Difference between revisions of "The HPS Run Wiki"
Jump to navigation
Jump to search
Line 130: | Line 130: | ||
# <strike>Establish beam to the Faraday cup following the "General Guidelines" and Beamline Procedures. The required beam profile at 2H02A harp is X-width <~0.05 mm, Y-width <~ 0.050 mm</strike> | # <strike>Establish beam to the Faraday cup following the "General Guidelines" and Beamline Procedures. The required beam profile at 2H02A harp is X-width <~0.05 mm, Y-width <~ 0.050 mm</strike> | ||
# Restore ECal and Hodoscope | # Restore ECal and Hodoscope | ||
− | #* | + | #* Turn on HVs on ECal and Hodoscope |
− | #* | + | #* Record FADC rates without the target, make a snapshot of the sacaler GUIs for both detectors and send to the logbook with notes on the position of the highest rates in ECal that show beam position at ECal |
# Turn on the chicane, use "Chicane" GUI to set correct currents on the magnet (see instructions) | # Turn on the chicane, use "Chicane" GUI to set correct currents on the magnet (see instructions) | ||
− | #* | + | #* Check the ECal and hodoscope rates without the target at 50 nA, make a snapshot of the sacaler GUIs for both detectors and send to the logbook. Make note the highest rate position on ECal. |
− | #* | + | #* Insert the 4 um target and check ECal and hodoscope rates at 50 nA. Make a snapshot of the sacaler GUIs for both detectors and send to the logbook. |
#* <strike>Check ECal and hodoscope rates as a function of the target position. Starting from the nominal position of the 4 um foil, move the target ladder towards 8 um W foil with 0.5 mm steps using expert GUI. Record target position and the ECal and hodooscope scaler rates. </strike> | #* <strike>Check ECal and hodoscope rates as a function of the target position. Starting from the nominal position of the 4 um foil, move the target ladder towards 8 um W foil with 0.5 mm steps using expert GUI. Record target position and the ECal and hodooscope scaler rates. </strike> | ||
# Setup FSD thresholds/rates and ECal/hodoscope rates using 4 um W target to up 400 nA beam. Note: thresholds on FSD must be changed while scanning. Record rates in the logbook. Call beamline expert if needed. | # Setup FSD thresholds/rates and ECal/hodoscope rates using 4 um W target to up 400 nA beam. Note: thresholds on FSD must be changed while scanning. Record rates in the logbook. Call beamline expert if needed. |
Revision as of 15:40, 17 June 2019
[edit]
Phone NumbersShift ScheduleShift-Taker's ChecklistHot CheckoutBeam Time AccountingRun Spreadsheet 2019,2016, 2015HPS Upgrade ERR |
Procedures
|
Manuals |
JLab Logbooks
|
HPS 2019 run, June X to August Y'
Beam energy 4.5 GeV
Important: Document all your work in the logbook!
Bluejeans for Run Meetings on DAY and DAY at 2pm
RC: Stepan Stepanyan
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Valery Kubarovsky
- (757) 876-1789
- 9 876-1789 from Counting Room
* !! Chicane magnets can be energized only when the hall is in Beam Permit, [1]. Chicane magnets must be off if the hall is in Restricted or in Controlled access.
* The vacuum gauge used in SVT interlock (2H03) is broken. Watch the gauge 2H02, in case of a vacuum event valves will close and the beam will be shut-off. If the event is at 2H02 (loss of vacuum near HPS chamber) call SVT expert immediately and follow his/her instruction.
Run Plan June 17 - 18, 2019== Establish beam to the tagger dump ==
Bring beam to FC
Important Notes:
|
General InstructionsDAQ RECOVERYIf DAQ crashed/broken:
Establishing Physics Quality Beam for HPS:
Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA.
Setting up the FSD threshold
hpsrun@clonpc11> /home/hpsrun/scripts/FSD/Calc_FSD_Threshold.exe
|
Every Shift:
|
Every Run:
|
---|
RC daily meetings at 2 pm in the counting-house 2nd-floor conference room.
BlueJeans Info:
URL: https://bluejeans.com/794825703
Meeting ID: 794825703
|
|
|
Webcams:
|
Accelerator:
|
Slow Controls:
|
Online & Offline: |
System/Person | Pager/Phone Number |
---|---|
Run Coordinator | (757) 575-7540 (cell) |
Physics Div. Liaison | (757) 876-1789 (cell) |
MCC-OPS | 7048 |
Crew Chief | 7045 |
Crew Chief | 9-879-3367 (cell) |
Program Deputy | 9-876-7997 (cell) |
Gate House Guard | 5822 |
DAQ/Online | (757) 869-2188 (cell) |
SVT | (757) 310-7198 (cell) |
ECAL | (757) 810-1489 (cell) |
Slow Controls | (757) 748-6922 (cell) |
Beamline | (757) 303-3996 (cell) |
Engineering | (757) 748-5048 |
Hall-B Floor | 5165 |
Hall-B Space Frame | 5170, 5171 |
Hall-B Forward Carriage | 5371 |
Hall-B Counting Room | 5126, 5244, 5246, 5247 |
Hall-B Gas Shed | 7115 |