Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 122: | Line 122: | ||
# If it's not an HPS halo counter trip, MCC is instructed to restore the beam. As soon beam is back and stable restore SVT HV. | # If it's not an HPS halo counter trip, MCC is instructed to restore the beam. As soon beam is back and stable restore SVT HV. | ||
# If it is an HPS halo counter trip, inform MCC that we will get back to them when we are ready for beam. | # If it is an HPS halo counter trip, inform MCC that we will get back to them when we are ready for beam. | ||
− | # Retract the SVT to its 1.5 mm stations, both top and bottom. | + | #* Retract the SVT to its 1.5 mm stations, both top and bottom. |
− | # Tell MCC we are ready for beam. | + | #* Tell MCC we are ready for beam. |
− | # Once beam is restored, confirm that 2H02 beam positions x and y are as desired; and confirm that halo counter rates are as expected. | + | #* Once beam is restored, confirm that 2H02 beam positions x and y are as desired; and confirm that halo counter rates are as expected. |
− | # Once beam is stable for ~ 1 minute, restore SVT HV, and the SVT to its nominal position. | + | #* Once beam is stable for ~ 1 minute, restore SVT HV, and the SVT to its nominal position. |
# Resume data taking. | # Resume data taking. | ||
Revision as of 21:05, 12 May 2015
[edit]
First rule of HPS: Document all your work in the logbook!
Important Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingHPS Run Spreadsheet |
Procedures
|
Manuals |
JLab Logbooks
|
RC: Nathan Baltzell
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Stepan Stepanyan
Run Plan for May 2 - 8, 2015:During week days, Mon-Thursday, there will be no Day shifts due to work in the hall. We will be running with 1.05GeV beam. This beam needs to be carefully restored, first to the tagger dump, then to the alcove and Faraday cup screen. See detailed instructions in the right pannel. Short term schedule:
Miscellaneous Notes:
|
General Instructions: Recovering from beam trips when running SVT at 0.5 mm
Every Shift:
Every Run:
Setting up chicane for E=1.056 GeVNote: This requires only Beam Permit and NO beam to HPS / Faraday Cup. This CAN be done before or during tuning beam on the Tagger Dump.
SVT Instructions:
ECAL Instructions:
Acceptable Beam Conditions:
|
|
|
|
Webcams: |
Trigger: |
Accelerator: Slow Controls:
|
Online & Offline: |