Line 116: | Line 116: | ||
--> | --> | ||
− | == Run Plan June | + | == Run Plan June 20 - 21, 2019 == |
− | + | # SVT DAQ work | |
− | + | #* takes precedence when needed, work will likely be sporadic | |
− | # | ||
− | # | ||
− | Follow "General Guidelines" on the right and the Beamline Procedures. | + | When there is stable beam: |
+ | # Time in the SVT | ||
+ | #* Ask SVT experts if they are ready, if so do this ASAP. SVT experts will run this procedure | ||
+ | # Take runs for Hodoscope HV Tuning (call Rafo when ready) | ||
+ | #* Follow Hodoscope HV tuning procedure from Rafo | ||
+ | #* 8um target, 100nA (verify with Rafo) | ||
+ | # FEE trigger run for 1 hour | ||
+ | #* Use trigger configuration = ???(Nathan) | ||
+ | #* 8um target 50, 100 200 nA runs, ~1/2 hour | ||
+ | # When beam and no SVT or DAQ work, take random trigger data with ECal and Hodoscopes (SVT Off) | ||
+ | |||
+ | <!-- Follow "General Guidelines" on the right and the Beamline Procedures. --> | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
<!--# SVT Setting (call SVT expert in) | <!--# SVT Setting (call SVT expert in) | ||
#* If beams are stable, SVT expert moves SVT to 1.0 and then 0.5 mm | #* If beams are stable, SVT expert moves SVT to 1.0 and then 0.5 mm | ||
#* record occupancy, latency, data size, and deadtimes | #* record occupancy, latency, data size, and deadtimes | ||
− | # Record Production Data with | + | # Record Production Data with 8um target @ 100 nA |
#* Use Configuration <tt>HPS35</tt> and Trigger <tt>v8_200nA.trg</tt>. | #* Use Configuration <tt>HPS35</tt> and Trigger <tt>v8_200nA.trg</tt>. | ||
#* 150 Million events per run | #* 150 Million events per run | ||
Line 171: | Line 154: | ||
# '''Do not run more than 60 minutes above 30 nA without the beam blocker in front of Faraday cup. Put beam blocker in for long running at high currents.''' | # '''Do not run more than 60 minutes above 30 nA without the beam blocker in front of Faraday cup. Put beam blocker in for long running at high currents.''' | ||
− | <!-- ==[[SVT RECOVERY | + | <!-- ==[[SVT RECOVERY PROCEDURES]]== --> |
| valign=top | | | valign=top | |
Revision as of 07:29, 20 June 2019
[edit]
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingRun Spreadsheet 2019,2016, 2015HPS Upgrade ERRCOO, ESAD, RSAD Things to read before shift. |
Procedures
|
Manuals |
JLab Logbooks
|
HPS 2019 run, June X to August Y'
Beam energy 4.5 GeV
Important: Document all your work in the logbook!
Bluejeans for Run Meetings on DAY and DAY at 2pm
RC: Matt Graham
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Valery Kubarovsky
- (757) 876-1789
- 9 876-1789 from Counting Room
* !! Chicane magnets can be energized only when the hall is in Beam Permit, [1]. Chicane magnets must be off if the hall is in Restricted or in Controlled access.
* The vacuum gauge used in SVT interlock (2H03) is broken. Watch the gauge 2H02, in case of a vacuum event valves will close and the beam will be shut-off. If the event is at 2H02 (loss of vacuum near HPS chamber) call SVT expert immediately and follow his/her instruction.
Run Plan June 20 - 21, 2019
When there is stable beam:
Important Notes:
|
General InstructionsDAQ RECOVERYIf DAQ crashed/broken:
Establishing Physics Quality Beam for HPS:
Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA.
Setting up the FSD threshold
hpsrun@clonpc11> /home/hpsrun/scripts/FSD/Calc_FSD_Threshold.exe
|
Every Shift:
|
Every Run:
|
---|
RC daily meetings at 2 pm in the counting-house 2nd-floor conference room.
BlueJeans Info:
URL: https://bluejeans.com/794825703
Meeting ID: 794825703
|
|
|
Webcams:
|
Accelerator:
|
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 310-7198 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5126, 5244, 5246, 5247 |
Hall-B Gas Shed | 7115 |