Line 171: | Line 171: | ||
===Acceptable Beam Conditions:=== | ===Acceptable Beam Conditions:=== | ||
# <b> To establish good beam conditions</b> | # <b> To establish good beam conditions</b> | ||
− | ## <font color='red'>Turn SVT completely OFF (see above)</font> | + | ## <font color='red'>Turn SVT completely OFF (see above)</font> |
− | ## First send beam to the tagger dump (ask MCC to turn ON the tagger) | + | ## First send beam to the tagger dump (ask MCC to turn ON the tagger), meanwhile turning on the Chicane (see above) |
## Check the beam position on the tagger viewer, it should be approximately in the center of the screen | ## Check the beam position on the tagger viewer, it should be approximately in the center of the screen | ||
## Check profile using 2C21 and tagger harp scans, and compare the positions and widths with previous scans ([https://logbooks.jlab.org/entry/3337615],[https://logbooks.jlab.org/entry/3337612]). Positions on both harps should be with +/- 1mm, widths on 2C21 shoud be ~0.05 within 0.05 mm, and on the tagger harp ~0.35mm within 0.1mm. | ## Check profile using 2C21 and tagger harp scans, and compare the positions and widths with previous scans ([https://logbooks.jlab.org/entry/3337615],[https://logbooks.jlab.org/entry/3337612]). Positions on both harps should be with +/- 1mm, widths on 2C21 shoud be ~0.05 within 0.05 mm, and on the tagger harp ~0.35mm within 0.1mm. |
Revision as of 18:41, 13 May 2015
[edit]
Daily Run Meeting at 15:00
Daily Run Meeting at 15:00
First rule of HPS: Document all your work in the logbook!
Important Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingHPS Run Spreadsheet |
Procedures
|
Manuals |
JLab Logbooks
|
RC: Nathan Baltzell
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Stepan Stepanyan
Run Plan for May 10 - 18, 2015:During week days, Mon-Thursday, there will be no Day shifts due to work in the hall. We will be running with 1.05GeV beam. This beam needs to be carefully restored, first to the tagger dump, then to the alcove and Faraday cup screen. See detailed instructions in the right pannel. Short term schedule:
Miscellaneous Notes:
|
General Instructions:Recovering from beam trips when running SVT at 0.5 mm:
Every Shift:
Every Run:
Setting up Chicane for E=1.056 GeV:Note: This requires only Beam Permit and NO beam to HPS / Faraday Cup. This should be started before (or during) beam tuning on the Tagger Dump.
SVT Instructions:
ECAL Instructions:
Acceptable Beam Conditions:
|
|
|
|
Webcams: |
Trigger: |
Accelerator: Slow Controls:
|
Online & Offline: |