Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 123: | Line 123: | ||
* SVT HV will trip off automatically | * SVT HV will trip off automatically | ||
# Check the FSD GUI to see if high rates in the HPS halo counters generated the trip | # Check the FSD GUI to see if high rates in the HPS halo counters generated the trip | ||
− | # If it | + | # If it was not an HPS halo counter trip, MCC will restore the beam as usual (following their own instructions). As soon beam is back and stable, restore SVT HV. |
− | # If it | + | # If it was an HPS halo counter trip, MCC will not restore the beam. Inform MCC that we will get back to them when we are ready for beam. |
#* Retract the SVT to its 1.5 mm stations, both top and bottom. | #* Retract the SVT to its 1.5 mm stations, both top and bottom. | ||
#* Tell MCC we are ready for beam. | #* Tell MCC we are ready for beam. | ||
− | #* Once beam is restored, confirm that 2H02 beam positions x and y are as desired | + | #* Once beam is restored, confirm that both 2H02 beam positions x and y are as desired and halo counter rates are as expected. |
− | #* Once beam is stable for ~ 1 minute, restore SVT HV | + | #* Once beam is stable for ~1 minute, restore SVT HV and the SVT to its nominal position. |
# Resume data taking. | # Resume data taking. | ||
Line 134: | Line 134: | ||
# Follow run plan as outlined by RC | # Follow run plan as outlined by RC | ||
− | # Ask MCC if orbit locks are on | + | # Ask MCC if orbit locks are on (they should be). |
− | # Keep shift summary up | + | # Keep shift summary up to date in HBLOG. Record all that happens. |
#* Check on white board all scalers, strip charts and monitoring plots that need to be logged regularly | #* Check on white board all scalers, strip charts and monitoring plots that need to be logged regularly | ||
#* Document any beam condition change and send scaler GUIs to HBLOG | #* Document any beam condition change and send scaler GUIs to HBLOG | ||
− | #* Fill the | + | #* Fill and submit the [https://logbooks.jlab.org/checklists/151 shift checklist in the logbook] |
− | |||
# Perform 2H02A harp scan once per shift or when beam conditions have changed, based on beam monitors (BPMs, halo rates, beam-viewer) | # Perform 2H02A harp scan once per shift or when beam conditions have changed, based on beam monitors (BPMs, halo rates, beam-viewer) | ||
− | # With any issue contact On-Call Experts or RC | + | # '''With any issue contact On-Call Experts or RC''' |
===Every Run:=== | ===Every Run:=== | ||
# '''After''' "Prestart" but '''before''' "Go", [https://logbooks.jlab.org/entry/3337933 Check ECal Latency] | # '''After''' "Prestart" but '''before''' "Go", [https://logbooks.jlab.org/entry/3337933 Check ECal Latency] | ||
# After "Go": [https://logbooks.jlab.org/entry/3337784 Check SVT Occupancy] | # After "Go": [https://logbooks.jlab.org/entry/3337784 Check SVT Occupancy] | ||
− | # Update the run spreadsheet. | + | # Update the run spreadsheet on [https://docs.google.com/spreadsheets/d/1l1NurPpsmpgZKgr1qoQpLQBBLz1sszLz4xZF-So4xs8/edit#gid=43855609 Google Docs]. |
<!--# Do NOT do this: <s>After end of a Non-Junk run, [https://logbooks.jlab.org/entry/3337942 Copy the Run To Tape]</s>--> | <!--# Do NOT do this: <s>After end of a Non-Junk run, [https://logbooks.jlab.org/entry/3337942 Copy the Run To Tape]</s>--> | ||
# See the '''whiteboard''' for everything else that should be done on a per-run basis. | # See the '''whiteboard''' for everything else that should be done on a per-run basis. |
Revision as of 18:12, 13 May 2015
[edit]
Daily Run Meeting at 15:00
Daily Run Meeting at 15:00
First rule of HPS: Document all your work in the logbook!
Important Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingHPS Run Spreadsheet |
Procedures
|
Manuals |
JLab Logbooks
|
RC: Nathan Baltzell
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Stepan Stepanyan
Run Plan for May 10 - 18, 2015:During week days, Mon-Thursday, there will be no Day shifts due to work in the hall. We will be running with 1.05GeV beam. This beam needs to be carefully restored, first to the tagger dump, then to the alcove and Faraday cup screen. See detailed instructions in the right pannel. Short term schedule:
Miscellaneous Notes:
|
General Instructions: Recovering from beam trips when running SVT at 0.5 mm
Every Shift:
Every Run:
Setting up chicane for E=1.056 GeVNote: This requires only Beam Permit and NO beam to HPS / Faraday Cup. This CAN be done before or during tuning beam on the Tagger Dump.
SVT Instructions:
ECAL Instructions:
Acceptable Beam Conditions:
|
|
|
|
Webcams: |
Trigger: |
Accelerator: Slow Controls:
|
Online & Offline: |