Difference between revisions of "The HPS Run Wiki"
Line 94: | Line 94: | ||
= Short Term Schedule = | = Short Term Schedule = | ||
<center><font size=+5> | <center><font size=+5> | ||
− | ''' HPS (E12-11-006) 2021 run, August - | + | ''' HPS (E12-11-006) 2021 run, August - November 5 '''<br> |
''' Beam energy 3.74 GeV '''<br> | ''' Beam energy 3.74 GeV '''<br> | ||
''' Important: Document all your work in the logbook! '''<br> | ''' Important: Document all your work in the logbook! '''<br> | ||
Line 100: | Line 100: | ||
</font></center> | </font></center> | ||
− | == RC: Rafayel Paremuzyan == | + | == RC: Maurik Holtrop, Thursday Nov 4 + Friday: Rafayel Paremuzyan == |
* (757) 575-7540 | * (757) 575-7540 | ||
* 9 575 7540 from Counting Room | * 9 575 7540 from Counting Room | ||
Line 130: | Line 130: | ||
| valign=top width=50% | | | valign=top width=50% | | ||
− | == Run Plan | + | == Run Plan Nov 1 - 5, 2021 == |
<!-- | <!-- | ||
* Restore physics quality beam for the production running at 2-pass, start from the tagger dump (see instructions on the right) | * Restore physics quality beam for the production running at 2-pass, start from the tagger dump (see instructions on the right) | ||
Line 147: | Line 147: | ||
* Start a Moeller run 'hps_1.9_Moller_v2_6.trg' for 4 hours, if statistics will be less than 300M, take another run with Moeller trigger. | * Start a Moeller run 'hps_1.9_Moller_v2_6.trg' for 4 hours, if statistics will be less than 300M, take another run with Moeller trigger. | ||
* '''Take production data''': Beam current 70 nA, target 8 um W. Each run should last about 4 hours. Trigger hps_1.9_v2_6.trg. --> | * '''Take production data''': Beam current 70 nA, target 8 um W. Each run should last about 4 hours. Trigger hps_1.9_v2_6.trg. --> | ||
− | * Take one hour Empty target run, with the same current, and the same trigger file. | + | <!-- * Take one hour Empty target run, with the same current, and the same trigger file. --> |
* Take a production data with '''hps2021_v2_3.trg''' trigger file. The beam current should be '''120 nA''', the target is '''20 um W'''. | * Take a production data with '''hps2021_v2_3.trg''' trigger file. The beam current should be '''120 nA''', the target is '''20 um W'''. | ||
** if the beam is down for less than 40 min for reasons that will not alter the beam trajectory to Hall-B, do not end the run instead pause DAQ: <font color=red> From the main hps GUI, open 'DAQ Status', click 'Pause Triggers' and confirm </font> | ** if the beam is down for less than 40 min for reasons that will not alter the beam trajectory to Hall-B, do not end the run instead pause DAQ: <font color=red> From the main hps GUI, open 'DAQ Status', click 'Pause Triggers' and confirm </font> | ||
Line 157: | Line 157: | ||
− | ===Hall Access Items (Wednesday, | + | ===Hall Access Items (Wednesday, November 3rd):=== |
* Refill SVT chiller, check ECal and FEB chiller water levels, refill if needed - experts | * Refill SVT chiller, check ECal and FEB chiller water levels, refill if needed - experts | ||
Revision as of 14:24, 1 November 2021
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingRun Spreadsheet 2021 2019,2016, 20152019-2021 HPS triggers descriptionsCOO, ESAD, RSAD Things to read before shift.Expert shift - refresher video demoRemote worker shift - requirements and responsibilitiesHPS 2021 Run discription and beam parameter requirements |
Procedures
|
Manuals |
JLab Logbooks
|
HPS (E12-11-006) 2021 run, August - November 5
Beam energy 3.74 GeV
Important: Document all your work in the logbook!
Bluejeans for Run Meetings on DAY and DAY at 3 pm
RC: Maurik Holtrop, Thursday Nov 4 + Friday: Rafayel Paremuzyan
- (757) 575-7540
- 9 575 7540 from Counting Room
- Personal cell: +1 (757) 753-7769
PDL: Valery Kubarovsky
- (757) 876-1789
- 9 876-1789 from Counting Room
Important instructions
* Turn OFF beam before target move!
* No access to the alcove if the chicane magnet beacon is ON.
Chicane magnets must be OFF if the hall is in Controlled access and access to the alcove is needed or when the hall is in Restricted access. If Chicane magnets are OFF, they can be energized only when the hall is in Power or Beam Permit, [1].
* Energizing the chicane: Please read the "Turning Chicane ONN/OFF" document and ask if anything is not clear. When you pushe the ON button make sure current readbacks will behave as it is described in the scction III "Sequenc details"
* TURN OFF the chicane magnet if beam is not available due to a thunderstorm. Loss off power would seriously damage detectors.
* Fill out BTA hourly. Click "Load from EPICS" to fill the left side, then make sure numbers are correct. If needed edit the entry.
NO ABUs or BANU if beam tune is in progress, make it all BNA with ER 100%. At the end of the shift save BTA to the logbook!
* Please close any GUI that is not being used, e.g. close harp scanner after harp scan is done, close chicane, after chicane is ON, etc.
* For orbit lock positions on 2H00(X=1.14,Y=-2.9 and on 2H02(X=-2.5,Y=-1.2). Use the 2.82 mm SVT collimator
Before 9/9 this was: 2H00(X=0.3,Y=-1.) and on 2H02(X=-2.4,Y=-1.). Use the 2.82 mm SVT collimator
Run Plan Nov 1 - 5, 2021
Hall Access Items (Wednesday, November 3rd):
Every Shift:
Every Run:
SVT Bias Currents:Shifters must pay attention to the L0 bias currents. This is on both the SVT motor GUI and the main bias GUI. The bias currents will slowly creep up over the course of a run. When the bias current is between 15-20 uA for either L0 sensor, do the following:
Do not let the bias current exceed 20 uA. It takes about 4-5 hours for the bias currents to creep up to those values. Call SVT expert if unsure. Harp Scan Procedure:
Important Notes:
|
General InstructionsEstablishing Physics Quality Beam for HPS:
Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA.
|
|
---|
RC daily meetings at 3 pm in the counting-house 2nd-floor conference room.
BlueJeans Info:
URL: https://bluejeans.com/759437905/8110
Meeting ID: 759437905
|
|
|
Webcams:
|
Accelerator: |
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 232-6221 (cell) |
SVT | (757) 329-4844 (cell) |
ECAL/Hodo | (757) 310-7198 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5244(Shift1), 5245(Shift2) |
Hall-B Counting Room | 5247(Expert), 5502(Target) |
Hall-B Counting Room | 5246(RC1), 5126(RC2) |
Hall-B Gas Shed | 7115 |
Overview
Tasks
|
Shift Worker Backup TableTo add your name, edit this wiki page or send email to Maurik or Nathan.
|