Difference between revisions of "The HPS Run Wiki"
(38 intermediate revisions by 4 users not shown) | |||
Line 94: | Line 94: | ||
= Short Term Schedule = | = Short Term Schedule = | ||
<center><font size=+5> | <center><font size=+5> | ||
− | ''' HPS (E12-11-006) 2021 run, August - | + | ''' HPS (E12-11-006) 2021 run, August - November 5 '''<br> |
''' Beam energy 3.74 GeV '''<br> | ''' Beam energy 3.74 GeV '''<br> | ||
''' Important: Document all your work in the logbook! '''<br> | ''' Important: Document all your work in the logbook! '''<br> | ||
Line 100: | Line 100: | ||
</font></center> | </font></center> | ||
− | == RC: | + | == RC: Maurik Holtrop, Thursday Nov 4 + Friday: Rafayel Paremuzyan == |
* (757) 575-7540 | * (757) 575-7540 | ||
* 9 575 7540 from Counting Room | * 9 575 7540 from Counting Room | ||
Line 114: | Line 114: | ||
=== <font color=red> * Energizing the chicane: Please read the "Turning Chicane ONN/OFF" document and ask if anything is not clear. When you pushe the ''' ON''' button make sure current readbacks will behave as it is described in the scction III "'''Sequenc details'''" </font> === | === <font color=red> * Energizing the chicane: Please read the "Turning Chicane ONN/OFF" document and ask if anything is not clear. When you pushe the ''' ON''' button make sure current readbacks will behave as it is described in the scction III "'''Sequenc details'''" </font> === | ||
=== <font color=red> * TURN OFF the chicane magnet if beam is not available due to a thunderstorm. Loss off power would seriously damage detectors.</font> === | === <font color=red> * TURN OFF the chicane magnet if beam is not available due to a thunderstorm. Loss off power would seriously damage detectors.</font> === | ||
− | |||
=== * [https://bta.acc.jlab.org Fill out BTA] hourly. Click "Load from EPICS" to fill the left side, then make sure numbers are correct. If needed edit the entry. === | === * [https://bta.acc.jlab.org Fill out BTA] hourly. Click "Load from EPICS" to fill the left side, then make sure numbers are correct. If needed edit the entry. === | ||
NO ABUs or BANU if beam tune is in progress, make it all BNA with ER 100%. At the end of the shift save BTA to the logbook! | NO ABUs or BANU if beam tune is in progress, make it all BNA with ER 100%. At the end of the shift save BTA to the logbook! | ||
=== * Please close any GUI that is not being used, e.g. close harp scanner after harp scan is done, close chicane, after chicane is ON, etc. === | === * Please close any GUI that is not being used, e.g. close harp scanner after harp scan is done, close chicane, after chicane is ON, etc. === | ||
+ | <!-- === * <b>For orbit lock positions on <font color=red>2H00(X=0.3,Y=-1.) and on 2H02(X=-2.7,Y=-0.9). Use the 2.82 mm SVT collimator </font></b> === --> | ||
+ | === * <b>For orbit lock positions on <font color=red>2H00(X=1.14,Y=-2.9 and on 2H02(X=-2.5,Y=-1.1). Use the 2.82 mm SVT collimator </font></b> === | ||
+ | <!-- | ||
+ | === * <b>Orbit lock positions for <font color=red> one pass beam</font> are <font color=red>2H00(X=1.14,Y=-2.9) and 2H02(X=-1.8,Y=-1.2). Use the 2.82 mm SVT collimator </font></b> === | ||
+ | === * <b> <font color=red> For 1 pass beam with 70 nA beam current, we should not use the beam blocker. This instruction supersedes the beam blocker requirement in the section "Important Notes" </font></b> === | ||
+ | --> | ||
− | |||
Before 9/9 this was: 2H00(X=0.3,Y=-1.) and on 2H02(X=-2.4,Y=-1.). Use the 2.82 mm SVT collimator | Before 9/9 this was: 2H00(X=0.3,Y=-1.) and on 2H02(X=-2.4,Y=-1.). Use the 2.82 mm SVT collimator | ||
Line 126: | Line 130: | ||
| valign=top width=50% | | | valign=top width=50% | | ||
− | == Run Plan | + | == Run Plan Nov 1 - 5, 2021 == |
+ | <!-- | ||
+ | * Restore physics quality beam for the production running at 2-pass, start from the tagger dump (see instructions on the right) | ||
+ | |||
+ | |||
+ | * After desired beam profile and positions are | ||
− | |||
− | |||
− | |||
− | |||
* Special runs: ''' After October 15 morning run ends''' | * Special runs: ''' After October 15 morning run ends''' | ||
