Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 167: | Line 167: | ||
=== Important Notes: === | === Important Notes: === | ||
# '''Do not run more than 60 minutes above 30 nA without the beam blocker in front of Faraday cup. Put beam blocker in for long running at high currents.''' | # '''Do not run more than 60 minutes above 30 nA without the beam blocker in front of Faraday cup. Put beam blocker in for long running at high currents.''' | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
==[[SVT RECOVERY PROCDURES]]== | ==[[SVT RECOVERY PROCDURES]]== | ||
Line 193: | Line 181: | ||
# If the procedure fails to restore DAQ, call Sergey (DAQ on call) without any further disturbing the DAQ status. | # If the procedure fails to restore DAQ, call Sergey (DAQ on call) without any further disturbing the DAQ status. | ||
− | + | ===Establishing Physics Quality Beam for HPS:=== | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | ===Establishing | ||
# <font color='red'>'''Make sure SVT is retracted and both SVT and ECAL are OFF.'''</font> | # <font color='red'>'''Make sure SVT is retracted and both SVT and ECAL are OFF.'''</font> | ||
# <b>First send beam to the tagger dump:</b> | # <b>First send beam to the tagger dump:</b> |
Revision as of 15:46, 10 June 2019
[edit]
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingRun Spreadsheet 2019,2016, 2015HPS Upgrade ERR |
Procedures
|
Manuals |
JLab Logbooks
|
HPS 2019 run, June X to August Y'
Beam energy 4.5 GeV
Important: Document all your work in the logbook!
Bluejeans for Run Meetings on DAY and DAY at 2pm
RC: Stepan Stepanyan
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Valery Kubarovsky
- (757) 876-1789
- 9 876-1789 from Counting Room
Straight tracks run: June XX, 4:30 AM
Run Plan for June XX - YY, 2019Start close-up of the Hall at 3pm on Friday, June XX
When hall enters Beam Permit, turn on the chicaneEstablish beam to the tagger dump
Bring beam to FC:
Monday at 6:am
Important Notes:
SVT RECOVERY PROCDURES |
General InstructionsDAQ RECOVERYIf DAQ crashed/broken:
Establishing Physics Quality Beam for HPS:
Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA.
Setting up the FSD threshold
hpsrun@clonpc11> /home/hpsrun/scripts/FSD/Calc_FSD_Threshold.exe
|
Every Shift:
|
Every Run:
|
---|
|
|
|
Webcams:
|
Accelerator: |
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 310-7198 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5126, 5244, 5246, 5247 |
Hall-B Gas Shed | 7115 |