot of the sacaler GUIs for both detectors and send to the logbook. Make note of the highest rate position on ECal. | ||
#* Insert the 4 um W target and check ECal and hodoscope rates at 50 nA. Make a snapshot of the sacaler GUIs for both detectors and send to the logbook. | #* Insert the 4 um W target and check ECal and hodoscope rates at 50 nA. Make a snapshot of the sacaler GUIs for both detectors and send to the logbook. | ||
− | # | + | # Continue ECal/hodoscope and trigger rate, and FSD thresholds/rates studies with 4 um W target and up to 400 nA beam. '''Note: thresholds on FSD must be changed while scanning'''. Record rates in the logbook. Call beamline expert if needed. |
− | + | <!--# Call ECal and DAQ expert to perform pedestal run and DAQ/trigger studies--> | |
− | # Call ECal and DAQ expert to perform pedestal run and DAQ/trigger studies | + | #* Run 30 min for each current setting, starting 100 nA and go with 50 nA steps. Record: |
− | #* | ||
#*# ''main scaler screen'' | #*# ''main scaler screen'' | ||
#*# ''ecal scaler gui'' | #*# ''ecal scaler gui'' | ||
#*# ''trigger rate gui'' | #*# ''trigger rate gui'' | ||
− | #*#* Live time | + | #*#* Live time |
− | #*#* Total Trigger rate | + | #*#* Total Trigger rate |
#* The DAQ Configuration: | #* The DAQ Configuration: | ||
#*# without and with SVT '''<tt>PROD66__NOSVT and PROD66</tt>''', respectively | #*# without and with SVT '''<tt>PROD66__NOSVT and PROD66</tt>''', respectively |
Revision as of 16:06, 18 June 2019
[edit]
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingRun Spreadsheet 2019,2016, 2015HPS Upgrade ERRCOO, ESAD, RSAD Things to read before shift. |
Procedures
|
Manuals |
JLab Logbooks
|
HPS 2019 run, June X to August Y'
Beam energy 4.5 GeV
Important: Document all your work in the logbook!
Bluejeans for Run Meetings on DAY and DAY at 2pm
RC: Stepan Stepanyan
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Valery Kubarovsky
- (757) 876-1789
- 9 876-1789 from Counting Room
* !! Chicane magnets can be energized only when the hall is in Beam Permit, [1]. Chicane magnets must be off if the hall is in Restricted or in Controlled access.
* The vacuum gauge used in SVT interlock (2H03) is broken. Watch the gauge 2H02, in case of a vacuum event valves will close and the beam will be shut-off. If the event is at 2H02 (loss of vacuum near HPS chamber) call SVT expert immediately and follow his/her instruction.
Run Plan June 17 - 18, 2019When beam is back
See "General Instructions" on the right for details
Important Notes:
|
General InstructionsDAQ RECOVERYIf DAQ crashed/broken:
Establishing Physics Quality Beam for HPS:
Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA.
Setting up the FSD threshold
hpsrun@clonpc11> /home/hpsrun/scripts/FSD/Calc_FSD_Threshold.exe
|
Every Shift:
|
Every Run:
|
---|
RC daily meetings at 2 pm in the counting-house 2nd-floor conference room.
BlueJeans Info:
URL: https://bluejeans.com/794825703
Meeting ID: 794825703
|
|
|
Webcams:
|
Accelerator:
|
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 310-7198 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5126, 5244, 5246, 5247 |
Hall-B Gas Shed | 7115 |