** Low Luminosity run: trigger '''file hps2021_v2_3.trg''', beam current ''' 60 nA''', target '''20 um''', '''4 hours'''. | ** Low Luminosity run: trigger '''file hps2021_v2_3.trg''', beam current ''' 60 nA''', target '''20 um''', '''4 hours'''. | ||
** Random Trigger Run. Trigger file '''hps2021_v2_2_30kHz_random.trg''' Target '''20 um''', Beam current '''120 nA''', Duration about '''1 hour with a good beam''' (Good means beam off should be less than 20% of the | ** Random Trigger Run. Trigger file '''hps2021_v2_2_30kHz_random.trg''' Target '''20 um''', Beam current '''120 nA''', Duration about '''1 hour with a good beam''' (Good means beam off should be less than 20% of the | ||
** Moeller run: Trigger file '''hps2021_v2_2_moller_LowLumi.trg''', Beam current '''50 nA''', Target '''8 um''', 200 M events. | ** Moeller run: Trigger file '''hps2021_v2_2_moller_LowLumi.trg''', Beam current '''50 nA''', Target '''8 um''', 200 M events. | ||
− | + | * '''Take production data''': 120 nA beam on the 20 um W target, PROD77 configuration, production trigger '''hps2021_v2_3.trg'''. Each run should last about 4 hours. | |
− | * '''Take production data | + | * '''Setup production data taking''': Start 50 nA beam on the 8 um W target, PROD77 configuration, production trigger '''hps_1.9_v2_3.trg'''. Turn ON detectors, bring SVT in to 0.5 mm. Start the run and check occupancies. Increase the beam current (up to 100 nA) until you reach occupancies of ~1.5% for L0t and L0b. End run and start a new one. |
+ | * We will try to have the beam on FCup. with 8 mm collimator in place, <font color=red> No Halo FSD should be masked at this step. </font> | ||
+ | ** If the beam passes through successfully, then we should ask the beam to be off, and put the 2.88 mm collimator, and do 2H02, SVT top and bottom scans to make sure beam position and profile are good. | ||
+ | * Start a Moeller run 'hps_1.9_Moller_v2_6.trg' for 4 hours, if statistics will be less than 300M, take another run with Moeller trigger. | ||
+ | * '''Take production data''': Beam current 70 nA, target 8 um W. Each run should last about 4 hours. Trigger hps_1.9_v2_6.trg. --> | ||
+ | <!-- * Take one hour Empty target run, with the same current, and the same trigger file. --> | ||
+ | <!-- * Stright through run: | ||
+ | ** Target out, 50 nA beam, 2H02 harp horizontal wire should come closer to the beam, trigger file hps2021_FEE_straight_v2_2.trg, take 50 M events | ||
+ | ** Target out, 50 nA beam, SVT collimator wire should come closer to the beam, trigger file hps2021_FEE_straight_v2_2.trg, take 50 M events--> | ||
+ | * Take a production data with '''hps2021_v2_3.trg''' trigger file. The beam current should be '''120 nA''', the target is '''20 um W'''. | ||
** if the beam is down for less than 40 min for reasons that will not alter the beam trajectory to Hall-B, do not end the run instead pause DAQ: <font color=red> From the main hps GUI, open 'DAQ Status', click 'Pause Triggers' and confirm </font> | ** if the beam is down for less than 40 min for reasons that will not alter the beam trajectory to Hall-B, do not end the run instead pause DAQ: <font color=red> From the main hps GUI, open 'DAQ Status', click 'Pause Triggers' and confirm </font> | ||
** Then retract the SVT to 3 mm, leave the bias voltages ON. After the beam is back and the halo and the detector rates look the same, bring the SVT to 0.5 mm and Resume DAQ: <font color=red> From the main hps GUI, open 'DAQ Status', click 'Resume Triggers' and confirm" </font> | ** Then retract the SVT to 3 mm, leave the bias voltages ON. After the beam is back and the halo and the detector rates look the same, bring the SVT to 0.5 mm and Resume DAQ: <font color=red> From the main hps GUI, open 'DAQ Status', click 'Resume Triggers' and confirm" </font> | ||
** <font color=red> PLEASE close 'Are you sure want to pause trigger' and 'Are you sure want to Resume triggers' windows when you are done </font> | ** <font color=red> PLEASE close 'Are you sure want to pause trigger' and 'Are you sure want to Resume triggers' windows when you are done </font> | ||
* Anytime MCC turns OFF or ON Hall-C, HPS SVT bias HV must be OFF, SVT retracted to 3 mm position. After the transition is complete, and the beam to Hall-B is established, perform a 2H02 harp scan at 100 nA and compare with previous scans. IF consistent (within a few 10s microns), precede with production running. | * Anytime MCC turns OFF or ON Hall-C, HPS SVT bias HV must be OFF, SVT retracted to 3 mm position. After the transition is complete, and the beam to Hall-B is established, perform a 2H02 harp scan at 100 nA and compare with previous scans. IF consistent (within a few 10s microns), precede with production running. | ||
