Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 147: | Line 147: | ||
# See the '''whiteboard''' for everything else that should be done on a per-run basis. | # See the '''whiteboard''' for everything else that should be done on a per-run basis. | ||
− | ===Setting up | + | ===Setting up Chicane for E=1.056 GeV:=== |
'''Note:''' This requires only Beam Permit and NO beam to HPS / Faraday Cup. This should be started before (or during) beam tuning on the Tagger Dump. | '''Note:''' This requires only Beam Permit and NO beam to HPS / Faraday Cup. This should be started before (or during) beam tuning on the Tagger Dump. | ||
# Turn on chicane power supplies following provided instructions on the documentation page on "Turning Chicane ON/OFF" | # Turn on chicane power supplies following provided instructions on the documentation page on "Turning Chicane ON/OFF" | ||
Line 172: | Line 172: | ||
## Check profile using 2C21 and tagger harp scans, and compare the positions and widths with previous scans ([https://logbooks.jlab.org/entry/3337615],[https://logbooks.jlab.org/entry/3337612]). Positions on both harps should be with +/- 1mm, widths on 2C21 shoud be ~0.05 within 0.05 mm, and on the tagger harp ~0.35mm within 0.1mm. | ## Check profile using 2C21 and tagger harp scans, and compare the positions and widths with previous scans ([https://logbooks.jlab.org/entry/3337615],[https://logbooks.jlab.org/entry/3337612]). Positions on both harps should be with +/- 1mm, widths on 2C21 shoud be ~0.05 within 0.05 mm, and on the tagger harp ~0.35mm within 0.1mm. | ||
## Halo counters TAG-L/T/T2 should be ~10Hz/nA [https://logbooks.jlab.org/entry/3338763], | ## Halo counters TAG-L/T/T2 should be ~10Hz/nA [https://logbooks.jlab.org/entry/3338763], | ||
− | # <b> While MCC degausses the tagger magnet, | + | # <b> While MCC degausses the tagger magnet, verify that chicane is ON</b> |
#* Strictly follow the procedure in the beam line manual! | #* Strictly follow the procedure in the beam line manual! | ||
# <b> Before sending beam to the Faraday cup</b> | # <b> Before sending beam to the Faraday cup</b> |
Revision as of 18:31, 13 May 2015
[edit]
Daily Run Meeting at 15:00
Daily Run Meeting at 15:00
First rule of HPS: Document all your work in the logbook!
Important Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingHPS Run Spreadsheet |
Procedures
|
Manuals |
JLab Logbooks
|
RC: Nathan Baltzell
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Stepan Stepanyan
Run Plan for May 10 - 18, 2015:During week days, Mon-Thursday, there will be no Day shifts due to work in the hall. We will be running with 1.05GeV beam. This beam needs to be carefully restored, first to the tagger dump, then to the alcove and Faraday cup screen. See detailed instructions in the right pannel. Short term schedule:
Miscellaneous Notes:
|
General Instructions:Recovering from beam trips when running SVT at 0.5 mm:
Every Shift:
Every Run:
Setting up Chicane for E=1.056 GeV:Note: This requires only Beam Permit and NO beam to HPS / Faraday Cup. This should be started before (or during) beam tuning on the Tagger Dump.
SVT Instructions:
ECAL Instructions:
Acceptable Beam Conditions:
|
|
|
|
Webcams: |
Trigger: |
Accelerator: Slow Controls:
|
Online & Offline: |