Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 110: | Line 110: | ||
=== Miscellaneous Notes: === | === Miscellaneous Notes: === | ||
− | |||
# <b> If you change beam current current, turn orbit locks off first, there is a current - position dependence on the stripline BPMs 2H00 and 2H02 </b> | # <b> If you change beam current current, turn orbit locks off first, there is a current - position dependence on the stripline BPMs 2H00 and 2H02 </b> | ||
# Do NOT change magnet currents when beam is on | # Do NOT change magnet currents when beam is on | ||
Line 120: | Line 119: | ||
==<font color=blue><b>General Instructions:</b></font>== | ==<font color=blue><b>General Instructions:</b></font>== | ||
− | <font color=red | + | ===<font color=red>Recovering from beam trips when running SVT at 0.5 mm:</font>=== |
− | + | # SVT HV will trip off automatically | |
# Check the FSD GUI to see if high rates in the HPS halo counters generated the trip | # Check the FSD GUI to see if high rates in the HPS halo counters generated the trip | ||
− | # If it was not an HPS halo counter trip, MCC will restore the beam as usual (following their own instructions). As soon beam is back and stable, restore SVT HV. | + | #* If it was not an HPS halo counter trip, MCC will restore the beam as usual (following their own instructions). As soon beam is back and stable, restore SVT HV. |
− | # If it was an HPS halo counter trip, MCC will not restore the beam. Inform MCC that we will get back to them when we are ready for beam. | + | #* If it was an HPS halo counter trip, MCC will not restore the beam. Inform MCC that we will get back to them when we are ready for beam. |
− | #* Retract the SVT to its 1.5 mm stations, both top and bottom. | + | #*# Retract the SVT to its 1.5 mm stations, both top and bottom. |
− | #* Tell MCC we are ready for beam. | + | #*# Tell MCC we are ready for beam. |
− | #* Once beam is restored, confirm that both 2H02 beam positions x and y are as desired and halo counter rates are as expected. | + | #*# Once beam is restored, confirm that both 2H02 beam positions x and y are as desired and halo counter rates are as expected. |
− | #* Once beam is stable for ~1 minute, restore SVT HV and the SVT to its nominal position. | + | #*# Once beam is stable for ~1 minute, restore SVT HV and the SVT to its nominal position. |
− | # Resume data taking. | + | #*# Resume data taking. |
===Every Shift:=== | ===Every Shift:=== | ||
− | |||
# Follow run plan as outlined by RC | # Follow run plan as outlined by RC | ||
# If any concern about beam stability, ask MCC if orbit locks are on (they should be). | # If any concern about beam stability, ask MCC if orbit locks are on (they should be). | ||
Line 163: | Line 161: | ||
===ECAL Instructions:=== | ===ECAL Instructions:=== | ||
− | |||
*For additional info on beam quality, HV can be ON when Tagger Magnet is on and tuning beam to the Tagger Dump. | *For additional info on beam quality, HV can be ON when Tagger Magnet is on and tuning beam to the Tagger Dump. | ||
**To be useful, this requires DAQ Prestarted and ECAL Scaler GUIs running and monitored. | **To be useful, this requires DAQ Prestarted and ECAL Scaler GUIs running and monitored. | ||
Line 171: | Line 168: | ||
===Acceptable Beam Conditions:=== | ===Acceptable Beam Conditions:=== | ||
− | |||
# <b> To establish good beam conditions first send beam to the tagger dump (ask MCC to turn ON the tagger).</b> | # <b> To establish good beam conditions first send beam to the tagger dump (ask MCC to turn ON the tagger).</b> | ||
## Check the beam position on the tagger viewer, it should be approximately in the center of the screen | ## Check the beam position on the tagger viewer, it should be approximately in the center of the screen |
Revision as of 18:18, 13 May 2015
[edit]
Daily Run Meeting at 15:00
Daily Run Meeting at 15:00
First rule of HPS: Document all your work in the logbook!
Important Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingHPS Run Spreadsheet |
Procedures
|
Manuals |
JLab Logbooks
|
RC: Nathan Baltzell
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Stepan Stepanyan
Run Plan for May 10 - 18, 2015:During week days, Mon-Thursday, there will be no Day shifts due to work in the hall. We will be running with 1.05GeV beam. This beam needs to be carefully restored, first to the tagger dump, then to the alcove and Faraday cup screen. See detailed instructions in the right pannel. Short term schedule:
Miscellaneous Notes:
|
General Instructions:Recovering from beam trips when running SVT at 0.5 mm:
Every Shift:
Every Run:
Setting up chicane for E=1.056 GeVNote: This requires only Beam Permit and NO beam to HPS / Faraday Cup. This CAN be done before or during tuning beam on the Tagger Dump.
SVT Instructions:
ECAL Instructions:
Acceptable Beam Conditions:
|
|
|
|
Webcams: |
Trigger: |
Accelerator: Slow Controls:
|
Online & Offline: |