+ | |||
+ | <!-- ===At 8 am on Friday, October 2, beam will be OFF for the pass change. Hall-B goes back to the 2nd-pass, Hall-A takes the 1st-pass=== --> | ||
− | ===Hall Access Items ( | + | ===Hall Access Items (Wednesday, November 3rd):=== |
* Refill SVT chiller, check ECal and FEB chiller water levels, refill if needed - experts | * Refill SVT chiller, check ECal and FEB chiller water levels, refill if needed - experts | ||
− | |||
<!-- | <!-- | ||
Line 252: | Line 267: | ||
#* Follow the instructions under "Procedures" on the documentation tab for "Beamline"[https://wiki.jlab.org/hps-run/images/1/1e/HPS_beam_estab.pdf] to establish beam to the electron dump. | #* Follow the instructions under "Procedures" on the documentation tab for "Beamline"[https://wiki.jlab.org/hps-run/images/1/1e/HPS_beam_estab.pdf] to establish beam to the electron dump. | ||
<b> Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA.</b> | <b> Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA.</b> | ||
− | #* Ask MCC to establish 30 nA beam with <font color=red>HPS</font> orbit locks on (We need '''HallBHPSOrb''' not '''HallBOrb''' configuration)<b>, then gradually increase to 100 nA. For orbit lock | + | #* Ask MCC to establish 30 nA beam with <font color=red>HPS</font> orbit locks on (We need '''HallBHPSOrb''' not '''HallBOrb''' configuration)<b>, then gradually increase to 100 nA. For orbit lock position values see "Important instructions" section at top of the page <!-- on <font color=red>2H00(X=0.3,Y=-1.) and on 2H02(X=-2.7,Y=-0.90)-->. Use the 2.82 mm SVT collimator. (positions changed 10/3/21 by mg)</font></b>. |
#* Tune beam profile at HPS using measured widths 2H02A harps. The required beam profile at 2H02A harp is: X-width <~0.1 mm, Y-width <~ 0.05 mm. Compare the beam profile measured with 2H02A harps with previous scans ([https://logbooks.jlab.org/entry/3696650],[https://logbooks.jlab.org/entry/3903891]). | #* Tune beam profile at HPS using measured widths 2H02A harps. The required beam profile at 2H02A harp is: X-width <~0.1 mm, Y-width <~ 0.05 mm. Compare the beam profile measured with 2H02A harps with previous scans ([https://logbooks.jlab.org/entry/3696650],[https://logbooks.jlab.org/entry/3903891]). | ||
#* Check and log the beam spot on chromax viewer | #* Check and log the beam spot on chromax viewer | ||
Line 393: | Line 408: | ||
| 08/23 - 09/02 || Tim Nelson | | 08/23 - 09/02 || Tim Nelson | ||
|- | |- | ||
− | |09/02 - | + | |09/02 - 10/04 || Cameron Bravo |
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
− | | - || Vitaliy Fadeyev | + | | 10/04 - 10/15 || Vitaliy Fadeyev |
|- | |- | ||
− | | - || | + | |10/15 - || Alic Spellman |
|} | |} | ||
Line 425: | Line 436: | ||
* [http://cctv1.jlab.org Tagger Dump] | * [http://cctv1.jlab.org Tagger Dump] | ||
* [http://hallbcam08.jlab.org Faraday Cup] | * [http://hallbcam08.jlab.org Faraday Cup] | ||
+ | ** To reboot it, run <tt>beam-viewer-reboot</tt> (open a fresh terminal if error message contains "proxy") | ||
* [http://hallbcam03.jlab.org Alcove, SVT Chiller] | * [http://hallbcam03.jlab.org Alcove, SVT Chiller] | ||
** To reboot it, run <tt>reboot-svt-camera</tt> | ** To reboot it, run <tt>reboot-svt-camera</tt> | ||
Line 496: | Line 508: | ||
|style="border-bottom:3px solid gray;" | '''Gate House Guard''' ||style="border-bottom:3px solid gray;"| '''5822''' | |style="border-bottom:3px solid gray;" | '''Gate House Guard''' ||style="border-bottom:3px solid gray;"| '''5822''' | ||
|- | |- | ||
− | | DAQ/Online || (757) 869-2188 (cell) | + | | DAQ/Online || (757) 232-6221 <!--(757) 869-2188--> (cell) |
|- | |- | ||
|SVT || (757) 329-4844 (cell) | |SVT || (757) 329-4844 (cell) |
Latest revision as of 21:34, 4 November 2021
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingRun Spreadsheet 2021 2019,2016, 20152019-2021 HPS triggers descriptionsCOO, ESAD, RSAD Things to read before shift.Expert shift - refresher video demoRemote worker shift - requirements and responsibilitiesHPS 2021 Run discription and beam parameter requirements |
Procedures
|
Manuals |
JLab Logbooks
|
HPS (E12-11-006) 2021 run, August - November 5
Beam energy 3.74 GeV
Important: Document all your work in the logbook!
