Line 122: | Line 122: | ||
=== When beam is back === | === When beam is back === | ||
− | # Establish beam to the Faraday cup | + | # Establish beam to the tagger dump. |
− | + | # Establish beam to the Faraday cup. | |
+ | = Follow "General Guidelines" on the right and the Beamline Procedures. | ||
+ | |||
+ | # Move beam by 3.5 mm upwards using position readings on 2H02 BPM. This operation must be done with SVT and beam experts. | ||
+ | #* Using expert GUI record position of the collimator. | ||
+ | #* Record rates in HPS-L and HPS-R | ||
+ | #* Move beam in small steps, 0.2 mm, until rates in HPS-R and HPS-L will double approximately | ||
+ | #* Move collimator with 0.01 step up, this means putting -0.01 in the "MoveRel" window of the expert GUI. You should see ratesd on HPS-L and HPS-R go down to the levels before moving the beam. Continue until rates will go up again by f~x2. Record collimator position | ||
+ | #* Repeat last two steps until beam is at the desired location. From the last collimator motion | ||
# Ask for beam current ~50 nA beam and with SVT expert perform SVT wire scan to find the position of the beam relative to SVT. Only FSD node HPS Down must be masked. | # Ask for beam current ~50 nA beam and with SVT expert perform SVT wire scan to find the position of the beam relative to SVT. Only FSD node HPS Down must be masked. | ||
− | #* If beam position needs to be adjusted, work with MCC ops to move it to the desired position using position reading on 2H02 BPM. If adjustment is in the vertical direction, then with the beam motion, SVT collimator must be moved as well. Steps of the motion must be the order of 0.2 mm, so if you need to move beam vertically by 1 mm, it will take 5 motions beam-then- | + | #* If beam position needs to be adjusted, work with MCC ops to move it to the desired position using position reading on 2H02 BPM. If adjustment is in the vertical direction, then with the beam motion, SVT collimator must be moved as well. Steps of the motion must be the order of 0.2 mm, so if you need to move beam vertically by 1 mm, it will take 5 motions beam-then-collimator to get there. |
#* After adjusting the beam position, perform SVT wire scan again to verify that beam is in the correct spot. If needed, adjust it | #* After adjusting the beam position, perform SVT wire scan again to verify that beam is in the correct spot. If needed, adjust it | ||
#* After finishing beam positioning, record BPM values, send the scaler GUI to the logbook, perfomr 2H02 harp scan, record results. | #* After finishing beam positioning, record BPM values, send the scaler GUI to the logbook, perfomr 2H02 harp scan, record results. |
Revision as of 06:25, 19 June 2019
[edit]
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingRun Spreadsheet 2019,2016, 2015HPS Upgrade ERRCOO, ESAD, RSAD Things to read before shift. |
Procedures
|
Manuals |
JLab Logbooks
|
HPS 2019 run, June X to August Y'
Beam energy 4.5 GeV
Important: Document all your work in the logbook!
Bluejeans for Run Meetings on DAY and DAY at 2pm
RC: Stepan Stepanyan
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Valery Kubarovsky
- (757) 876-1789
- 9 876-1789 from Counting Room
* !! Chicane magnets can be energized only when the hall is in Beam Permit, [1]. Chicane magnets must be off if the hall is in Restricted or in Controlled access.
* The vacuum gauge used in SVT interlock (2H03) is broken. Watch the gauge 2H02, in case of a vacuum event valves will close and the beam will be shut-off. If the event is at 2H02 (loss of vacuum near HPS chamber) call SVT expert immediately and follow his/her instruction.
Run Plan June 17 - 18, 2019When beam is back
= Follow "General Guidelines" on the right and the Beamline Procedures.
Important Notes:
|
General InstructionsDAQ RECOVERYIf DAQ crashed/broken:
Establishing Physics Quality Beam for HPS:
Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA.
Setting up the FSD threshold
hpsrun@clonpc11> /home/hpsrun/scripts/FSD/Calc_FSD_Threshold.exe
|
Every Shift:
|
Every Run:
|
---|
RC daily meetings at 2 pm in the counting-house 2nd-floor conference room.
BlueJeans Info:
URL: https://bluejeans.com/794825703
Meeting ID: 794825703
|
|
|
Webcams:
|
Accelerator:
|
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 310-7198 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5126, 5244, 5246, 5247 |
Hall-B Gas Shed | 7115 |