Difference between revisions of "The HPS Run Wiki"
Line 123: | Line 123: | ||
| valign=top width=50% |am profile check once a day, at 9 am, using 2H02 and SVT wire harps | | valign=top width=50% |am profile check once a day, at 9 am, using 2H02 and SVT wire harps | ||
− | == Run Plan September | + | == Run Plan September 4 - September 7, 2021 == |
* When the machine will be ready use procedurse[https://wiki.jlab.org/hps-run/images/1/1e/HPS_beam_estab.pdf] to establish a physics beam for HPS, see step-by-step instructions on the right. The chicane should be ON when sending the beam to Faraday cup (energize it while tagger magnet is degaussed) - <b> Ask Cameron if he is ready before allowing the beam to the hall </b>. | * When the machine will be ready use procedurse[https://wiki.jlab.org/hps-run/images/1/1e/HPS_beam_estab.pdf] to establish a physics beam for HPS, see step-by-step instructions on the right. The chicane should be ON when sending the beam to Faraday cup (energize it while tagger magnet is degaussed) - <b> Ask Cameron if he is ready before allowing the beam to the hall </b>. | ||
− | * To define the correct trajectory for the beam to FC positions on 2C24A BMP are [https://logbooks.jlab.org/entry/3899470] x=0.699, y=0.719, positions on the harp should be as in [https://logbooks.jlab.org/entry/3899468]. | + | * To define the correct trajectory for the beam to FC positions on 2C24A BMP are [https://logbooks.jlab.org/entry/3899470] x=0.699, y=0.719, positions on the harp should be as in [https://logbooks.jlab.org/entry/3899468]. |
− | * With MCC Check the correctness of the 2H02 BPM readings (direction notations in X and Y) using the 2H02 harp. On the harp increasing number for the mean values of the peaks in X and Y mean beam moves to | + | * With MCC Check the correctness of the 2H02 BPM readings (direction notations in X and Y) using the 2H02 harp. On the harp increasing number for the mean values of the peaks in X and Y mean beam moves to the left and down, respectively. |
* Ask MCC to set the orbit locks using 2H00 and 2H02 BPMs, tell them x,y positions on these BPMs, see above | * Ask MCC to set the orbit locks using 2H00 and 2H02 BPMs, tell them x,y positions on these BPMs, see above | ||
* After getting the beam to FC with parameters close to or better than [https://logbooks.jlab.org/entry/3899605], align beam relative to SVT - call SVT expert | * After getting the beam to FC with parameters close to or better than [https://logbooks.jlab.org/entry/3899605], align beam relative to SVT - call SVT expert | ||
Line 138: | Line 138: | ||
** Run baseline measurements to set the threshold | ** Run baseline measurements to set the threshold | ||
** Time-in SVT, requires moving to 3 mm from beam position | ** Time-in SVT, requires moving to 3 mm from beam position | ||
− | * Set up | + | * Set up DAQ and perform trigger studies, bullets 1 to 3 of [https://wiki.jlab.org/hps-run/images/b/be/2021_09_03_HPS_trigger_commissioning_plan.pdf] without SVT(contact Valery on the PDL phone if needed) |
− | + | * Setup nominal trigger and take data with 8 um W target at 70 nA, check occupancies in SVT using DQM, move SVT to 1.5 mm and take more data | |
<!--* Calibration runs before run ends: - DONE! | <!--* Calibration runs before run ends: - DONE! |
Revision as of 21:43, 3 September 2021
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingRun Spreadsheet 2021 2019,2016, 20152019 HPS production triggers descriptionsCOO, ESAD, RSAD Things to read before shift.Expert shift - refresher video demoRemote worker shift - requirements and responsibilitiesHPS 2021 Run discription and beam parameter requirements |
Procedures
|
Manuals |
JLab Logbooks
|
HPS (E12-11-006) 2021 run, August - October'
Beam energy 3.74 GeV
Important: Document all your work in the logbook!
Bluejeans for Run Meetings on DAY and DAY at 3 pm
RC: Stepan Stepanyan
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Valery Kubarovsky
- (757) 876-1789
- 9 876-1789 from Counting Room
Important instructions
* Turn OFF beam before target move!
* No access to the alcove if the chicane magnet beacon is ON.
Chicane magnets must be OFF if the hall is in Controlled access and access to the alcove is needed or when the hall is in Restricted access. If Chicane magnets are OFF, they can be energized only when the hall is in Power or Beam Permit, [1].
* TURN OFF the chicane magnet if beam is not available due to a thunderstorm. Loss off power would seriously damage detectors.
* Fill out BTA hourly. Click "Load from EPICS" to fill the left side, then make sure numbers are correct. If needed edit the entry.
NO ABUs or BANU if beam tune is in progress, make it all BNA with ER 100%. At the end of the shift save BTA to the logbook!
* Please close any GUI that is not being used, e.g. close harp scanner after harp scan is done, close chicane, after chicane is ON, etc.
* For orbit lock positions on 2H00(X=0.7,Y=1.1) and on 2H02(X=1.8,Y=0.1). Use the 2.82 mm SVT collimator
am profile check once a day, at 9 am, using 2H02 and SVT wire harps
Run Plan September 4 - September 7, 2021
Every Shift:
Every Run:
SVT Bias Currents:Shifters must pay attention to the L0 bias currents. This is on both the SVT motor GUI and the main bias GUI. The bias currents will slowly creep up over the course of a run. When the bias current is between 15-20 uA for either L0 sensor, do the following:
Do not let the bias current exceed 20 uA. It takes about 4-5 hours for the bias currents to creep up to those values. Call SVT expert if unsure. Harp Scan Procedure:
Important Notes:
|
General InstructionsEstablishing Physics Quality Beam for HPS:
Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA.
|
|
---|
RC daily meetings at 3 pm in the counting-house 2nd-floor conference room.
BlueJeans Info:
URL: https://jlab.bluejeans.com/759437905
Meeting ID: 759437905
|
|
|
Webcams:
|
Accelerator: |
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 329-4844 (cell) |
ECAL/Hodo | (757) 310-7198 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5244(Shift1), 5245(Shift2) |
Hall-B Counting Room | 5247(Expert), 5502(Target) |
Hall-B Counting Room | 5246(RC1), 5126(RC2) |
Hall-B Gas Shed | 7115 |
Overview
Tasks
|
Shift Worker Backup TableTo add your name, edit this wiki page or send email to Maurik or Nathan.
|