Bluejeans for Run Meetings on DAY and DAY at 3 pm
RC: Maurik Holtrop, Thursday Nov 4 + Friday: Rafayel Paremuzyan
- (757) 575-7540
- 9 575 7540 from Counting Room
- Personal cell: +1 (757) 753-7769
PDL: Valery Kubarovsky
- (757) 876-1789
- 9 876-1789 from Counting Room
Important instructions
* Turn OFF beam before target move!
* No access to the alcove if the chicane magnet beacon is ON.
Chicane magnets must be OFF if the hall is in Controlled access and access to the alcove is needed or when the hall is in Restricted access. If Chicane magnets are OFF, they can be energized only when the hall is in Power or Beam Permit, [1].
* Energizing the chicane: Please read the "Turning Chicane ONN/OFF" document and ask if anything is not clear. When you pushe the ON button make sure current readbacks will behave as it is described in the scction III "Sequenc details"
* TURN OFF the chicane magnet if beam is not available due to a thunderstorm. Loss off power would seriously damage detectors.
* Fill out BTA hourly. Click "Load from EPICS" to fill the left side, then make sure numbers are correct. If needed edit the entry.
NO ABUs or BANU if beam tune is in progress, make it all BNA with ER 100%. At the end of the shift save BTA to the logbook!
* Please close any GUI that is not being used, e.g. close harp scanner after harp scan is done, close chicane, after chicane is ON, etc.
* For orbit lock positions on 2H00(X=1.14,Y=-2.9 and on 2H02(X=-2.5,Y=-1.1). Use the 2.82 mm SVT collimator
Before 9/9 this was: 2H00(X=0.3,Y=-1.) and on 2H02(X=-2.4,Y=-1.). Use the 2.82 mm SVT collimator
Run Plan Nov 1 - 5, 2021
Hall Access Items (Wednesday, November 3rd):
Every Shift:
Every Run:
SVT Bias Currents:Shifters must pay attention to the L0 bias currents. This is on both the SVT motor GUI and the main bias GUI. The bias currents will slowly creep up over the course of a run. When the bias current is between 15-20 uA for either L0 sensor, do the following:
Do not let the bias current exceed 20 uA. It takes about 4-5 hours for the bias currents to creep up to those values. Call SVT expert if unsure. Harp Scan Procedure:
Important Notes:
|
General InstructionsEstablishing Physics Quality Beam for HPS:
Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA.
|
|
---|
RC daily meetings at 3 pm in the counting-house 2nd-floor conference room.
BlueJeans Info:
URL: https://bluejeans.com/759437905/8110
Meeting ID: 759437905
|
|
|
Webcams:
|
Accelerator: |
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 232-6221 (cell) |
SVT | (757) 329-4844 (cell) |
ECAL/Hodo | (757) 310-7198 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5244(Shift1), 5245(Shift2) |
Hall-B Counting Room | 5247(Expert), 5502(Target) |
Hall-B Counting Room | 5246(RC1), 5126(RC2) |
Hall-B Gas Shed | 7115 |
Overview
Tasks
|
Shift Worker Backup TableTo add your name, edit this wiki page or send email to Maurik or Nathan.
|